Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Engineering Mathematics Expert

Assignment: Linear Programming Applications

SAPIC

Question 1:

SABIC , Inc. is a firm that produces chemical based products. In a particular process 3 Material are used to produce 2 products. The Material requirements per ton are:

Product

Material 1

Material 2

Material 3

Fuel additive

0.4

0

0.6

Solvent base

0.5

0.2

0.3

For the current production period SABIC has available the following quantities of each material. Because of spoilage, any materials not used for current production must be discarded.

Material Available for Production

# Tons

Material 1

20

Material 2

5

Material 3

21

If the contribution to the profit is 40 SAR for each ton of fuel additive and 30 SAR for each ton of solvent base,

1) Use given data to formulate a linear programming model.
2) Set up the template for this problem on Excel and show how you would solve this problem on Excel Solver.
3) What is the maximum profit?
4) How many tons of each product should be produced?
5) How many resources were used?

You are required to turn in an Excel file with the solution which include Excel sheet, Answer report and Sensitivity report and answer of previous questions.

Engineering Mathematics, Engineering

  • Category:- Engineering Mathematics
  • Reference No.:- M92048930

Have any Question?


Related Questions in Engineering Mathematics

Assignment - lp problemsthe data for all the problems in

Assignment - LP problems The data for all the problems in this HW are included in the LP_problems_xlsx spreadsheet Problem 1: Cash Planning A startup investment project needs money to cover its cash flow needs. At the en ...

Question a signal starts at point x as it travels to point

Question : A signal starts at point X. As it travels to point Y, it loses 8 dB. At point Y, the signal is boosted by 10 bB. As the signal travels to point Z, it loses 7 dB. The dB strength of the signal at point Z is -5 ...

1 this problem concerns of the proof of the np-completeness

(1) This problem concerns of the proof of the NP-completeness of 300L a) Convert the formula F into a 300L graph b) Find a solution for the 300L instance of F and verify that it is a solution for F F = (Z 1 V Z 2 ) ^ (z ...

Question 1 - many spas many componentsconsider 4 types of

Question 1 - Many spas, many components Consider 4 types of spa tub: Aqua-Spa (or FirstSpa, or P1), Hydro-Lux (or SecondSpa, or P2), ThirdSpa (or P3) and FourthSpa (or P4), with the production of products P1, ..., P4 in ...

I have these questions for a homework assignment and have

I have these questions for a homework assignment and have to show work. This works with MIPS coding language and is the class Introduction to Computer Architecture. 1. Find the 2's complement representation (in 32-bit he ...

Clculus assignment -q1 find the total differential of w

CALCULUS ASSIGNMENT - Q1. Find the total differential of w = x 3 yz + xy + z + 3 at (x, y, z) = (1, 2, 3). Q2. Find the value of the double integral ∫∫ R (6x + 2y 2 )dA where R = {(x, y)| - 2 ≤ y ≤ 1, y 2 ≤ x ≤ 2 - y. Q3 ...

Assignment - lp problemsthe data for all the problems in

Assignment - LP problems The data for all the problems in this HW are included in the LP_problems_xlsx spreadsheet. Problem 1 - Cash Planning A startup investment project needs money to cover its cash flow needs. At the ...

Problem -consider a closed convex set x sub rd a function h

Problem - Consider a closed convex set X ⊂ R d , a function H : X x Ξ ι→ R d , and a deterministic nonnegative sequence {α n } such that n=0 ∑ ∞ α n = ∞ and n=0 ∑ ∞ (α n ) 2 = ∞. Consider an inner product (·, ·) on R d , ...

All these questions should be answered in matlab 1 generate

All these questions should be answered in MATLAB !!! 1. Generate a set of 3 random patterns of dimension 12 where each value is +1 or -1.(3 random 12*12 matrix) 2. Create a 12-unit Hopfield network (a 12x12 matrix) from ...

Show all your work not just the answerswhen you multiply 21

(SHOW ALL YOUR WORK, not just the answers) When you multiply: 21 x 68 you most likely do: 8x1 + 8x20 + 60x1 + 60x20 = 1, 428 So, there are 4 multiplications and then 3 additions. How long would it take a computer to do t ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As