Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Computer Engineering Expert

Case Study 2: Design Process

You have recently started your own software design company. You discover that your local DMV is looking to build a system that will allow receptionists to check customers in quickly. They would like for the system to allow customers to self-check-in during busy times, but have receptionists check customers in the rest of the time. Your company puts a bid in for the project and wins.

Read the article located at http://www.bcs.org/upload/pdf/ewic_hc07_lppaper18.pdf.

Write a four to five (4-5) page paper in which you:

Suggest the prototyping technique you would use for this system and support your rationale.

Create a management plan containing eight to ten (8-10) stages for proper design of such a system.

Explain each stage of the management plan and justify your rationale.

Estimate the length of time it will take to complete each stage of the management plan.

Compare and contrast the self-check-in interface with the interface a receptionist would use.

Use Microsoft Visio or an open source alternative, Dia, to create a total of two (2) graphical representations of your proposed interfaces, one (1) for the self-check-in and one (1) for the receptionist. Note: The graphically depicted solution is not included in the required page length.

Use at least three (3) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.

Your assignment must follow these formatting requirements:

Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.

Include a cover page containing the title of the assignment, the student's name, the professor's name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.

Include charts or diagrams created in Excel, Visio, MS Project, or one of their equivalents such as Open Project, Dia, and OpenOffice. The completed diagrams/charts must be imported into the Word document before the paper is submitted.

Computer Engineering, Engineering

  • Category:- Computer Engineering
  • Reference No.:- M91577014

Have any Question?


Related Questions in Computer Engineering

In 2005 team dad used a toyota truck with a system of

In 2005, Team DAD used a Toyota truck with a system of spinning lasers as its "visual" system. What advantages and or disadvantage does such a system have compared to camera-based systems?

What type of economic system does norway have explain some

What type of economic system does Norway have? Explain some of the benefits of this system to the country and some of the drawbacks,

Discussion a network-based intrusionimagine you live by

Discussion : A Network-Based Intrusion Imagine you live by yourself on a quiet street. Each day, you leave your house in the morning and drive to work. One day while you are at work, someone breaks into your house by kic ...

Question your paper should contain the following

Question: Your paper should contain the following information: • Describe the 3-level architecture. • Describe data independence. • Talk about the differences between a DA and a DBA. • Discuss the pros and cons of having ...

Identify at least two 2 factors that have led to the

Identify at least two (2) factors that have led to the explosive growth of digital crime over the past a few decades. Next, describe the most common forms of digital crime, and give your opinion as to why those forms you ...

Red bull is the most popular energy drink in sales in the

Red Bull is the most popular energy drink in sales in the United States. Red Bull GmbH (the parent company) has observed that daily sales are normally distributed with an average of 6,329,903 drinks sold with a standard ...

Question suppose a computer using direct mapped cache has

Question Suppose a computer using direct mapped cache has 2 40 bytes of byte-addressable main memory and a cache of 64 blocks, where each block contains 32 bytes. a. how many blocks pf main memory are there? b. what is t ...

Question suppose you have a set of n project managers and

Question : Suppose you have a set of N project managers and 2N software engineers. Each project manager is only willing to work with certain software engineers. The software engineers have no preferences. Design an algor ...

Assignment 2 windows 8 upgradeby the due date assigned

Assignment 2: Windows 8 Upgrade By the due date assigned, submit your assignment to the Submissions Area. Scenario: You are a consultant for a company that is using Windows 7 as their operating system and are considering ...

We might consider a regression of the number of group

We might consider a regression of the number of group members and the efficiency of project completion. Which of those would be the dependent and which would be the independent variables?

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As