Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Other Engineering Expert

Discrete-State Process Control

Work the problems below.  To receive any credit, you must show all work.  You may submit your work in a word processing document or in a pdf file.  Graphic files are not acceptable submissions.  Your file submission document should be entitled Week7AYourGID (replace YourGID with your specific GID).

  1. Produce a ladder diagram that will cause output Y  to go HIGH when switch A and B are closed OR when switch C is closed.  (Hint:  Start with the Boolean equation).
  2. Design the ladder diagram for a new Ford truck door/safety belt system.  When the truck door is open and the seat belt is not clicked in, the truck will not start.  If door is closed and seat belt is clicked in, the key will start the ignition.
  3. Create a ladder diagram to control a washing machine. This washing machine would have a fill cycle to one level, a 10 second wash cycle, a 10 second rinse cycle and then drain. Include a start button, low level switch, high level switch, an agitator motor, a fill valve and a drain valve.
  4. A control system is needed to control a small shopping center parking lot lighting system and the exterior lighting for the building. The design specifications require that the parking lot lighting and the exterior lighting turn on at dusk automatically. The parking lot lighting should automatically turn off at midnight but the building exterior lighting should remain on until dawn when it is turned off automatically. The system should repeat daily and should not require adjustment for the change in the seasons. Locate and specify an appropriate sensor if it is to operate at 120 vac as an input to a PLC. Create the ladder diagram to accomplish the specified control. Paste the sensor specifications into your document.

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M91804088
  • Price:- $50

Priced at Now at $50, Verified Solution

Have any Question?


Related Questions in Other Engineering

Assessment practical reportproduce a short technical report

Assessment: Practical Report Produce a short technical report in a form consistent with proteomic journals covering the techniques, results and interpretation of your proteomics experiment in the practical classes. The r ...

Engineering materials term paper assignment -conduct a

ENGINEERING MATERIALS TERM PAPER ASSIGNMENT - Conduct a thorough literature search and write a 15-20 page technical review paper on the evolution of the engineering materials used in the manufacturing of any one of the f ...

Assignment 11 what is the purpose of ore reserve and

ASSIGNMENT 1 1. What is the purpose of ore reserve and resource estimation? Why are resource and reserve estimates important to the mining industry? 2. What is meant by ore? What is meant by the term waste? How is the di ...

Task 1using the lab kit design a circuit for the processor

Task 1: Using the lab kit, design a circuit for the processor to control the output of a connected 7-segment LED display device. You will be provided with a standard common anode 7-segment display of the type FND-507 (or ...

Conceptual design of forced-free-mixed convection

Conceptual Design of Forced-Free-Mixed Convection Experiment This assessment is to be completed individually. 1. Learning Outcomes: - Develop a basic ability to conceptually design an experimental apparatus - Use theory ...

Load fault level analysis amp protection design of a remote

LOAD, FAULT LEVEL ANALYSIS & PROTECTION DESIGN OF A REMOTE AREA MICROGRID Assignment Please undertake the following analyses: 1. Calculate the 3-phase fault levels on Bus 2, Bus 3 and Bus 4 with the main supply connected ...

Learning outcomes evaluate multiuser communication and

Learning Outcomes Evaluate multiuser communication and resource sharing techniques; Apply the techniques of, and report on, digital communication applications using Matlab and hardware devices. Assignment Description The ...

Select a risk problem from the list below and prepare a

Select a risk problem from the list below and prepare a risk management plan in accordance with AS/NZS ISO 31000:2009. Please ensure that: - Establish the context clearly, in accordance with the Standard; - Define your s ...

This is your second design assignment this assignment

This is your second design assignment. This assignment requires you to design a complex state machine. You are designing a digital alarm clock. There are various designs you can attempt. More complex designs are worth mo ...

Q 1a discontinuity is found fully developed from the toe to

Q. 1 A discontinuity is found fully developed from the toe to the bench surface on a 15 m high slope, slope angle 65°. The discontinuity (frictional angle 32° and cohesion 20 kN/m2) is planar and its strike is parallel t ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As