Explain the process of manufacturing ordinary Portland cement by vertical shaft rotary kiln method and write chemistry of hardening and setting of it with chemical equations. Describe the process of setting and hardening of cement concrete, giving the reactions involved in such process. What is the difference, if any, between “setting” and “hardening”?

Manufacture of cement by vertical shaft kiln technology:- Large big cement plants with large capital investment use rotary kiln technology but certain cement plant use vertical shaft kiln technology of long horizontal kilns used in dry and wet process. In VSK technology, pellets of raw material are made by pan nebuliser or palletise. Uniform pellets are then fed into VSK and good quality cement cements are obtained. Lime (calcareous), clay (argillaceous) and fuel (low volatile) are used as main raw material. In VSK, the fuel (coal) is mixed with proportioned batch of raw materials either by (1) Black meal process or (2) Fuel slurry process and it is converted to pellets with the help of palletise.

Black meal process: Raw materials are ground with coal in the calculated proportional to black meal. This powdered material is then converted into pellets by using (15%) water.

Fuel slurry process: Raw material is ground by separately while coal is ground wet separately with equal amount of water. Dry ground material and coal are mixed properly and converted into pellets.

Process: The ready pellets are fed into the vertical shaft kiln through a hopper. The kiln is lined with refractory and is filled up with clinker leaving about 2 feet. The pellets pass through the kiln from the top to downwards, and get heated and sintered by ascending hot gases. The whole coal charge composed of unburnt modules and clinker rest on a specially designed gate, rotating slowly at the bottom of the kiln. Various zones of reaction starting from the top of the kiln are:

1.      Preheating zone

2.      Calcining zone

3.      Sintering zone

4.      Cooling zone

The cold air is blown through the discharge unit to cool the sintered clinkers of cement. The air gets heated in cooling the clinkers which is then utilized in combustion of coal present in the pellets. The clinker is finally, extracted from kiln bottom through discharge gate and finally ground with 4.5% gypsum before packing.

Advantages of vertical shaft kiln technology:

1.      Due to use of pellets and low velocity of exit gases, no dust is discharged into the atmosphere. So air pollution is less.

2.      Control over the shape of pellets reduces the wear of grinding machinery.

3.      The plant is quite compact since the kiln is usually 10 meters tall.

4.      It has lower maintenance cost and requires less capital investment.

Reactions:

  CaCO3 = CaO + CO2

2CaO + SiO2 = 2CaO.SiO2

3CaO + SiO2 = 3CaOSiO2

3CaO + Al2O3 = 3CaO.Al2O3

4CaO + Fe2O3 + Al2O3 = 4CaO.Fe2O3.Al2O3

Setting and hardening of Portland cement:-

When water is mixed with cement, it forms a paste like mass, a hydration of compounds in cement take place. This fluid like paste eventually becomes stiff and then hard. This action of change of mixture from a fluid (paste) to solid is known as setting of cement. During the process the gel is formed which adheres firmly to stones sand etc. Binding them together to form a solid mass which on setting and hardening has a great mechanical strength and forms valuable building material. The process of solidification comprises 3 stages.

1.      Initial set: When cement is mixed with water a plastic mixture is formed which can moulded as desired as the action of setting take place gradually in 60 minutes or so. But with the time mixture begins to lose its plasticity marked by slight jellifying of the cement paste. Further it should not be disturbed until it has hardened. In initial set stage paste attains stiffness.

2.      Final set: It takes place after few hour of mixing. Then concrete mixture can neither be moulded into any shape nor can it be remixed. As the final setting of cement take place the mass attains such a stiffness that the standard needle cannot penetrate in the cement mass at all.

Hardening: CaCO3 = CaO + CO2

2CaO + SiO2 = 2CaO.SiO2

3CaO + SiO2 = 3CaOSiO2

3CaO + Al2O3 = 3CaO.Al2O3

4CaO + Fe2O3 + Al2O3 = 4CaO.Fe2O3.Al2O3

3.      Hardening: After final setting of the solid cement material begins to gain strength and it is this increase in strength which is known as hardening. The hardening or development of strength depends on chemical. Combination of cement and water and thus continue with a great speed in the beginning but afterward speed is reduced. The hardening of concrete stops as it is dried out. But if it is kept moist, the hardening process can continue for years. However, the rate of hardening decreases as the time passes. The hydration reactions are exothermic and the volume of cement increases with hydration. In the larger structures of concrete, the heat evolved is somehow removed and allowances for expansion are provided. Hydrated cements dissociate on heating by destroying the bond which held the mass together.

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M9502330

Have any Question?


Related Questions in Other Engineering

Assessment practical reportproduce a short technical report

Assessment: Practical Report Produce a short technical report in a form consistent with proteomic journals covering the techniques, results and interpretation of your proteomics experiment in the practical classes. The r ...

Question 1 define rock mechanics discuss the main

Question 1 . Define rock mechanics. Discuss the main objectives of the application of rock mechanics in mining. Question 2. Define stress. Draw a diagram and define the normal and shear stress by resolving the resultant ...

Engineering analysis assignment -for every problem provide

Engineering Analysis Assignment - For every problem, provide The MATLAB script/function files that solve the problems. Problem 1: Plot the function f(t) = (x+5) 2 /(4+3x 2 ) for -3 ≤ x ≤ 5. using plot command. Use the ar ...

Homework - risk and decision management1 you are working

Homework - Risk and Decision Management 1) You are working program X. The total budget allocated to the program is $100 M and it is to be completed in 24 mo. range (R) and passenger capacity (C) are two key performance p ...

Learning outcomes evaluate multiuser communication and

Learning Outcomes Evaluate multiuser communication and resource sharing techniques; Apply the techniques of, and report on, digital communication applications using Matlab and hardware devices. Assignment Description The ...

Assignment -problem 1 - given is the lcc difference

Assignment - Problem 1 - Given is the LCC difference equation that represents some LTI system: y(n) - ¾y(n-1) - ¼y(n-2) = x(n) + x(n-1)   a) Find the impulse response of the system (solve the LCCDE). b) Draw a block diag ...

Assignment 11 what is the purpose of ore reserve and

ASSIGNMENT 1 1. What is the purpose of ore reserve and resource estimation? Why are resource and reserve estimates important to the mining industry? 2. What is meant by ore? What is meant by the term waste? How is the di ...

Projection of planes1 a regular pentagon of 25 mm side has

Projection of Planes 1. A regular pentagon of 25 mm side has one side on the ground. Its plane is inclined at 45° to H.P. and perpendicular to the V.P. Draw its projections. 2. Draw the projection of a circle of 50 mm di ...

Mine safety amp environmental engineeringpart 1 questions1

Mine Safety & Environmental Engineering Part 1. Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the following terms ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As