Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Other Engineering Expert

Assignment

1. (a) Models can be classified into three categories, depending upon how they are developed.
(i) Name these three categories of model.
(ii) Give an advantage and disadvantage of each category.

(b) Explain what is meant by:

(i) a steady- state model
(ii) a dynamic model.

(c) State which type of model is most commonly produced and explain why.

2. A steady state distillation process is shown diagrammatically as FIGURE 1.

1192_State-Distillation-Process.jpg

Assuming no heat losses to the atmosphere:

(i) Write four balanced equations for this system.

(ii) Identify where any constitutive equations may be required for the modelling processes.

3. (a) FIGURE 2 shows two cylindrical tanks interconnected with a pipe which has a valve that creates a constant resistance to flow of Rf when fully open. The height of liquid (of density ρ) in the first tank is hin and the second tank hout. The cross-sectional area of the first tank is Ain m2 and the second tank Aout m2.

1703_Cylindrical-Tanks .jpg

The flow rate of liquid through the valve is given by

Q = (1/Rf) (pin - pout)

where Q = flow rate in m3 s-1

pin- pressure due to height of liquid in first tank (Pa)
pout- pressure due to height of liquid in second tank (Pa)

Produce a mathematical model of the process to determine the change in height of fluid in the second tank when the valve is open.

(b) Determine the time constant for the system.

4. A process can be represented by the first order equation

4{dy(t)/dt} + y(t) = 3u(t)

Assume the initial state is steady (y = 0 at t = -0).

(a) Determine the transfer function of this process in the s domain.

(b) If the input is a ramp change in u(t) = 4t, determine the value of y(t) when t = 10 s.

5. Using a simulator of your own choice, or the one used during the lessons at the website;

Note the initial values used by the simulator and the output produced.

For BOTH ON-OFF and PID control,

(a) sketch (or print copies) of the effect of changing the following parameters from their existing value (resetting them to the original after every change has been recorded):

(i) Increasing the proportional control by a factor of 10.

(ii) Decreasing proportional control by a factor of 10.

(iii) Increasing the integral control by a factor of 10.

(iv) Decreasing integral control by a factor of 10.

(v) Increasing the derivative control by a factor of 10.

(vi) Decreasing derivative control by a factor of 10.

(vii) Increasing the hysteresis by a factor of 10.

(viii) Decreasing hysteresis by a factor of 10.

(ix) Increasing the system lag by a factor of 10.

(x) Decreasing system lag by a factor of 10.

(b) Explain your results.

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M92512296

Have any Question?


Related Questions in Other Engineering

A detailed review of spatial modulation and simulation

A Detailed Review of Spatial Modulation and Simulation Learning Outcomes a. Learn how to model mobile communication channels d. Discern knowledge development and directions on the recent advances in 4G to the research pr ...

Q 1a discontinuity is found fully developed from the toe to

Q. 1 A discontinuity is found fully developed from the toe to the bench surface on a 15 m high slope, slope angle 65°. The discontinuity (frictional angle 32° and cohesion 20 kN/m2) is planar and its strike is parallel t ...

Part 1configure verify and troubleshoot wan links and ip

Part 1 Configure, verify and troubleshoot WAN links and IP services Answer to all questions below: 1. What is the name of the Safe Work Australia code of practise that provides guidance on how to manage the risks of elec ...

Assignment 11 what is the purpose of ore reserve and

ASSIGNMENT 1 1. What is the purpose of ore reserve and resource estimation? Why are resource and reserve estimates important to the mining industry? 2. What is meant by ore? What is meant by the term waste? How is the di ...

Homework - risk and decision management1 you are working

Homework - Risk and Decision Management 1) You are working program X. The total budget allocated to the program is $100 M and it is to be completed in 24 mo. range (R) and passenger capacity (C) are two key performance p ...

Mine safety amp environmental engineeringpart 1 questions1

Mine Safety & Environmental Engineering Part 1. Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the following terms ...

Select a risk problem from the list below and prepare a

Select a risk problem from the list below and prepare a risk management plan in accordance with AS/NZS ISO 31000:2009. Please ensure that: - Establish the context clearly, in accordance with the Standard; - Define your s ...

Mine safety amp environmental engineering assignment -part

Mine Safety & Environmental Engineering Assignment - Part 1 - Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the fo ...

Question 1 define rock mechanics discuss the main

Question 1 . Define rock mechanics. Discuss the main objectives of the application of rock mechanics in mining. Question 2. Define stress. Draw a diagram and define the normal and shear stress by resolving the resultant ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As