Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Computer Engineering Expert

You are asked to develop a GIS database of information about Vietnam at a scale of 1:100,000. The database will include the following: 
Elevation in meters
Locations of hospitals
Roads
Map of each province with population of the province

a) Which of these features are best represented by a raster model? Why?

b) For those features that are best represented in vector format, which would be best represented by point entities, which would be line entities, and which would be polygon entities? 

Computer Engineering, Engineering

  • Category:- Computer Engineering
  • Reference No.:- M9649610

Have any Question?


Related Questions in Computer Engineering

Pablo bought some rural property in oconee county that is

Pablo bought some rural property in Oconee County that is rumored to be part of an expansion of the Epps Bridge Center phenomenon. The developer of the party told him that the property could triple in value under the exp ...

Suppose you would like to sort n music files using a

Suppose you would like to sort n music files using a comparison-based sorting algorithm (i.e. no bucket sort), but you only have an old, unreliable computer, which you have nicknamed "Rustbucket". Every time Rustbucket c ...

Question please review the description of the organization

Question: Please review the description of the organization that is the subject of your semester project. The description of that organization, CITY GENERAL HOSPITAL, is described in the instructions for Phase I that you ...

We have recovered a flash drive with a password-protected

We have recovered a flash drive with a password-protected archive. Help decrypt it. What is the password used to encrypt the archive? It's a zip file, how do I get the password, what kali linux commands I use?

1 what is the boolean expression for an and gate2 what is

1. What is the Boolean expression for an AND gate? 2. What is the Boolean expression for an OR gate? 3. What is the Boolean expression for a NOT gate?

A new machine averages 4 clock cycles per instruction and

A new machine averages 4 clock cycles per instruction, and runs at a system clock of 20 MHz. The Axiom-Verge algorithm set to benchmark the system will take an even 3000 instructions to complete. a) Knowing how many cloc ...

Question suppose that an organization did not use processes

Question : Suppose that an organization did not use processes that were designed and built to be agile, particularly when it comes to IS / IT technologies. Predict the impact of environmental changes on an organization f ...

Question suppose that in addition to edge capacities a flow

Question : Suppose that, in addition to edge capacities, a flow network has vertex capacities. That is each vertex v has a limit l(v) on how much flow can pass through v. Show how to transform a flow network G = (V, E) w ...

Question suppose that x 00271 and y 608 are correctly

Question : Suppose that x* = 0.0271 and y* = 6.08 are correctly rounded versions of x and y to 3 digit mantissas. The smallest interval [a,b] that would contain x is [0.02705, 0.02715] since 0.0271 is between those numbe ...

Write a c functionnbspescapechar s char tnbspthat converts

Write a C function escape(char s[], char t[]) that converts the characters newline and tab into two character sequences n and t as it copies the string t to the string s. Use the C switch statement. Also write the revers ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As