Ask Computer Engineering Expert

Create a C++ a program for Best Fence and Landscaping Company. The company needs an application that the salespeople can use to estimate the cost of laying sod and the cost of installing a fence for a rectangular lots. These options require to be able to find the area of rectangle on which sod is to be laid , and the perimeter of a rectangular lot.

To implement the application - create a Rectangle class that contains the proper attributes and behaviors of rectangle , and then use it create rectangle objects to facilitate the business tasks. The attributes should be implemented as private data members, with proper access methods. Behaviors should, as minimum, include calculating and returning the area, calculating and returning the perimeter. Include the proper constructor(s) to initialize data members. Include validation to ensure that the data values passed to Rectangle attributes cannot be negative.

Write the driver class for the application which allows a user to enter rectangle dimensions in feet, sod price per square foot, and fence cost per yard. Create two Rectangle class objects allowing a sod covered area to be different from the fence enclosure area. Calculate the cost of sod part of the job, fence part of the job and total cost estimate to be presented to a client.

Display the input data, with proper labels, the costs of sod and fence jobs separately, total cost of the job. Accept a user data as an input, the date of estimate, and generate the proper invoice for a user, including sod covered area in square yards, fence length in yards, pretax and after tax costs of the work.

Bonus : use arrays to generate and present several options to user, which will differ in areas of sod coverage and fence enclose.

Deliverable:

1. Source code files for the project (header, implementation, test program)

2. Well-written word document describing:

2.1. Your overall design

2.2 Your test plan, including test data and results

2.3 Your approach, lessons learned, design strengths specifically
comparing the benefits of this final version with the earlier versions, limitations and suggestions for future improvement and alternative approaches.

3. UML class diagram illustrating the structure of this program.

Documentation format and length:
produce a short document (3 to 5 pages long) explaining design and testing of your program. The document should comply to the professional APA style.

Code format:

---Header comment block,

---Appropriate comments within the code,

---Appropriate variable and function names, and correct indentation.

Computer Engineering, Engineering

  • Category:- Computer Engineering
  • Reference No.:- M91726842

Have any Question?


Related Questions in Computer Engineering

Does bmw have a guided missile corporate culture and

Does BMW have a guided missile corporate culture, and incubator corporate culture, a family corporate culture, or an Eiffel tower corporate culture?

Rebecca borrows 10000 at 18 compounded annually she pays

Rebecca borrows $10,000 at 18% compounded annually. She pays off the loan over a 5-year period with annual payments, starting at year 1. Each successive payment is $700 greater than the previous payment. (a) How much was ...

Jeff decides to start saving some money from this upcoming

Jeff decides to start saving some money from this upcoming month onwards. He decides to save only $500 at first, but each month he will increase the amount invested by $100. He will do it for 60 months (including the fir ...

Suppose you make 30 annual investments in a fund that pays

Suppose you make 30 annual investments in a fund that pays 6% compounded annually. If your first deposit is $7,500 and each successive deposit is 6% greater than the preceding deposit, how much will be in the fund immedi ...

Question -under what circumstances is it ethical if ever to

Question :- Under what circumstances is it ethical, if ever, to use consumer information in marketing research? Explain why you consider it ethical or unethical.

What are the differences between four types of economics

What are the differences between four types of economics evaluations and their differences with other two (budget impact analysis (BIA) and cost of illness (COI) studies)?

What type of economic system does norway have explain some

What type of economic system does Norway have? Explain some of the benefits of this system to the country and some of the drawbacks,

Among the who imf and wto which of these governmental

Among the WHO, IMF, and WTO, which of these governmental institutions do you feel has most profoundly shaped healthcare outcomes in low-income countries and why? Please support your reasons with examples and research/doc ...

A real estate developer will build two different types of

A real estate developer will build two different types of apartments in a residential area: one- bedroom apartments and two-bedroom apartments. In addition, the developer will build either a swimming pool or a tennis cou ...

Question what some of the reasons that evolutionary models

Question : What some of the reasons that evolutionary models are considered by many to be the best approach to software development. The response must be typed, single spaced, must be in times new roman font (size 12) an ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As