ASSIGNMENT - VERTICAL ALIGNMENT AND SUPERELEVATION

Objective: This assignment develops students' ability to design horizontal and vertical alignments and cross sections for a given section of road.

Students will work in pairs on this assignment but not with a student with whom you have worked on a previous assignment in this subject.

A length of mountain road is being designed from point A through the intersection point B to point C.

A 155m radius curve is to be designed with 60m transition curves to meet V70km/h design speed guidelines.

Point A is at Ch 5000.000 and coordinates E12000, N700, B is at E12600, N900 and C E12700, N600 as shown on the attached plan at scale 1:2500.

At point A the road RL is 39.20 with an existing grade of -0.8%. At point C the road RL is also 39.2 but on a rising grade of 1.0%.

1. Calculate the chainage of the TS, SC, CS, ST and point C and draw the alignment on the contour plan, marking and labelling all 100m chainages as well as the above points and the coordinates of the centre of the 155m radius circle.

2. Design the vertical alignment of the road for a design speed of 70km/h. Draw an appropriate scale longitudinal section showing Natural surface and design centreline each 100m from A to C with length of vertical curve and tabulate CL levels at 20m chainages from Ch5400.000 to Ch5800.000.

3. Design the superelevation development and draw the edge profiles (5.5m L & R) on the longitudinal section from Ch 5400 to Ch 5800

4. Draw 20m interval cross sections from 5400 to 5600 showing design and natural surface and plot the batter offsets on the alignment plan.

5. Your A4 size report must cover the items 1 to 4 clearly and concisely and be presented in a professional style with A3 drawings as a single PDF file.

The VU Collaborate Tender Box for this assignment closes at 6.00 PM Monday 3 October 2016 and counts for 10% of the semester assessment. The use of road design software and spreadsheets are encouraged. The assignment must be submitted as PDF (A4 with an A3 drawing).

1621_Figure.jpg

Attachment:- MAP.pdf

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M91978700
  • Price:- $90

Guranteed 48 Hours Delivery, In Price:- $90

Have any Question?


Related Questions in Other Engineering

Register design a cpu register is simply a row of

Register design A CPU register is simply a row of flip-flops (i.e. SR, JK, T, etc) put side by side in an array to make the size of register required. For example, an 8 bit register has 8 flip-flops side by side for stor ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

Task 1using the lab kit design a circuit for the processor

Task 1: Using the lab kit, design a circuit for the processor to control the output of a connected 7-segment LED display device. You will be provided with a standard common anode 7-segment display of the type FND-507 (or ...

Projection of planes1 a regular pentagon of 25 mm side has

Projection of Planes 1. A regular pentagon of 25 mm side has one side on the ground. Its plane is inclined at 45° to H.P. and perpendicular to the V.P. Draw its projections. 2. Draw the projection of a circle of 50 mm di ...

Q 1a discontinuity is found fully developed from the toe to

Q. 1 A discontinuity is found fully developed from the toe to the bench surface on a 15 m high slope, slope angle 65°. The discontinuity (frictional angle 32° and cohesion 20 kN/m2) is planar and its strike is parallel t ...

Part 1configure verify and troubleshoot wan links and ip

Part 1 Configure, verify and troubleshoot WAN links and IP services Answer to all questions below: 1. What is the name of the Safe Work Australia code of practise that provides guidance on how to manage the risks of elec ...

Assessment practical reportproduce a short technical report

Assessment: Practical Report Produce a short technical report in a form consistent with proteomic journals covering the techniques, results and interpretation of your proteomics experiment in the practical classes. The r ...

Engineering analysis homework -for every problem provide

Engineering Analysis Homework - For every problem, provide The MATLAB script/function files that solve the problems. Problem 1: Write a script that solves the problem. For (c), show results of the evaluation of every ind ...

Assignment 11 what is the purpose of ore reserve and

ASSIGNMENT 1 1. What is the purpose of ore reserve and resource estimation? Why are resource and reserve estimates important to the mining industry? 2. What is meant by ore? What is meant by the term waste? How is the di ...

Mine safety amp environmental engineeringpart 1 questions1

Mine Safety & Environmental Engineering Part 1. Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the following terms ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As