Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Other Engineering Expert

ASSIGNMENT

You have been retained as a Software Engineering consultant to the Muddy Springs Bottled Water Company. The company runs a water bottling plant which is currently undergoing dramatic improvements in equipment and capacity. As part of these improvements an Automated Monitoring and Control System (AMAC) is being developed as specified below. Your job is to oversee development of the real-time software required for the AMAC.

AMAC will allow a single plant operator to oversee and control all aspects of the plant's operations from a central control room. To achieve this AMAC requires new leading-edge telemetry and control facilities.

Below is schematic diagram of the plant.

The bottling plant consists of two integrated systems: the water supply system and the bottle washing, storing and filling system. The water supply system pumps the spring water from the holding reservoir to a special header tank which supplies water to both the bottle washing and filling plants. The header tank must operate within a narrow band to supply the correct pressure to the filling plant. New bottles arrive at the washing plant and are cleaned and rinsed to ensure strict quality controls are met. After cleaning the bottles are transported via conveyor belt (C1 on the schematic) to the bottle storage facility. The bottles are then supplied to the filling plant by the conveyor C2 as required.

The AMAC system will be the hub of the overall system with all data, control and display functions directed through AMAC to the appropriate external devices. The operator's console consists of a mimic board and control panel which exist within the operators room. You can consider the mimic board and control panel as external entities for your analysis. All information displayed on the mimic board and all operators control panel inputs are channelled through AMAC.

A more comprehensive description of the system is presented in section 3. This includes all the data measured and stored in the system along with all control functions required.

Submission Task

Your task is to do a Real-Time Structured Analysis for the AMAC. You are to present your analysis including the following information:

1. An External Entity-Relationship Diagram (ERD) indicating relationships of the AMAC and the other external entities in the system. Note you do not need to include attributes of the entities on the ERD. Just the relationships and their cardinality and modality.

2. Data and Control Flow Diagrams (DFD/CFDs) - to sufficient detail that only a single task is carried out by each process at the lowest level. You should show the control events that occur on the same diagrams. Use the real-time extensions for control flows etc shown in the lecture notes on slide 17 from week

3. You need to determine when and where events will occur. For example, whenever a piece of data becomes available it may need a control event to let the system know that it is available. These events must be clearly shown in these DFD/CFD diagrams and then handled in the CSPEC. 3. Process specifications (Pspecs) - a psuedo-code or similar design language specification is required for each process at the lowest level. Note a narrative description alone will not be considered sufficient.

4. Control Specifications (Cspec) - use combinational or sequential FSMs as required, presented in an appropriate format. The idea is that the Cspec will completely describe how each and every event or control flow is handled in the system. Note you need to provide both "Process Activation Table" and "State Machine Diagram".

5. A Data Dictionary is required to adequately describe each name or special term used in the analysis, note this includes process names, data flow names, control flow names etc. You should include sufficient detail to allow the system to handle all the monitoring and control aspects specified in section 3 (and any further aspects you consider essential). If you think further information is required make reasonable assumptions and clearly state these in the submission.

Detailed Description

Pumping Station

The pumping station (PS) contains two pumps. The pumps are controlled by the header tank water level via the AMAC system ie the pumps are normally automatically turned on and off by the AMAC system (a manual override should be built into AMAC to allow the pumps to be run at operator request at any time). As the water level in the header tank drops, AMAC will start one of the pumps when the level drops below a specified level. If the water level continues to drop the second pump will be started at the next cutin level. As the water level rises both pumps will be turned off when the level reaches Full Supply Level (FSL). The levels initially specified in the system will be: FSL 3.0 m First Cutin Level 2.2 m Second Cutin Level 1.5 m To ensure that both pumps are used equally, the AMAC system should alternatively start pump A at the first cutin level and then pump B.  The system will record and store the times of all pump start and pump stop operations, and additionally the flow rate through the pump station at 30 second intervals. If either pump does not start when instructed to by the system an alarm should be raised on the operator's console.

Header Tank

The AMAC system will receive tank depth readings via telemetry every 30 seconds, these values should be stored in the database. An alarm should be initiated if the water level rises above the tank overflow level of 3.1 m, or the level drops below the top of the outlet pipe at 0.25 m. Either of these is considered an emergency situation and the whole plant should be brought to a standstill and the operator notified.

If the tank needs to be emptied for cleaning or maintenance then all other plant should be stopped and the water directed to the drain by closing valves A, C and E and opening valves B, D and F. This should be done at scheduled tank maintenance periods at least once every 7 days, or at the operators command. The refilling procedure should only occur when the command is received from the operator's panel.

Bottle Washing Plant

Bottle washing is done under batch-like conditions, that is a quantity of dirty bottles are delivered to the plant and these are washed in one operation. The demands on the water supply are intermittent but significant when washing is actually occurring. When a batch of dirty bottles is ready the operator starts the washing operation from the control panel. AMAC must ensure that valves B, C, E and F are open and valve D is closed. When completed valve C is closed to await the next batch of dirty bottles.

The dirty bottles are transferred to conveyor C1 for transport to the bottle store. If the bottle store is full then the conveyor is stopped until sufficient room is available for the batch of newly clean bottles.

Bottle Filling Plant

Conveyor C2 delivers clean empty bottles to the filling plant from the bottle store. AMAC has overall control of the filling plant, starting and stopping the plant as required. The filling plant is fully automatic internally so AMAC does not need to control the actual filling process. AMAC does have control of conveyor C2 and valve A. The conveyor must be running and valve A must be open when filling bottles.

The filling plant will be stopped for the following reasons:

• the header tank water level is too low or high,

• the bottle store is empty,

• for routine maintenance periods every 48 hours. This maintenance usually takes 20 to 30 minutes.

• operator command

The filling plant currently has a maximum filling and capping rate of 50 bottles per minute.

The start and stop times, the reason for actions and the bottle filling rate (one value per minute) are stored in the database.

Data Storage

The AMAC must be able to receive and store all the data information received as detailed from each of the units above. In addition your DFD/CFDs, PSPEC and CSPEC should indicate how the system reacts to the control events and data from each of these external entities. 

Submission Requirements

The assignment must be submitted electronically through Moodle in Word document, rtf or pdf format.

1205_Untitled.png

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M91557752
  • Price:- $40

Priced at Now at $40, Verified Solution

Have any Question?


Related Questions in Other Engineering

Operations engineering assignment -please select only one

Operations Engineering Assignment - Please select only one of the following case studies for your assignment: CASE A. Tesla Motors Tesla is an innovative manufacturer that designs, assemble and sells fully electric vehic ...

Engineering materials term paper assignment -conduct a

ENGINEERING MATERIALS TERM PAPER ASSIGNMENT - Conduct a thorough literature search and write a 15-20 page technical review paper on the evolution of the engineering materials used in the manufacturing of any one of the f ...

Engineering analysis assignment -for every problem provide

Engineering Analysis Assignment - For every problem, provide The MATLAB script/function files that solve the problems. Problem 1: Plot the function f(t) = (x+5) 2 /(4+3x 2 ) for -3 ≤ x ≤ 5. using plot command. Use the ar ...

Register design a cpu register is simply a row of

Register design A CPU register is simply a row of flip-flops (i.e. SR, JK, T, etc) put side by side in an array to make the size of register required. For example, an 8 bit register has 8 flip-flops side by side for stor ...

Task 1using the lab kit design a circuit for the processor

Task 1: Using the lab kit, design a circuit for the processor to control the output of a connected 7-segment LED display device. You will be provided with a standard common anode 7-segment display of the type FND-507 (or ...

Question - show that the zero-point energy of a simple

Question - Show that the zero-point energy of a simple harmonic oscillator does not contribute to its entropy or heat capacity, but does contribute to its energy and Helmholtz function.

1 online discussion forum - post your proposed topic and

1. Online Discussion forum - Post your proposed topic and chosen data set as well as a short plan for the project. This is required for approval of the topic. As discussed, students must select unique topics, therefore i ...

Mine safety amp environmental engineeringpart 1 questions1

Mine Safety & Environmental Engineering Part 1. Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the following terms ...

Question 1 define rock mechanics discuss the main

Question 1 . Define rock mechanics. Discuss the main objectives of the application of rock mechanics in mining. Question 2. Define stress. Draw a diagram and define the normal and shear stress by resolving the resultant ...

Learning outcomes evaluate multiuser communication and

Learning Outcomes Evaluate multiuser communication and resource sharing techniques; Apply the techniques of, and report on, digital communication applications using Matlab and hardware devices. Assignment Description The ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As