Q1. Life Cycle Inventory for electricity generation using diesel (for full life cycle)

a. Electricity consumption by utilities (MWh)

b. Electricity consumption by all households (MWh)

c. Total electricity consumption (1a+1b)(MWh)

d. Electricity to be purchased from mining grid (MWh)

e. Electricity to be produced by power plant generators (MWh)

f. Diesel consumption by generators (litre)

g. Transportation of diesel from refinery to shire (tkm)

Q2. Life Cycle Inventory for electricity generation using biodiesel (for full life cycle)

a. Total electricity to be produced by power plant generators (1e) (MWh)

b. Biodiesel required to generate above electricity (litres)

c. Canola oil required for producing above biodiesel (litres)

d. Canola required for producing above canola oil (tonnes)

e. Equivalent land area required to produce above canola including losses (ha)

f. Canola seeds required for farming (tonnes)

g. Fertilizer required for farming (tonnes)

h. Herbicides required for farming (tonnes)

i. Lime required for farming (tonnes)

j. Diesel required during farming stage (litres)

k. Grid electricity required for pumping of ground water (MWh)

I. Transportation during farming (e.g. seeds, fertilizer, herbicides, lime and diesel) (tkm)

m. Grid electricity required during conversion of canola to oil (MWh)

n. Methanol required for trans-esterification process (litres)

o. Potassium Hydroxide required as catalyst (kg)

p. Electricity required for trims-esterification process (MWh)

q. Diesel required during processing stage (litres)

r. Total electricity required during conversion of canola to mobs oil to biodiesel (MWh)

s. Transportation during processing stage (e.g. diesel, methanol and potassium hydroxide) (tkm)

Q3. Life cycle environment impacts (when electricity generation is using diesel)

Q4. Life cycle environment impacts (when electricity generation is using biodiesel)

Q5. Life cycle costing (when electricity generation is using diesel)

 a. Present Value (PV) of Shires life cycle income from the sale of electricity to public utilities and households ($)

b. Present Value (PV) of Shires life cycle expenses for both purchasing and the production of electricity ($) as below:

  • PV of cost of electricity generation
  • PV of payment to mining company for grid electricity
  • PV of salaries to staff
  • PV of maintenance cost

c. Net present .attic (income - expenses) ($)

Q6. Life cycle costing (when electricity generation is using biodiesel)

a. Present Value (PV) of Shires life cycle income from sale of electricity to public utilities and households ($)

b. Present Value (PV) of Shires life cycle income from sale of canola residue to live stock farm ($)

c. Capital cost of processing facility and farm machinery ($)

d. Present Value (PV) of Shires life cycle expenses for purchasing and production of electricity ($) as below:

  • PV of cost of electricity generation
  • PV of payment to mining company for grid electricity
  • PV of salaries to staff
  • PV of maintenance cost

e. Net present value (income - expenses) ($)

Part B-

Q7. Compare the total life cycle environmental impacts of both scenarios and identify the most environmentally friendly option (least environmental impacts).   

Q8. Compare the total life cycle costing of both scenarios and identify the most economically viable option (option having highest net present value).

Q9. Identify a minimum of four life cycle social impacts associated with the production of electricity using diesel and biodiesel, and then compare the social advantages or disadvantages of these two options.

Q10. Identify two hotpots and suggest cleaner production strategies (CPS) for the electricity generation option which has the lowest environmental impacts

a. Identify hotspots during different stages and suggest one CPS for each of the hotspots which could potentially be introduced to mitigate the impacts without altering the performance/production output. The generation and consumption of grid electricity from mining company (for public utility and households) is beyond your scope and hence this grid electricity is not a valid hotspot and replacing it by renewable source is not a valid CPS.

b. Explain as to wily you have chosen these strategies. Your arguments must be supported through facts and figures (max 200 words using valid references).

Assignment link -

https://www.dropbox.com/s/1xpu20xyytv2y1i/Life%20Cycle%20of%20Bioenergy%20Assignment.rar?dl=0

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M91959096
  • Price:- $110

Guranteed 48 Hours Delivery, In Price:- $110

Have any Question?


Related Questions in Other Engineering

Engineering analysis homework -for every problem provide

Engineering Analysis Homework - For every problem, provide The MATLAB script/function files that solve the problems. Problem 1: Write a script that solves the problem. For (c), show results of the evaluation of every ind ...

Q 1a discontinuity is found fully developed from the toe to

Q. 1 A discontinuity is found fully developed from the toe to the bench surface on a 15 m high slope, slope angle 65°. The discontinuity (frictional angle 32° and cohesion 20 kN/m2) is planar and its strike is parallel t ...

Projection of planes1 a regular pentagon of 25 mm side has

Projection of Planes 1. A regular pentagon of 25 mm side has one side on the ground. Its plane is inclined at 45° to H.P. and perpendicular to the V.P. Draw its projections. 2. Draw the projection of a circle of 50 mm di ...

Question 1 define rock mechanics discuss the main

Question 1 . Define rock mechanics. Discuss the main objectives of the application of rock mechanics in mining. Question 2. Define stress. Draw a diagram and define the normal and shear stress by resolving the resultant ...

Task 1using the lab kit design a circuit for the processor

Task 1: Using the lab kit, design a circuit for the processor to control the output of a connected 7-segment LED display device. You will be provided with a standard common anode 7-segment display of the type FND-507 (or ...

Introduction to engineering design assignment -

Introduction to Engineering Design Assignment - Drafting Question 1 - Field notes and traverse drawing may be an outdated form of keeping and presenting information on the position of features on a site. Modern electroni ...

Mine safety amp environmental engineeringpart 1 questions1

Mine Safety & Environmental Engineering Part 1. Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the following terms ...

Mine safety amp environmental engineering assignment -part

Mine Safety & Environmental Engineering Assignment - Part 1 - Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the fo ...

Question - show that the zero-point energy of a simple

Question - Show that the zero-point energy of a simple harmonic oscillator does not contribute to its entropy or heat capacity, but does contribute to its energy and Helmholtz function.

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As