Assignment: Microprocessors and PLCs

Weight based potato packing system

Scenario

You have been contracted to develop a control system for a packing system which will load potatoes into plastic punnets based on weight. Potatoes are to be loaded into punnets until the weight of the punnet is 1kg +/- 100g. Each potato will weigh between 80g and 110 g.

The potatoes will be delivered one at a time on a conveyor belt with a minimum separation of 10cm between each potato. When operational the conveyor will move at a speed of 5cm/s. When the potatoes reach the end of the conveyor they will fall into a hopper which is equipped with a load cell. The load cell will produce a voltage which is directly proportional to the weight contained in the hopper. The output voltage will be 10mV per 5g.

The hopper will be controlled by two servos. If servo ‘A' is activated the potato in the hopper is emptied into the punnet. If servo ‘B' is activated the potato is returned to the beginning of the system.

The punnets are carried on a second conveyor belt system at a spacing of 20cm. This belt moves at a speed of 4cm/s. The punnet currently being loaded is weighed by a further load cell with the same operational parameters as that for the hopper.

Project Objectives

1. To design a signal conditioning system to interface the two load cells to a PIC18F2455 microcontroller

2. To develop a microprocessor based system to weigh the current potato in the hopper, the punnet and to decide whether to load or reject the current potato.

3. To design and develop a Micro820 PLC programme to control the two conveyors.

System Elements

Weight Control System

The two weight sensors will be interfaced to a PIC18F2455 microcontroller. The microcontroller will perform the following functions.

1. Measure the weight of both the punnet and the current potato in the hopper.
2. Add the weight from the hopper and the punnet and determine whether to add or reject the current potato.
3. Provide digital signals to the conveyor signals as per table 1 below.

Signal

Value

Meaning

Accept

0

No action

 

1

Hopper is emptied into the Punnet

Return

0

No action

 

1

Hopper is emptied into return silo

Full

0

No action

 

1

Punnet is full - move next punnet into position


Table 1 - Weight control system outputs

Conveyor Control System

The control system for the conveyor will be implemented by a Micro 820 PLC and will move the potatoes through the system.

The PLC system should perform the following actions on the receipt of the signals from the Microprocessor:

• When an ‘accept' signal is received, the PLC should activate the ‘accept' servo for 5 seconds, then move the feed conveyor to bring the next potato into the hopper.

• When a ‘reject' signal is received, the PLC should activate the ‘reject' servo for 5 seconds then move the feed conveyor to bring the next potato to the hopper.

• When the ‘full' signal is received the PLC should move the next punnet into position.

Deliverables

Weight Sensor Signal Conditioning

You should provide a detailed description including circuit diagrams and relevant design calculations explaining how the two weight sensors will be interfaced with the PIC18F2455 microcontroller. You should explain the rationale for the design and how it is makes optimal use of the available feature of the microcontroller.

Weight Control System Design Notes

You will carry out design work on the code and produce a set of design notes which may include:

• a flow chart of the operation of the program,
• a list of the I/O pin allocations
• A list of the subroutines you will use.
• Pseudocode outline for your program

Microcontroller Code

You should provide PIC18F2455 code to implement the required functionality. All code should be appropriately commented and presented in a professional fashion using appropriate formatting and indentation. You may write the program in Assembly Language OR C code suitable for the XC8 compiler.

PLC Design Notes

You will produce a set of design notes for the PLC program based on the required functionality described above. This may include:

• Flowchart or Sequential Function Chart
• I/O list
• Variable list
• Comments on the purpose of each rung

PLC Program

You should provide a Micro820 Ladder Logic program to implement the required functionality for the conveyor control system as described above.

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M92422199

Have any Question?


Related Questions in Other Engineering

Learning outcomes evaluate multiuser communication and

Learning Outcomes Evaluate multiuser communication and resource sharing techniques; Apply the techniques of, and report on, digital communication applications using Matlab and hardware devices. Assignment Description The ...

Q 1a discontinuity is found fully developed from the toe to

Q. 1 A discontinuity is found fully developed from the toe to the bench surface on a 15 m high slope, slope angle 65°. The discontinuity (frictional angle 32° and cohesion 20 kN/m2) is planar and its strike is parallel t ...

Task 1using the lab kit design a circuit for the processor

Task 1: Using the lab kit, design a circuit for the processor to control the output of a connected 7-segment LED display device. You will be provided with a standard common anode 7-segment display of the type FND-507 (or ...

Control theory - lab reportsfor experiments 1 to 4 you must

Control Theory - Lab Reports For experiments 1 to 4 you must undertake the following: a) At the start of each section (including the pre-lab activities) there are a number learning outcomes. That is, what students should ...

Assignment 11 what is the purpose of ore reserve and

ASSIGNMENT 1 1. What is the purpose of ore reserve and resource estimation? Why are resource and reserve estimates important to the mining industry? 2. What is meant by ore? What is meant by the term waste? How is the di ...

Projection of planes1 a regular pentagon of 25 mm side has

Projection of Planes 1. A regular pentagon of 25 mm side has one side on the ground. Its plane is inclined at 45° to H.P. and perpendicular to the V.P. Draw its projections. 2. Draw the projection of a circle of 50 mm di ...

Engineering materials term paper assignment -conduct a

ENGINEERING MATERIALS TERM PAPER ASSIGNMENT - Conduct a thorough literature search and write a 15-20 page technical review paper on the evolution of the engineering materials used in the manufacturing of any one of the f ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

Engineering analysis assignment -for every problem provide

Engineering Analysis Assignment - For every problem, provide The MATLAB script/function files that solve the problems. Problem 1: Plot the function f(t) = (x+5) 2 /(4+3x 2 ) for -3 ≤ x ≤ 5. using plot command. Use the ar ...

Mine safety amp environmental engineeringpart 1 questions1

Mine Safety & Environmental Engineering Part 1. Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the following terms ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As