Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Other Engineering Expert

Environmental engineering

Question 1: Analysis of the movement of a tracer in a contaminated aquifer indicates that the local Darcy velocity is 1.2 m/d. The aquifer has a hydraulic conductivity of 14.0 m/d, a depth of 11 m, and a porosity of 0.3. How long will it take a contaminant with a retardation factor of 3.0 to travel 50 m? For approximately what fraction of that time do you think the contaminant will be adsorbed to solids in the aquifer, as opposed to being dissolved in the moving water?

 

Question 2: Sometimes pump-and-treat systems use a combination of injection wells and withdrawal wells to simultaneously “push” and “pull” contaminated groundwater toward the locations where it is drawn to the surface for treatment. Consider a system in which a straight line of injection 2.0-m-diameter wells has been constructed on one side of a contaminated site, and a parallel line of identical withdrawal wells has been constructed on the other side. The two lines of wells are separated by 100 m, and the wells are spaced at 10-m intervals in each line. Before pumping is initiated, the water layer in the unconfined aquifer is 40 m thick. The hydraulic conductivity in the aquifer is 5 x 10 -4 m/s . 

Note that, in this system, near the injection wells, the water level will be higher when the wells are pumped than when they are not pumped. That is, the wells will generate a “drawup” rather than a drawdown. One of the convenient generalizations of groundwater flow is that the drawdown of the piezometric head at any location when multiple wells are present is simply the sum of the drawdowns that would develop at that location from each well operating independently. Similarly, the ‘draw-up’ of an injection well with flow rate Q is equal in magnitude (but opposite in direction) to the drawdown that would be induced if the well were withdrawing water from the aquifer at a flow rate of Q.

(a) Derive equation for the water depth as a function of distance from the withdrawal wells if only those wells are operating. To simplify the analysis, assume that the system can be modeled as though water withdrawal occurs uniformly along the whole line of wells, rather than at specific points. 

(b) When only the withdrawal wells are operating, as in the scenario in part (a), the drawdown at the perimeter of the withdrawal wells is 12 m. If both sets of wells are turned on and all the wells operate with flow rates of 0.25 m3/min, plot the height of the piezometric surface between the two lines of wells, as a function of distance from the line of withdrawal wells. (Hint: Use the information for drawdown caused by the withdrawal wells to compute the draw-up caused by the injection wells, and then add the drawdown and draw-up at each location to find the net change in the water table at that location.)

 

Question 3: A pump-and-treat system has been installed at a Superfund site to capture a deep plume of contaminated groundwater, and the water that has been pumped out is being stored in a fiberglass tank for subsequent treatment. The water contains a mixture of chloride and the solvent trichloroethylene (TCE). However, the tank has been ruptured by an over-aggressive fork-lift driver, allowing the liquid to leak into a shallow groundwater system. The porosity of the soil is approximately 0.2 and the density of the soil grains is 2.8 g/cm3.

After 100 days, the chloride plume is approximately 190 m long, and the TCE plume is only 26 m long. Treating the spill as an instantaneous point-source, and assuming that the chloride behaves as a conservative solute and that biodegradation is  negligible, estimate the retardation factor, R, for TCE in the aquifer.

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M9731689
  • Price:- $15

Priced at Now at $15, Verified Solution

Have any Question?


Related Questions in Other Engineering

Projection of planes1 a regular pentagon of 25 mm side has

Projection of Planes 1. A regular pentagon of 25 mm side has one side on the ground. Its plane is inclined at 45° to H.P. and perpendicular to the V.P. Draw its projections. 2. Draw the projection of a circle of 50 mm di ...

Assignment 11 what is the purpose of ore reserve and

ASSIGNMENT 1 1. What is the purpose of ore reserve and resource estimation? Why are resource and reserve estimates important to the mining industry? 2. What is meant by ore? What is meant by the term waste? How is the di ...

A detailed review of spatial modulation and simulation

A Detailed Review of Spatial Modulation and Simulation Learning Outcomes a. Learn how to model mobile communication channels d. Discern knowledge development and directions on the recent advances in 4G to the research pr ...

This is your second design assignment this assignment

This is your second design assignment. This assignment requires you to design a complex state machine. You are designing a digital alarm clock. There are various designs you can attempt. More complex designs are worth mo ...

Part 1configure verify and troubleshoot wan links and ip

Part 1 Configure, verify and troubleshoot WAN links and IP services Answer to all questions below: 1. What is the name of the Safe Work Australia code of practise that provides guidance on how to manage the risks of elec ...

Mine safety amp environmental engineering assignment -part

Mine Safety & Environmental Engineering Assignment - Part 1 - Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the fo ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

Learning outcomes evaluate multiuser communication and

Learning Outcomes Evaluate multiuser communication and resource sharing techniques; Apply the techniques of, and report on, digital communication applications using Matlab and hardware devices. Assignment Description The ...

Control theory - lab reportsfor experiments 1 to 4 you must

Control Theory - Lab Reports For experiments 1 to 4 you must undertake the following: a) At the start of each section (including the pre-lab activities) there are a number learning outcomes. That is, what students should ...

Assessment practical reportproduce a short technical report

Assessment: Practical Report Produce a short technical report in a form consistent with proteomic journals covering the techniques, results and interpretation of your proteomics experiment in the practical classes. The r ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As