Home >> Other Engineering
Find the inductive reactance per mile of a single-phase overhead transmission line operating at 60 Hz, given the conductors to be Partridge and the spacing between centers to be 20 ft.
Other Engineering, Engineering
Task 1: Using the lab kit, design a circuit for the processor to control the output of a connected 7-segment LED display device. You will be provided with a standard common anode 7-segment display of the type FND-507 (or ...
Projection of Planes 1. A regular pentagon of 25 mm side has one side on the ground. Its plane is inclined at 45° to H.P. and perpendicular to the V.P. Draw its projections. 2. Draw the projection of a circle of 50 mm di ...
Question 1 . Define rock mechanics. Discuss the main objectives of the application of rock mechanics in mining. Question 2. Define stress. Draw a diagram and define the normal and shear stress by resolving the resultant ...
Part 1 Configure, verify and troubleshoot WAN links and IP services Answer to all questions below: 1. What is the name of the Safe Work Australia code of practise that provides guidance on how to manage the risks of elec ...
1. Online Discussion forum - Post your proposed topic and chosen data set as well as a short plan for the project. This is required for approval of the topic. As discussed, students must select unique topics, therefore i ...
Design a five bit signed comparator.
Mine Safety & Environmental Engineering Part 1. Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the following terms ...
Select a risk problem from the list below and prepare a risk management plan in accordance with AS/NZS ISO 31000:2009. Please ensure that: - Establish the context clearly, in accordance with the Standard; - Define your s ...
LOAD, FAULT LEVEL ANALYSIS & PROTECTION DESIGN OF A REMOTE AREA MICROGRID Assignment Please undertake the following analyses: 1. Calculate the 3-phase fault levels on Bus 2, Bus 3 and Bus 4 with the main supply connected ...
ASSIGNMENT 1 1. What is the purpose of ore reserve and resource estimation? Why are resource and reserve estimates important to the mining industry? 2. What is meant by ore? What is meant by the term waste? How is the di ...
Start excelling in your Courses, Get help with Assignment Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.
Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate
Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p
Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As
Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int
Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As