For a business or non-profit organization of your choice, use a graphics program to develop a data-flow diagram (DFD) of one of its main processes and an entity-relationship diagram showing the data within the scope of the system.

Download the free open-source program, Dia Diagram to create your DFD. You may also create a E-R diagram using ERDPlus to help you envision your DFD.

Dia Diagram saves natively in the proprietary. dia format. When you are finished with your DFD, save and submit your. dia file.

Part 2:

A project team has estimated the costs associated with the development and maintenance of a new system. One approach requires a more complete design and will result in a slightly higher design and implementation cost but a lower maintenance cost over the life of the system. The second approach cuts the design effort, saving some dollars but with a likely increase in maintenance cost. Enter the following data into the spreadsheet. Print the result.

Create a stacked bar chart that shows the total cost, including the design, implementation, and maintenance costs over an expected system life of seven years. Be sure that the chart has a title and that the costs are labeled on the chart.

Insert a text box and write a paragraph that recommends an approach to take and why.

Paste your chart into an MS Word file (.docx or. odt format) next to your recommendation paragraph.

Computer Engineering, Engineering

  • Category:- Computer Engineering
  • Reference No.:- M92701204

Have any Question?


Related Questions in Computer Engineering

Decision support systems dss what sorts of dss tools do you

Decision support systems (DSS). What sorts of DSS tools do you use at your work - e.g., what-if analysis, sensitivity analysis, scenario analysis, goal-seeking analysis, optimization analysis, etc.? Even if you don't use ...

Command to mail only the process id of running java program

Command to mail only the process ID of running Java program test to the email address (single line Unix)

What are the minimum numbers of keys and pointers in btree

What are the minimum numbers of keys and pointers in Btree (i) interior nodes and (ii) leaves, when: a) n = 10; i.e., a block holds 10 keys and 11 pointeis. b) n = 11; i.e., a block holds 11 keys and 12 pointers.

In 2005 team dad used a toyota truck with a system of

In 2005, Team DAD used a Toyota truck with a system of spinning lasers as its "visual" system. What advantages and or disadvantage does such a system have compared to camera-based systems?

Reading the biographybook where the body meets memory by

Reading the Biography Book : "Where the Body Meets Memory" by David Mura Questions: On page 62 to 66, David Mura talked about an incident when he was in fifth grade. A bully called Mike Wrangel was trying to beat up anot ...

What is a good analogy of subnetting whats a break down of

What is a good analogy of Subnetting? What's a break down of how it is used within a company?

Riditna paper withdraws river water for use in its paper

Riditna Paper withdraws river water for use in its paper mill, and returns it, along with waste effluent, back into the river. (Effluent is a co-product of Riditna's paper, such that production of each ream of paper gene ...

Question suppose we have a disk with capacity 98304 gb if

Question : Suppose we have a disk with capacity 98.304 GB, if number of platters 16, an average of 300 sectors per track and 20,000 tracks per surface. Then calculate the number of bytes per sector.

We talked a few times about slow migration from ipv4 to

We talked a few times about slow migration from IPv4 to IPv6 in the U.S. What was the primary motivating factor to migrate to IPv6? What are two other advantages of IPv6 over IPv4? Why is China farther along in implement ...

Suppose there are three decks of cards on the table a

Suppose there are three decks of cards on the table, a number is written on each card. And each deck is sorted in decreasing order (The maximum value is on the deck in top). The goal is to find the minimum value between ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As