Background

The Øresund  Fixed Link is a combined road and train connection that links Denmark with Sweden across the Øresund (the strait that separates the two countries). It is made up of an 8 km bridge, a 4 km artificial island and a 4 km tunnel. Construction of the EUR 4 billion Fixed Link required dredging 7 million m3 of seabed material (limestone and glacial till). Built under very stringent, legally binding environmental requirements, Øresundsbro Konsortiet had to ensure that the Fixed Link had zero impact on the environment - including hydrography (water flow through Øresund).

541_Figure.png

At the same time, there had to be zero impact outside a 500 m zone on each side of the Fixed Link five years after construction ended. To comply with the environmental requirements,  it needs to ensure that construction of the Fixed Link would not block the exchange of water from the North Sea to the Baltic Sea. 

Objectives-

To help to assess this, advanced hydrodynamic models were set up  to assess the hydrographic variability in Øresund. In the lab exercise, a MIKE 21 Flow Model with Felxible Mesh (MIKE 21 Flow Model FM) was established and calibrated to a satisfactory level for the period (1993-12-02 00:00 - 1993 -12-13 00:00, 11 days). Please follow the instructions in the pro-forma to complete the Part 1 report. 

In the second part of the assignment, the calibrated model will be applied to simulate the hydrodynamic conditions in the period of  1997-09-06 00:00  -  1997  -09-15 00:00, 9  days). Complete the pro-forma report to present the model setup information and simulation results.

Data Information-

The study area is Øresund. The mesh generated in lab exercise should be used. The land and water data can be downloaded from learning@griffith.

The measured water level recordings from four stations  (Hornbaek, Viken, Rodvig and Skanor)  located near the open model boundaries are available in the  folders "data1993" and "data1997".  

Wind recordings from Ven  Island will form the wind forcing as time series constant in space. The wind data is saved in the ASCII file "wind_ven.txt".

Assignment link - https://www.dropbox.com/s/pewqshz7oylv26w/Assignment.rar?dl=0.

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M91821169

Have any Question?


Related Questions in Other Engineering

Register design a cpu register is simply a row of

Register design A CPU register is simply a row of flip-flops (i.e. SR, JK, T, etc) put side by side in an array to make the size of register required. For example, an 8 bit register has 8 flip-flops side by side for stor ...

A detailed review of spatial modulation and simulation

A Detailed Review of Spatial Modulation and Simulation Learning Outcomes a. Learn how to model mobile communication channels d. Discern knowledge development and directions on the recent advances in 4G to the research pr ...

Mine safety amp environmental engineering assignment -part

Mine Safety & Environmental Engineering Assignment - Part 1 - Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the fo ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

Learning outcomes evaluate multiuser communication and

Learning Outcomes Evaluate multiuser communication and resource sharing techniques; Apply the techniques of, and report on, digital communication applications using Matlab and hardware devices. Assignment Description The ...

Operations engineering assignment -please select only one

Operations Engineering Assignment - Please select only one of the following case studies for your assignment: CASE A. Tesla Motors Tesla is an innovative manufacturer that designs, assemble and sells fully electric vehic ...

Select a risk problem from the list below and prepare a

Select a risk problem from the list below and prepare a risk management plan in accordance with AS/NZS ISO 31000:2009. Please ensure that: - Establish the context clearly, in accordance with the Standard; - Define your s ...

Engineering materials term paper assignment -conduct a

ENGINEERING MATERIALS TERM PAPER ASSIGNMENT - Conduct a thorough literature search and write a 15-20 page technical review paper on the evolution of the engineering materials used in the manufacturing of any one of the f ...

Task 1using the lab kit design a circuit for the processor

Task 1: Using the lab kit, design a circuit for the processor to control the output of a connected 7-segment LED display device. You will be provided with a standard common anode 7-segment display of the type FND-507 (or ...

Control theory - lab reportsfor experiments 1 to 4 you must

Control Theory - Lab Reports For experiments 1 to 4 you must undertake the following: a) At the start of each section (including the pre-lab activities) there are a number learning outcomes. That is, what students should ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As