Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Other Engineering Expert

Assignment -

Transportation - Development was typically approved one project at a time with little consideration to cumulative impacts in form of deterioration of levels of service (LOS) on roadways and increasing delays

Procedure -

  • Determine if proposed development can be accommodated within the existing or planned transportation system.
  • Identify improvements beyond those already anticipated that can accommodate the proposed development.
  • Determine how developments of significant size can occur so as not to adversely affect traffic operations or safety near the site.
  • Identify intersections that might be affected
  • Identify is the level of service will be degrades - longer times between lights, longer delays, etc
  • Create a simulation of the traffic and intersections
  • Add future expected demands
  • Add development demands
  • Determine impacts
  • Create scenarios to minimize impacts
  • Design useful improvements to improve traffic flow and reduce delays

Develop the Following to Analyze

  • Select aerial photographs to initiate the drawing. It is very important to accurately measure the width and length of the images to prevent errors.
  • Import data to the software package and after the pictures are properly scaled, the legs and the sections are created.
  • The turning lanes are added in the appropriate directions from southbound, northbound, westbound, and eastbound.
  • Incorp signals based to their orientation directions.
  • The signal timing is calibrated in the master control plan.
  • Using traffic data obtained from the local traffic agency, the access points percentages and the number of cars are determined.
  • Key times of concern (typically rush hour) are identified for the worst case scenario analysis.
  • Vehicles including trucks, pedestrians, bicycles, buses, and trains, as applicable are added to the model.

Then Simulate and adjust to optimize improvements.

Attachment:- Assignment Files.rar

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M92738849

Have any Question?


Related Questions in Other Engineering

Introduction to engineering design assignment -

Introduction to Engineering Design Assignment - Drafting Question 1 - Field notes and traverse drawing may be an outdated form of keeping and presenting information on the position of features on a site. Modern electroni ...

Task 1using the lab kit design a circuit for the processor

Task 1: Using the lab kit, design a circuit for the processor to control the output of a connected 7-segment LED display device. You will be provided with a standard common anode 7-segment display of the type FND-507 (or ...

Conceptual design of forced-free-mixed convection

Conceptual Design of Forced-Free-Mixed Convection Experiment This assessment is to be completed individually. 1. Learning Outcomes: - Develop a basic ability to conceptually design an experimental apparatus - Use theory ...

Mine safety amp environmental engineering assignment -part

Mine Safety & Environmental Engineering Assignment - Part 1 - Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the fo ...

Assignment -problem 1 - given is the lcc difference

Assignment - Problem 1 - Given is the LCC difference equation that represents some LTI system: y(n) - ¾y(n-1) - ¼y(n-2) = x(n) + x(n-1)   a) Find the impulse response of the system (solve the LCCDE). b) Draw a block diag ...

Q 1a discontinuity is found fully developed from the toe to

Q. 1 A discontinuity is found fully developed from the toe to the bench surface on a 15 m high slope, slope angle 65°. The discontinuity (frictional angle 32° and cohesion 20 kN/m2) is planar and its strike is parallel t ...

This is your second design assignment this assignment

This is your second design assignment. This assignment requires you to design a complex state machine. You are designing a digital alarm clock. There are various designs you can attempt. More complex designs are worth mo ...

Assignment 11 what is the purpose of ore reserve and

ASSIGNMENT 1 1. What is the purpose of ore reserve and resource estimation? Why are resource and reserve estimates important to the mining industry? 2. What is meant by ore? What is meant by the term waste? How is the di ...

Homework - risk and decision management1 you are working

Homework - Risk and Decision Management 1) You are working program X. The total budget allocated to the program is $100 M and it is to be completed in 24 mo. range (R) and passenger capacity (C) are two key performance p ...

Operations engineering assignment -please select only one

Operations Engineering Assignment - Please select only one of the following case studies for your assignment: CASE A. Tesla Motors Tesla is an innovative manufacturer that designs, assemble and sells fully electric vehic ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As