Assignment - Scenario:

You are the asset manager for a Parcel Post company (e.g. Courier Post, NZ Courier, Fastway Couriers). You are planning on giving more visibility to your customers in terms of where their parcels are. Currently, your barcode scanning system, can track the parcel when

the parcel is picked up by the courier van,
the courier van drops the parcel in a depot
the parcel is picked up at the depot by a courier van
the courier van drops the parcel at the destination

The missing information is tracking of the parcels between the depots (ie when the parcel is on the truck). The proposed solution is as follows:

As per current systems, the PARCELs are automatically sorted at the depot and placed in CONTAINERs, which are then loaded on to TRUCKs.

The CONTAINERS are to be tagged with RFID tags (currently they are just collapsible metal or plastic boxes without any RFID tags).

The TRUCKS currently have GPS tracking devices, but do not have sensors to identify which CONTAINERS are loaded. So they need to be fitted with such a device.

We need a SOFTWARE developed to track which PARCEL is in which CONTAINER, which CONTAINER is in which TRUCK, and the GPS location of the TRUCK.

At the destination depot, we need to make sure the CONTAINER is disassociated with the TRUCK when it is unloaded.

The current online tracking portal, where customers are tracking their parcel is to be modified to read the new tracking information from the new SOFTWARE.

Everybody involved needs to be trained appropriately to maintain the system.

Here are some other facts about the project

We have 100 TRCUKS in operation in the country 40 of the TRUCKS are independently owned and operated by individuals and are contracted out to us. They will be responsible for paying for purchasing and maintenance of the devices installed on their TRUCKS.

60 of the TRUCKS are owned by us.

We have 10,000 CONTAINERS. They are mostly sitting at depots and loaded and unloaded to and from the TRUCKS by forklift.

Forklift drivers treat the containers very poorly, and they are often knocked and need repair due to rusting, ware and tea and collisions.
Maintenance is provided by a third party Nationwide.

We need to engage with an external party for developing the SOFTWARE. We have not worked with such a company before.

We have not been able to find a local supplier of the RFID tags (for CONTAINERS) and sensors within our price range.

We have found a supplier in China, who does not have a local representative and have not sold them to a company in NZ before. We have been communicating via email and have got a quote from them.

The project is not time-critical and the the most important aspect of the project is for the whole system to work reliably and without a glitch.

The budget is limited but we have some freedom to ensure the right technology is purchased and implemented.

An internal team comprising 1 Project Manager and 2 Business Analysts have been assigned to you (the Asset Manager).

The ultimate responsibility of operating and maintaining the implemented system is on you.

Assignment:

Using the steps outlined in the lectures slides and the prescribed text book, complete the following tasks (where required make assumptions to fill in the gaps in the project scenario, but state those assumptions clearly in your submission:

Define the project scope

Establish the project priorities

Develop a work breakdown structure for the project (up to 5 Levels of detail)

Develop a risk breakdown structure for the project using the following risk categories (at least 5 risks per category):

Technical
External
Organisational
Project

Evaluate and prioritise the identified risks (6 Marks)

For the Top 3 risks, propose an appropriate risk treatment

List all assumptions

For Task 1 - Project Scope, make sure you cover all the 6 aspects listed on slide

Project Objective is a description of the final system that is being developed.

Deliverables are a list of outcomes that are handed over to you the Asset Manager at the end of the project

Milestones, are critical sub-objectives that must be achieved along the way in order to deliver the deliverables. A deliverable can be a milestone too. A milestone must have a deadline.

Technical requirements, describe the key technical aspects of the project that must work reliably in order for the whole system to function well and interact with other systems in the business.

Limits and exclusions should be used to mark a clear bundary around the project, so it is well understood what is in the project and what is not.

Reviews with customers, refers to how the customer should be informed about the project and involved in the project, in terms of regular review of the project (for this assignment you can assume you are the Customer or you can assume that another executive in the business is the Customer)

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M92481841
  • Price:- $40

Priced at Now at $40, Verified Solution

Have any Question?


Related Questions in Other Engineering

Question 1 define rock mechanics discuss the main

Question 1 . Define rock mechanics. Discuss the main objectives of the application of rock mechanics in mining. Question 2. Define stress. Draw a diagram and define the normal and shear stress by resolving the resultant ...

Mine safety amp environmental engineeringpart 1 questions1

Mine Safety & Environmental Engineering Part 1. Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the following terms ...

Projection of planes1 a regular pentagon of 25 mm side has

Projection of Planes 1. A regular pentagon of 25 mm side has one side on the ground. Its plane is inclined at 45° to H.P. and perpendicular to the V.P. Draw its projections. 2. Draw the projection of a circle of 50 mm di ...

Task 1using the lab kit design a circuit for the processor

Task 1: Using the lab kit, design a circuit for the processor to control the output of a connected 7-segment LED display device. You will be provided with a standard common anode 7-segment display of the type FND-507 (or ...

Mine safety amp environmental engineeringpart 1 questions1

Mine Safety & Environmental Engineering Part 1. Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the following terms ...

Mine safety amp environmental engineering assignment -part

Mine Safety & Environmental Engineering Assignment - Part 1 - Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the fo ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

A detailed review of spatial modulation and simulation

A Detailed Review of Spatial Modulation and Simulation Learning Outcomes a. Learn how to model mobile communication channels d. Discern knowledge development and directions on the recent advances in 4G to the research pr ...

Assignment 11 what is the purpose of ore reserve and

ASSIGNMENT 1 1. What is the purpose of ore reserve and resource estimation? Why are resource and reserve estimates important to the mining industry? 2. What is meant by ore? What is meant by the term waste? How is the di ...

Engineering materials term paper assignment -conduct a

ENGINEERING MATERIALS TERM PAPER ASSIGNMENT - Conduct a thorough literature search and write a 15-20 page technical review paper on the evolution of the engineering materials used in the manufacturing of any one of the f ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As