Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Computer Engineering Expert

DESIGNING COMPUTER BASED INFORMATION SYSTEMS

Background

The role of Management Information Systems (MIS) in an organization can be considered as providing management with required information in right time to help in their decision processes. Information systems are not restricted to any particular functional areas like production, finance, etc. or managerial level. It covers all segments of the company covering all areas. It is also known that additional role of providing required information to external agencies has to be fulfilled.

Information Systems does not necessarily imply usage of computers. However, in today’s context, where computers have become very common, generally information systems and computers go hand in hand.

All organizations have some form of MIS. The data originating daily is captured in some form, manually or using computers, stored and processed to fulfill necessary requirements. The main issue remains whether or not the existing MIS is able to fulfill the information needs within the required time frame and provide analyzed information to managers to arrive at a better decision.

Designing of an information system is not an easy task. Firstly, specific areas where computer application may help need to be identified. For each specific area, thorough understanding of the specific system is required, followed by information needs of managers. Only then any improvements can be conceptualized. This process is popularly known as “Systems Analysis and Design”.

Systems analysis is the process of evaluating and understanding a particular system and its environment. In a way, it will involve studying the inputs to a system, outputs required and the associated processing to convert inputs to desired outputs.

Understanding the existing system is often much more difficult than expected. It requires gathering a lot of information. This will include, interviews with key personnel, study of forms and reports, norms for evaluation and quite often direct observation of production/service processes. This phase involves dealing with human beings, who quite often resist any type of change and hence co-operation to the System Analyst may be rather low.

In the context of computers, the resistance is much more as there is always a fear in the mind of the concerned persons like fear of losing jobs, more control, etc.

Systems analysis is probably the most difficult part in the development of a computer-based system. A System Analyst is expected to have:

  •     Knowledge of information technology
  •     Understanding of management process
  •     Ability of effective communication with different levels.

The Analyst is expected to make a compromise between available technology and current business needs.

After the information has been collected, it is required to pinpoint the weaknesses of the system, if any. The information collected is quite large and it becomes essential to use systematic tools for documentation and analysis. Some of the commonly used tools are:

  •     System Flow Charts
  •     Decision Tables
  •     Grid Charts
  •     Data Flow Diagrams
  •     Warnier Diagrams.

Computer Engineering, Engineering

  • Category:- Computer Engineering
  • Reference No.:- M9507695

Have any Question?


Related Questions in Computer Engineering

Strings in cstrings manipulationwrite one main code with

Strings in C++ Strings manipulation Write one main code with the following functions. Toggle Write a function called toggle() that accepts a string, and an integer. The function checks whether the character at the positi ...

Do you need computers or information and communication

Do you need computers or information and communication technologies to store, organize, and manage data in organizations? Explain how the present day organizations in a developed country like the USA store and manage the ...

A resistor selected at random from a bin containing 1 k ohm

A resistor selected at random from a bin containing 1 K Ohm 5% tolerance resistors is measured with an ohmmeter. The ohmmeter is old fashioned pointer type that introduces measurement error and operator error (it is hard ...

When we look at the ease to enter the different market

When we look at the ease to enter the different market structure, there is no doubt that 'monopoly' is the hardest. Why? -- There is only ONE firm that has established 'economies of scale' with the production of their go ...

Question in the link below it has all the information that

Question: In the link below it has all the information that needs to be in the crowsfoot erd. Don't take on this assignment if you cant put all the info in the ERD. The instructor will grade the work that you do and send ...

A measurement of etch depth has standard deviation of 2 um

A measurement of etch depth has standard deviation of 2 um. The specifications are 150 to 200 um. If k = 6, what is the P/T ratio of the measurement? Please show the formula/steps taken to receive the answer.

Question suppose you are given two circularly linked lists

Question : Suppose you are given two circularly linked lists, L and M. Create an algorithm for telling if L and M store the same sequence of elements (but perhaps with different starting points). It needs to have a main ...

Question suppose we have two binary search trees b1 and b2

Question : Suppose we have two binary search trees B 1 and B 2 Give an algorithm to merge B 1 and B 2 into a single binary search tree, and runs in time linear in the sum of the sizes of the two trees. Give good justific ...

Assignment 2 windows 8 upgradeby the due date assigned

Assignment 2: Windows 8 Upgrade By the due date assigned, submit your assignment to the Submissions Area. Scenario: You are a consultant for a company that is using Windows 7 as their operating system and are considering ...

You have been recently hired as a senior database

You have been recently hired as a senior database administrator. Your organization has many SQL Server databases that run various applications. Your manager has asked you to present to the junior database administrators ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As