Design Project - Rural Road and Drainage Design

There are two parts to this design project:
1. Road Design using AutoCAD; and
2. Drainage Design using DRAINS

You will produce and submit a minimum of six A3 drawings for Project 2. These will include the drawings from both parts, namely:

1. Title Page - showing development site info, drawing list, etc, and your Name and Student number (from Part 2);

2. Road Centreline Plan - with Longitudinal Section (from Part 1);

3. Cross Sections Drawing - Chainages 0.000, Contour 128, TP3, Ch700.00 (from Part 1);

4. Catchment Plan - showing the sub-catchment boundaries (thick lines) and areas - these areas should be hatched in different directions to clearly show different areas (from Part 2);

5. Drainage Layout Plan - showing all drainage lines and pits (from Part 2); and

6. Long Sections for each of your drainage lines (these can all be on one sheet if it fits). You must show the HGLs as dashed lines on each longsection! (from Part 2).

These drawings must be professionally drawn and set out and include all relevant information (both on the drawings and title blocks).

Part 1 - Road Design

In this part you will learn how to create professional engineering drawings using AutoCAD. This exercise will familiarise you with how drafting plans are created in the design office. You will use AutoCAD to redraw some of the information from Design Project 1 that you drew by hand. If you are unfamiliar with the use of AutoCAD, please first work through the AutoCAD Tutorial 1 in the Project 2 Materials folder before moving on to this task.

Please refer to Design Project 2 - Part 1 - Road Design Outline in the Project 2 Materials folder.

Part 2 - Drainage Design using DRAINS

In this exercise you will learn how to design a stormwater drainage system to drain some of the lots of a new housing sub-development using the DRAINS program. If you are unfamiliar with the use of DRAINS please first work through DRAINS Tutorials 1 - 4 in the Project 2 folder before moving on to this task. MINOR Storms are 20% AEP and MAJOR storms are 1% AEP. All Storm durations up to 2 hours shall be modelled. Maximum overland flow for Minor storms is 10L/s. The development site is in Maroochydore.

You will produce and submit a minimum of four A3 drawings for this part. Please refer to Design Project 2 - Part 2 - Drainage Design Outline in the Project 2 folder for more details.Design Project 2 - Part 1 - Road Design Outline (15%)
In this exercise you will learn how to create professional engineering drawings using AutoCAD. This exercise will familiarise you with how drafting plans are created in the design office. You will use AutoCAD to redraw some of the information from Design Project 1 that you drew by hand.

You do not need your Project 1 drawings to do Project 2. You go through exactly the same steps to find your surface RLs (i.e. interpolate between contour lines). You also don't need your Project 1 Chainages as you need to measure these off the AutoCAD drawings that you will create (i.e. they will be slightly different, but more exact). You need to measure the arc distances between Chainage points (not aligned distances) and add these to the previous chainages as you go along. There are a number of ways to do this. In Project 2, you do not need to include any transition curves or any information about them. You just need to label the chainages of your contour line intersects and your TPs (and the start and end points of your road, and the creek, of course).

You also need to redo your gradelines using AutoCAD (just do it by sight - no earthwork calculations required). Also, just join grade lines using circular curves (using TTR function) as you did for plan (this is not entirely accurate but good enough for this conceptual task - you've already learnt the correct design procedure using first principals...)

If you are unfamiliar with the use of AutoCAD, please first work through the AutoCAD Tutorial 1 in the Project 2 Materials folder before moving on to this task. You will produce and submit two A3 drawings for this part of the project, namely a PLAN (with Longitudinal Section) drawing and a CROSS Sections drawing including the following four cross-sections:

- Ch. 0.000 (with normal crossfall)
- Chainage at road intersection with contour 128 after the creek (with full 7% superelevation)
- Chainage at TP3 (normal crossfall)
- Ch. 700.000 (with normal crossfall)

Design Project - Part 2 - Drainage Design Outline

In this exercise, you will learn how to design a stormwater drainage system to drain some of the lots of a new housing sub-development using the DRAINS program. If you are unfamiliar with the use of DRAINS please first work through DRAINS Tutorials 1 - 4 in the Project 2 folder before moving on to this task. MINOR Storms are 20% AEP and MAJOR storms are 1% AEP. All Storm durations up to 2 hours shall be modelled. Maximum overland flow for Minor storms is 10L/s. The development site is in Maroochydore.

You will produce and submit a minimum of four A3 drawings for this part, namely:

1. Title Page - showing development site info, drawing list, etc, and your Name and Student number;

2. Catchment Plan - showing the sub-catchment boundaries (thick lines) and areas (these areas should be hatched in different directions to clearly show different areas);

3. Drainage Layout Plan (showing all drainage lines and pits); and

4. Long Sections for each of your drainage lines (these can all be on one sheet if it fits). You must show the (1% AEP) HGLs as dashed lines on each longsection!

These drawings must be professionally drawn and set out and include all relevant information (both on the drawings and title blocks).

However, the AutoCAD and DRAINS files must also be forwarded to me (saved as below) when you have completed this exercise.

Attachment:- Road Design and Drainage Design Outline.rar

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M92807629
  • Price:- $125

Guranteed 48 Hours Delivery, In Price:- $125

Have any Question?


Related Questions in Other Engineering

Register design a cpu register is simply a row of

Register design A CPU register is simply a row of flip-flops (i.e. SR, JK, T, etc) put side by side in an array to make the size of register required. For example, an 8 bit register has 8 flip-flops side by side for stor ...

A detailed review of spatial modulation and simulation

A Detailed Review of Spatial Modulation and Simulation Learning Outcomes a. Learn how to model mobile communication channels d. Discern knowledge development and directions on the recent advances in 4G to the research pr ...

Mine safety amp environmental engineering assignment -part

Mine Safety & Environmental Engineering Assignment - Part 1 - Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the fo ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

Learning outcomes evaluate multiuser communication and

Learning Outcomes Evaluate multiuser communication and resource sharing techniques; Apply the techniques of, and report on, digital communication applications using Matlab and hardware devices. Assignment Description The ...

Operations engineering assignment -please select only one

Operations Engineering Assignment - Please select only one of the following case studies for your assignment: CASE A. Tesla Motors Tesla is an innovative manufacturer that designs, assemble and sells fully electric vehic ...

Select a risk problem from the list below and prepare a

Select a risk problem from the list below and prepare a risk management plan in accordance with AS/NZS ISO 31000:2009. Please ensure that: - Establish the context clearly, in accordance with the Standard; - Define your s ...

Engineering materials term paper assignment -conduct a

ENGINEERING MATERIALS TERM PAPER ASSIGNMENT - Conduct a thorough literature search and write a 15-20 page technical review paper on the evolution of the engineering materials used in the manufacturing of any one of the f ...

Task 1using the lab kit design a circuit for the processor

Task 1: Using the lab kit, design a circuit for the processor to control the output of a connected 7-segment LED display device. You will be provided with a standard common anode 7-segment display of the type FND-507 (or ...

Control theory - lab reportsfor experiments 1 to 4 you must

Control Theory - Lab Reports For experiments 1 to 4 you must undertake the following: a) At the start of each section (including the pre-lab activities) there are a number learning outcomes. That is, what students should ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As