Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Other Engineering Expert

QUESTION  :- 1

Design Problem: An ore body dips at 70° and has a vertical depth of 140m. The top of the ore body is 180m from the surface and surface mining operations have been discarded in favour of underground operations. The strike length of the deposit is 850m. The ore body varies from 8m to 20m and averages 15m. Grades are as follows:

Lead = 10% (90% recovery)

 Zinc =15% (85% recovery)

 Silver =120 g/t (60% recovery)

 Gold =2 g/t (50% recovery)

What is the total ore resource in tonnes, assume an SG of 3.6, and what is it worth at today's metal prices in A$?

Using sub-level open stoping and two main levels with footwall drives and drawpoints show a plan and sections of your mine. A 20m crown pillar will be left below the top main level. Stopes will be 45m long with 15m long pillars (along strike).

All development to production stage must be shown. How much ore will be produced from development?

Note: to calculate the worth of an ore body recovery must be considered. Recovery as quoted in the above figures means mill recovery.

QUESTION :- 2: You are required to report on an operating medium to large underground mining operation.

Included in your report should be all or most of the items listed below:

Production Methods Development Requirements Plans and Sections

Rock Breakage Loading and Hauling Equipment Personnel

Ground Control

Production Costs (if available) Ventilation

Occupational Health and Safety

Power supply and power sources employed Drainage

Environmental Issues

Any other relevant information

Background information may include a brief description of geology, location, history etc., but do not pad this section out. Other sections may include a brief overview of the mineral processing plant, other surface facilities, overland transport etc.

Your report must be typed and finished in a professional manner with all references acknowledged, and bear in mind that a report such as this would not be complete without drawings, sketches, etc.

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M9472111
  • Price:- $70

Priced at Now at $70, Verified Solution

Have any Question?


Related Questions in Other Engineering

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

Select a risk problem from the list below and prepare a

Select a risk problem from the list below and prepare a risk management plan in accordance with AS/NZS ISO 31000:2009. Please ensure that: - Establish the context clearly, in accordance with the Standard; - Define your s ...

Mine safety amp environmental engineeringpart 1 questions1

Mine Safety & Environmental Engineering Part 1. Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the following terms ...

Question - show that the zero-point energy of a simple

Question - Show that the zero-point energy of a simple harmonic oscillator does not contribute to its entropy or heat capacity, but does contribute to its energy and Helmholtz function.

Register design a cpu register is simply a row of

Register design A CPU register is simply a row of flip-flops (i.e. SR, JK, T, etc) put side by side in an array to make the size of register required. For example, an 8 bit register has 8 flip-flops side by side for stor ...

Homework - risk and decision management1 you are working

Homework - Risk and Decision Management 1) You are working program X. The total budget allocated to the program is $100 M and it is to be completed in 24 mo. range (R) and passenger capacity (C) are two key performance p ...

This is your second design assignment this assignment

This is your second design assignment. This assignment requires you to design a complex state machine. You are designing a digital alarm clock. There are various designs you can attempt. More complex designs are worth mo ...

Control theory - lab reportsfor experiments 1 to 4 you must

Control Theory - Lab Reports For experiments 1 to 4 you must undertake the following: a) At the start of each section (including the pre-lab activities) there are a number learning outcomes. That is, what students should ...

Learning outcomes evaluate multiuser communication and

Learning Outcomes Evaluate multiuser communication and resource sharing techniques; Apply the techniques of, and report on, digital communication applications using Matlab and hardware devices. Assignment Description The ...

Assignment 11 what is the purpose of ore reserve and

ASSIGNMENT 1 1. What is the purpose of ore reserve and resource estimation? Why are resource and reserve estimates important to the mining industry? 2. What is meant by ore? What is meant by the term waste? How is the di ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As