Ask Question, Ask an Expert

+1-415-315-9853

info@mywordsolution.com

Ask Other Engineering Expert

problem 1: Many hills in California are known to have troubles with landslides when heavy rains soak the area. The clay smectite is frequently found as a major mineral component within the soils of these hills. Smectite is known as a phyllosilicate (layered or sheet silicate: see figure below).

375_Schematic structure of smectite.jpg

The California Geological Survey analyzed two samples using XRD: one dry soil, and one wet soil. The XRD powder pattern for the dry smectite-rich soil is shown in figure below. Using the Bragg equation (assuming n = 1) and the fact that Cu Kα radiation was used (where λ = 1.541 Å), what is the d-spacing for the (001) peak found at 2θ = 5.82o?

24_powder pattern dry smectite-rich soil.jpg

problem 2: For the wet soil sample, the (001) peak shifts to 2θ = 4.20o. find out the d-spacing for the wet smectite.
 
problem 3: What happened to the smectite crystal structure, when it was exposed to water?
 
problem 4: The shape of the dry smectite (001) diffraction peak (and others) in Figure above is not symmetrical: sharp on the low 2θ side and very broad on the high 2θ side. What does the shape indicate about the distribution of the d-spacings associated with that diffraction peak?
 
problem 5: How does this structural change in smectite relate to the larger scale structural instability of the landforms when exposed to heavy rain?

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M92714

Have any Question? 


Related Questions in Other Engineering

Lab ac modelsintroductionthe lab is based on the ac models

Lab: AC Models Introduction: The lab is based on the AC models of a transistors. After the transistor has been biased with a Q-point near the middle of the load line, we can couple a small AC voltage into the base. This ...

Assignmentwhy program design is importantanswer the

Assignment Why Program Design is Important? Answer the following questions: 1. What is a program design? 2. Why program design is important? 3. What program design tools are available? Discuss in details by studying at l ...

Microcomputers lab exploring pwmobjectives to gain a better

Microcomputers Lab: Exploring PWM Objectives: To gain a better understanding of Pulse Width Modulation. What you will need: Arduino UNO, Analog Discovery Kit (ADK), LU EE Component Kit, jump wires, a computer with instal ...

Microprocessorsmodule-simple automation systemsoverviewin

MICROPROCESSORS Module-Simple Automation Systems OVERVIEW In the final module, we cut the umbilical cord and try standalone operations of UNO board. You will learn about the applications of the AVR in various areas. We a ...

1given the following transfer function modelsy1su1s g11s

1. Given the following transfer function models: y 1 (s)/u 1 (s) = g 11 (s) = 2/(s+3) y 1 (s)/u 2 (s) = g 12 (s) = -1/(s+1) y 2 (s)/u 1 (s) = g 21 (s) = -1/(s+7) y 2 (s)/u 2 (s) = g 22 (s) = 0.5/(s+4) a) Draw the 2x2 ope ...

Assignmentan embedded system is any electronic system that

Assignment An embedded system is any electronic system that uses a CPU chip but that is not a general-purpose workstation, desktop, or laptop computer. It is a specialized computer system that is part of a larger system ...

1 represent the following decimal numbers in both binary

1. Represent the following decimal numbers in both binary sign/magnitude and two's complement using 16 bits: -29. 2. A Computer uses IEEE-754 format to represent floating points. What value (in decimal) the computer repr ...

Risk factors and gantt chartsquestion 1 project risk

Risk Factors and Gantt Charts Question 1: Project Risk factors • List the major risk factors for your project and the possible ways to mitigate this risks for your project. Question 2: Resource Evaluation • Produce and c ...

Time managementdiscuss some of the reasons why individuals

Time Management Discuss some of the reasons why individuals routinely over-estimate the time for project activities. How is this behavior detrimental to the schedule and project? Are some of these reasons more prevalent ...

Part -1chapter 1 - introduction introduce the project

Part -1: CHAPTER 1 - Introduction: Introduce the project problem; define the scope, aim and objectives of the investigations. CHAPTER 2 - Literature Review: Describe the literature/ theory reviewed which are relevant to ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

WalMart Identification of theory and critical discussion

Drawing on the prescribed text and/or relevant academic literature, produce a paper which discusses the nature of group

Section onea in an atwood machine suppose two objects of

SECTION ONE (a) In an Atwood Machine, suppose two objects of unequal mass are hung vertically over a frictionless

Part 1you work in hr for a company that operates a factory

Part 1: You work in HR for a company that operates a factory manufacturing fiberglass. There are several hundred empl

Details on advanced accounting paperthis paper is intended

DETAILS ON ADVANCED ACCOUNTING PAPER This paper is intended for students to apply the theoretical knowledge around ac

Create a provider database and related reports and queries

Create a provider database and related reports and queries to capture contact information for potential PC component pro