problem 1)a) describe the well design considerations for high pressure, high temperature deep drilling program. prepare down the possible challenges and solution in brief.

b) describe the step by step operation of lowering TGB and drilling 30º hole and lowering structural casing and cementation in deep water drilling with appropriate sketches.

problem 2)a) Compute new kG if rig displacement of 21000 Tons and kG of 58 feet. A weight of 180 tons with VCG of 11 ft is moved to VCG of 167 ft.

b) describe different mathematical equations to find out wind, wave and current forces acting on offshore structures. State and describe assumptions and parameters of these equations.

problem 3)a) describe Lower Marine Riser Pack (LMRP). Draw typical subsea BOP stack with LMRP.

b) describe Dynamic Positioning System of station keeping in detail

problem 4)a) prepare brief notes on:

i) Subsea Diving System.

ii) Riser design considerations.

b) Draw neat schematic diagram of a, ‘typical subsea well completion system.’ Indicate all the features.

problem 5)a) What is tension leg platform? describe design considerations in brief, for the same.

b) Describe tubular joint classification in brief with suitable sketch.

problem 6)a) What is well cementation? Describe a typical well cementation programme for deep water (offshore) well.

b) prepare down the types of subsea horizontal trees in detail.

problem 7) prepare brief notes on:

a) Marine terminals and transport.

b) Offshore safety.

c) Forces and motions acting on fixed platform.

problem 8)a) describe in detail productive formation testing methods, in brief.

b) Describe design consideration in oil and gas pipeline.

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M95724

Have any Question? 


Related Questions in Other Engineering

Time managementdiscuss some of the reasons why individuals

Time Management Discuss some of the reasons why individuals routinely over-estimate the time for project activities. How is this behavior detrimental to the schedule and project? Are some of these reasons more prevalent ...

Electronics assignment1 using pspice simulation print the

Electronics Assignment 1. Using PSpice simulation, print the waveforms of the following values for the circuit below (V S =100 mVpp, 1kHz). You can choose any npn transistor for the transistors in the circuit. a. Operati ...

Assignmentsuppose a large aerospace engineering firm has

Assignment Suppose a large aerospace engineering firm has immediately hired you as a consultant to investigate a potential violation of corporate policy and data theft. You have been informed that an employee may have be ...

I have a project about sound detect i am using chipkit

I have a project about sound detect. I am using (ChipKit Max32) as microcontroller and (Bob_09964) as microphones (3 of them to be used) I want the following things: 1- The software codes of (ChipKit Max32) which uses MP ...

History of architecture and urbanismpick five questions

History of Architecture and Urbanism PICK FIVE QUESTIONS TOTAL TO BE ANSWERED: Each answer must be 150 to 400 words. To be typed, not hand­written. Email your final exam to your discussion leader. 1. The concept of "mode ...

Power flow project -figure 1 shows a single-line diagram of

Power Flow Project - Figure 1 shows a single-line diagram of a five-bus power system. Input data are given in Tables 1, 2, and 3. As shown in Table 1, bus 1 is the swing bus, to which a generator is connected. Bus 3 is a ...

Technical memo based on a provided excel sheetsreport your

Technical MEMO based on a provided excel sheets Report your results to Dr. Robin Hood, Director of Applications Department, in a technical memo, no longer than 3 pages. Note that Dr. Hood has a strong background in fuel ...

Introduction to signal analysis project music

Introduction to Signal Analysis Project: Music Synthesis Project Definition: The objective of this project is to synthesize musical signals. You will generate harmonic tones and use them to perform well-known melodies. M ...

Risk factors and gantt chartsquestion 1 project risk

Risk Factors and Gantt Charts Question 1: Project Risk factors • List the major risk factors for your project and the possible ways to mitigate this risks for your project. Question 2: Resource Evaluation • Produce and c ...

Assignment automated teller machine atmon an automated

Assignment: Automated Teller Machine (ATM) On an automated teller machine (ATM), the customer is identified by inserting a plastic ATM card with a magnetic stripe or a plastic smart card with a chip that contains a uniqu ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

WalMart Identification of theory and critical discussion

Drawing on the prescribed text and/or relevant academic literature, produce a paper which discusses the nature of group

Section onea in an atwood machine suppose two objects of

SECTION ONE (a) In an Atwood Machine, suppose two objects of unequal mass are hung vertically over a frictionless

Part 1you work in hr for a company that operates a factory

Part 1: You work in HR for a company that operates a factory manufacturing fiberglass. There are several hundred empl

Details on advanced accounting paperthis paper is intended

DETAILS ON ADVANCED ACCOUNTING PAPER This paper is intended for students to apply the theoretical knowledge around ac

Create a provider database and related reports and queries

Create a provider database and related reports and queries to capture contact information for potential PC component pro