Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Other Engineering Expert

1. Demonstrate knowledge and understanding of the key engineering principles that underpin current geotechnical and environmental engineering together with potential future developments

- Apply engineering principles to solve geotechnical and hydraulic engineering problems

- Recognise the important role geotechnical/hydraulic engineering has in the wider global context of sustainable development with consideration of environmental, social and risk issues

- Use creativity to solve geotechnical and environmental engineering problems

- Design and adapt civil engineering solutions that are fit for purpose whilst recognising the importance of sustainability and environmental risk issues

- Adapt to changing technology and techniques

- Prepare and present proficient written technical reports

The main Nottingham-Derby railway line was subjected to severe flooding during the winter of 2012. As such, an embankment is proposed to be built along one side of the line. In order to accommodate the predicted 1 in 200yr flood an embankment of 3.5m is required. The railway line runs at an average elevation of 22.04m AOD, between Nottingham and Derby there is an overall 0.94m total elevation change along its length.

A 2.6m wide pavement is to be constructed along the top of the embankment to promote cyclists and walkers to the area. The pavement will be suitable for light traffic to assist with future maintenance requirements. As such the embankment will be subjected to an imposed load of 650kN along its entire length.

For one 5m length of the railway, there is insufficient room to construct the required embankment and thus a concrete retaining wall has been proposed for this section (Figure 1). The current design suggests the wall will need to be laid to a depth of 1.4m below ground level, be 800mm deep with a 1600mm*400mm toe and maintain the same height of the embankment. It can be assumed that there is no pavement provided along this section.

1698_Solve geotechnical and hydraulic engineering problems.png

Following a desk study an initial ground investigation has estimated the existing soil conditions to be as follows. Due to financial and time constraints only one location was investigated.

2126_Solve geotechnical and hydraulic engineering problems1.png

2. Output Requirements

You work for a geotechnical consultancy and have been tasked to produce a 1000 word (max) report advising a client on the geotechnical issues relating to a proposed flood defence. You will need to advise the client on the geotechnical issues relating to the embankment and retaining wall design. This may include and is not limited to:

Settlement of the embankment

The overturning and sliding forces acting on the retaining wall.

Your report should discuss the feasibility of the proposed embankment and retaining wall, including any recommendations for alteration to the design or for further investigation.

Your report should be a stand alone document with all calculations included in the appendix for reference only. A thorough review of the calculations should not be necessary to understand how the design has been progressed.

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M9308686
  • Price:- $70

Priced at Now at $70, Verified Solution

Have any Question?


Related Questions in Other Engineering

Homework - risk and decision management1 you are working

Homework - Risk and Decision Management 1) You are working program X. The total budget allocated to the program is $100 M and it is to be completed in 24 mo. range (R) and passenger capacity (C) are two key performance p ...

Mine safety amp environmental engineeringpart 1 questions1

Mine Safety & Environmental Engineering Part 1. Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the following terms ...

Assignment 11 what is the purpose of ore reserve and

ASSIGNMENT 1 1. What is the purpose of ore reserve and resource estimation? Why are resource and reserve estimates important to the mining industry? 2. What is meant by ore? What is meant by the term waste? How is the di ...

1 online discussion forum - post your proposed topic and

1. Online Discussion forum - Post your proposed topic and chosen data set as well as a short plan for the project. This is required for approval of the topic. As discussed, students must select unique topics, therefore i ...

Part 1configure verify and troubleshoot wan links and ip

Part 1 Configure, verify and troubleshoot WAN links and IP services Answer to all questions below: 1. What is the name of the Safe Work Australia code of practise that provides guidance on how to manage the risks of elec ...

Assignment 11 what is the purpose of ore reserve and

ASSIGNMENT 1 1. What is the purpose of ore reserve and resource estimation? Why are resource and reserve estimates important to the mining industry? 2. What is meant by ore? What is meant by the term waste? How is the di ...

Operations engineering assignment -please select only one

Operations Engineering Assignment - Please select only one of the following case studies for your assignment: CASE A. Tesla Motors Tesla is an innovative manufacturer that designs, assemble and sells fully electric vehic ...

A detailed review of spatial modulation and simulation

A Detailed Review of Spatial Modulation and Simulation Learning Outcomes a. Learn how to model mobile communication channels d. Discern knowledge development and directions on the recent advances in 4G to the research pr ...

Conceptual design of forced-free-mixed convection

Conceptual Design of Forced-Free-Mixed Convection Experiment This assessment is to be completed individually. 1. Learning Outcomes: - Develop a basic ability to conceptually design an experimental apparatus - Use theory ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As