Excel Instructions-

Part 1 - Organization

Within this set of instructions, you will be shown how to set up your spreadsheet with given raw data in an organized manner.

1. Start Microsoft Excel and select blank workbook.

2. Insert Raw Data into Workbook

Data > From Text > rawdata.txt > Import > Finish > OK

3. Rename Sheet by double clicking the sheet name in the bottom right of the spread sheet. Label as 'Raw Data'

Note: Never delete or modify raw data.

4. Separate Runs onto multiple sheets

Right click 'Raw Data' sheet tab > Move or Copy > Create a copy

Rename new sheet Run #1

Repeat this until you have separate sheets labeled

5. Cleaning up sheets

In Run #1, Highlight columns E-P (Runs #2-#4) and Right Click to Delete the data.

Repeat this in the other sheets so that only the Run # for the sheet name is showing.

6. Delete Time and Speed Columns for all runs. We will not need that data for this lab.

7. Final Adjustment to the Sheets

In sheet Run #1, either drag and move data down, or insert rows above Position and Force Columns.

Part 2 - Math Operations

Within these instructions, students are introduced to the math operations and calculating power of Excel. We pick up where we ended in the "organization" instructions. The following table is a filled with commonly used excel operations you will use throughout the semester. These are NOT the only commands that exist, there are THOUSANDS of commands that can be found through the help function or via an internet search.

Statistics

Trigonometry

Graphing

General

=Average()

=PI()

=SLOPE()

=SQRT()

=Median()

=SIN()

=MAX()

=SUM()

=STDEV.P()

=Radians()

=MIN()

=ABS()

=STDEV.S()

=Degrees()

 

=COUNT()

 

=COS()

 

 

 

=TAN()

 

 

 

 

 

 

Functions-

1. In Column D, next to the Force data, TYPE 'Stress' and 'Strain'

The stress being calculated is an axial stress. The formula for axial stress is Stress=Force/Area

The diameter of the circular cross section = 3.302 mm, find the area.

2. Calculate Stress

Select the cell directly under 'Stress' and TYPE the equation =Force/(diameter^2*PI()*0.25), where "Force" and "diameter" are their respective cells

As seen above in my formula bar, my force cell was C9, and my diameter cell was E4. You will notice also, in the formula bar above, there are $ in front of the E and 4. The $ isolates the cell/variable so that when you copy the cell, the formula is not copied but stays the same. For this equation, the diameter never changes so I put a $ in that cell.

3. Calculate Strain

The strain being calculated can be found from the following equation:

Ε = Δl/l0

For this Lab, l0 is equal to the Gauge Length and ?l refers to the position column.

Select the cell directly under 'Strain' and TYPE the equation = Position/Gauge Length

The gauge length is = 35 mm

4. Copy formulas down to the bottom of data set

Highlight the first box of stress and strain. Double click the small green square in the bottom right corner of the highlighted cells.

5. Repeat steps for the remaining 3 materials.

6. You should find by yourself the mechanical properties of the remaining materials

Part 3- Graphing

In this set of instructions, students are shown how to graph the data set from previous modules.

1. In Sheet Run #1, select INSERT > Scatter Plot

It should give an empty graph, if not, that is ok, you can adjust it later

Right Click the graph, and Select Data. If your graph is empty, then you will just need to ADD data. If Data already appears in the legend entries, REMOVE all to clear.

Click Add and you will get a box that looks like this...

The series name can be a referenced cell, or you can type the name, for this lets Reference a cell...

Click the select range button then Select the Cell that contains the name of the material, '2024-T3 Aluminum'

Click the select range button for Series X Values, These will be our STRAIN values. Highlight all the Strain Data.

Click the select range button fro Series Y Values, These will be our STRESS values.

Highlight all the Stress Data.

Concept Check: EXCEL

Refer to the instructions above on the proper way to organize, analyze, and graph your data.

1. Transfer the Raw Data into EXCEL

2. Organize the data

3. Perform math operations

4. Graph the data

Once you have completed ALL of the steps for ALL of the materials. Upload and submit your .xlsx file into this Assignment.

Attachment:- Assignment.rar

Computer Engineering, Engineering

  • Category:- Computer Engineering
  • Reference No.:- M91954928

Have any Question?


Related Questions in Computer Engineering

Reflective journal entryneed reflective journal entry on

Reflective Journal Entry Need Reflective Journal Entry on writing a Background Assignment The Topic;: One of the most common questions that new students learning programming students ask is what programming language shou ...

Situation you are designing a system with a requirement to

Situation: You are designing a system with a requirement to provide direct access to 10,000 records. The data file grows at a rate of 5% per year. Evaluate the effect of a static hashed file with a load factor of .45. 1. ...

Supposed datagrams are limited to 1600 bytes including

Supposed datagrams are limited to 1600 bytes (including header, with header size = 40) between host A and destination host B. Assuming a 20-byte IP header; further assume that the data is carried in TCP segments, with ea ...

Riditna paper withdraws river water for use in its paper

Riditna Paper withdraws river water for use in its paper mill, and returns it, along with waste effluent, back into the river. (Effluent is a co-product of Riditna's paper, such that production of each ream of paper gene ...

Using a telephone survey of 400 randomly selected

Using a telephone survey of 400 randomly selected registered voters, he solicits both their party identification and whether or not they had read the newspaper that day. The results are displayed in the following cross-t ...

Need help with a java program that takes two arrays a and b

Need help with a Java program that takes two arrays a and b of length 5 storing int values, and returns the dot product of a and b. That is, it returns an array c of length n such that c[i]=a[i]*b[i].

A sample of 40 songs from a students itunes playlist showed

A sample of 40 songs from a student's iTunes playlist showed a mean length of 3.542 minutes with a standard deviation of 0.311 minute. Construct a 95% confidence interval for the population standard deviation.  (Round yo ...

Discuss how an enterprise architecture can establish

Discuss how an Enterprise Architecture can establish governance mechanisms?

At a certain temp the kp for the decomposition of h2s is

At a certain temp, the Kp for the decomposition of H2S is .883. H2S (g) ----> H2(g) + S (g) Initially, only H2S is present at a pressure of  .181 atm  in a closed container. What is the total pressure in the container at ...

Listen to or read the transcript of this podcast

Listen to (or read the transcript of) this podcast (https://www.stlouisfed.org/education/economic-lowdown-podcast-series/episode-16-elasticity-of-demand) from the Federal Reserve Bank of St. Louis. Describe your experien ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As