1) Describe the coal handling system in detail.

2) Describe about any two dust collectors with the help of neat sketch.

3) Specify the various kinds of cooling towers. Describe any two cooling towers with the help of neat sketch.

4) Compute the boiler thermal efficiency, if the boiler produces 20,000 kg of steam at 10 bar dry and saturated. The amount of coal used is 2000 kg and the calorific value of coal is 36,000 kJ/kg. The feed water enthalpy is 448 kJ/kg.

5) Develop a sketch, describe the closed cycle and open cycle gas turbine.

6) Describe the several elements of nuclear reactor briefly.

7) describe photovoltaic cells with the help of neat sketch.

8) Draw and specify the tidal power plants.

9) A power plant supplies the following loads to customers:

Time in hrs         0 -5     5 - 9     9 - 12     12 -17     17 - 20     20 – 22    22 - 24
Load in MW         30       60         75          50            90               80             50

a) Sketch the load curve

b) Find the load factor of the power plant and energy consumed during 24 hours.

10) Describe the treatment of waste water from the demineralization plant in order to control the water pollution.

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M913611

Have any Question? 


Related Questions in Other Engineering

Assignment detailsa company is at the start of the process

Assignment Details A company is at the start of the process of designing a new 7 storey office block to be located in Preston (England) with a single stair. The floor to floor height is to be 3.4m with the top storey of ...

Question 1 the two basic kinds of transistor circuits are

Question 1 The two basic kinds of transistor circuits are amplifying and switching. True False Question 2 The bridge rectifier is similar to a full-wave rectifier because it produces a full-wave output voltage. True Fals ...

1 for a 77t truck with gross vehicle weight gvw of 136078

1. For a 77t truck with Gross Vehicle Weight (GVW) of 136078 kg with dual rear tyres and a tyre inflation pressure is 120 psi (or 8.43 kg/cm 2 ). Use the equivalent single tyre loading. i. Determine the contact surface a ...

Digital communication assignment -assignment outcomes1

Digital Communication Assignment - Assignment Outcomes 1. Differentiate the types of pulse modulation techniques implemented in communication systems; 2. Critically evaluate the baseband demodulation and detection techni ...

Microprocessorsmodule-simple automation systemsoverviewin

MICROPROCESSORS Module-Simple Automation Systems OVERVIEW In the final module, we cut the umbilical cord and try standalone operations of UNO board. You will learn about the applications of the AVR in various areas. We a ...

Robotics assignment-investigation into the control of an

Robotics Assignment- Investigation into the control of an electric motor using MatLab. An electric motor can be described by  the following two coupled second order differential equations, see the PowerPoint notes for a ...

Electronics i and labbridge rectifierintroductionthe lab is

Electronics I and Lab Bridge Rectifier Introduction: The lab is based on the previous lab from week 2 on half-wave and full-wave rectifiers and taking that knowledge to build a bridge rectifier. Materials and Equipment: ...

Design and build a counter that can display the sequence

Design and build a counter that can display the sequence assigned to you by the instructor (see table below). Use two J-K flip-flops for the two most significant bits and two D flip-flops for the two least significant bi ...

This homework is part of a private kaggle competition in

This homework is part of a private Kaggle competition, in the end we only want to submit an excel file with ID and Expected column, and I need the R code as well to submit. I am attaching the data files, both should be u ...

Time managementdiscuss some of the reasons why individuals

Time Management Discuss some of the reasons why individuals routinely over-estimate the time for project activities. How is this behavior detrimental to the schedule and project? Are some of these reasons more prevalent ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

WalMart Identification of theory and critical discussion

Drawing on the prescribed text and/or relevant academic literature, produce a paper which discusses the nature of group

Section onea in an atwood machine suppose two objects of

SECTION ONE (a) In an Atwood Machine, suppose two objects of unequal mass are hung vertically over a frictionless

Part 1you work in hr for a company that operates a factory

Part 1: You work in HR for a company that operates a factory manufacturing fiberglass. There are several hundred empl

Details on advanced accounting paperthis paper is intended

DETAILS ON ADVANCED ACCOUNTING PAPER This paper is intended for students to apply the theoretical knowledge around ac

Create a provider database and related reports and queries

Create a provider database and related reports and queries to capture contact information for potential PC component pro