Ask Engineering Mathematics Expert

Assignment - Modelling our 5x5x5 Rubik's cube

Here are some photos of a cube shaped exhibition area that is part of the Melbourne Museum on Exhibition Street.

285_figure.png

The photo on the right shows the satellite view of the cube using the amazing free program Google Earth. The photo on the left was taken from the ground.

Google Earth allows you to view many prominent buildings in 3d. Imagine that you are the maths wiz at Google whose job it is to create a 3d image of our cube for Google Earth. This means that you have to find coordinates of the corners of the square A, B, C, D visible from the top, as well as the coordinates of the points A', B', C', D' at which four edges of the Cube meet the ground. As indicated in the first picture, A is supposed to be connected to A' by such an edge, and similarly for B and B', C and C', and D and D'.

You are new to this job and you are supposed to base your work on your predecessor's work (who got fired yesterday). His notes are a terrible mess, but it is clear that he started modelling the cube by letting the (fiat) ground coincide with the xy-plane and having the y-axis point West and the x-axis point North. His notes don't tell you where the origin of his coordinate system is supposed to be, but wherever it may be, in this coordinate system A = (42.5062, 34.7033, 8.79659) and C = (32.7431, 8.65133,16.9498). Furthermore, we know that B and D are at equal height above the ground, and that all these numbers are measurements in meters.

Your job also involves figuring out how long the sides of the cube are; how long the four segments AA', BB', CC', DD' are; how large the area of the quadrilateral A', B', C', D' is; and, finally, what the volume of the part of the cube that sits above the ground is.

At the end of your report please summarize your results as follows:

A = (42.6062, 34.7033, 8.79659)

B = (*, *, *)

C = (32.7431, 8.65133, 16.9498)

D = (*,*,*)

A' = (*, *, *)

B' = (*, *, *)

C' = (*, *, *)

D' = (*, *, *)

|AA'| = *m

|BB'| = *m

|CC'| = *m

|DD'| = *m

sidelength = *m

area(A'B'C' D') = *m2

volume = *m3

For any single one of these vectors/values that you get wrong 2 marks will be deducted. Tough rules: one mistake that implies other mistakes will result in every single one of these mistakes being penalized in this way-Google Earth only accepts results that work! Please make absolutely sure that you double-check your results before you submit your report!

There are different approaches to solving this set of problems, including some that don't involve the new mathematical tools that we introduced at the beginning of this unit. However, to make this assignment into a meaningful exercise you should use our new tools in your solutions:

  • The dot product for calculating angles and checking quickly whether an angle is a right angle.
  • The cross product for calculating vectors that are perpendicular to two given vectors (or a plane) in space and for calculating areas of parallelograms, triangles, and other plane figures in space.
  • Line equations for describing lines in space (here, edges of cubes).

Engineering Mathematics, Engineering

  • Category:- Engineering Mathematics
  • Reference No.:- M92808174
  • Price:- $25

Priced at Now at $25, Verified Solution

Have any Question?


Related Questions in Engineering Mathematics

Q undirected vs directed connectivitya prove that in any

Q: Undirected vs. directed connectivity. (a) Prove that in any connected undirected graph G = (V, E) there is a vertex v ? V whose removal leaves G connected. (Hint: Consider the DFS search tree for G.) (b) Give an examp ...

All these questions should be answered in matlab 1 generate

All these questions should be answered in MATLAB !!! 1. Generate a set of 3 random patterns of dimension 12 where each value is +1 or -1.(3 random 12*12 matrix) 2. Create a 12-unit Hopfield network (a 12x12 matrix) from ...

I have these questions for a homework assignment and have

I have these questions for a homework assignment and have to show work. This works with MIPS coding language and is the class Introduction to Computer Architecture. 1. Find the 2's complement representation (in 32-bit he ...

Question 1 - many spas many componentsconsider 4 types of

Question 1 - Many spas, many components Consider 4 types of spa tub: Aqua-Spa (or FirstSpa, or P1), Hydro-Lux (or SecondSpa, or P2), ThirdSpa (or P3) and FourthSpa (or P4), with the production of products P1, ..., P4 in ...

Analytical methods for engineers assignment - calculusthis

ANALYTICAL METHODS FOR ENGINEERS ASSIGNMENT - CALCULUS This assignment assesses Outcome - Analyse and model engineering situations and solve problems using calculus. Questions - Q1. Differentiate the following functions ...

Clculus assignment -q1 find the total differential of w

CALCULUS ASSIGNMENT - Q1. Find the total differential of w = x 3 yz + xy + z + 3 at (x, y, z) = (1, 2, 3). Q2. Find the value of the double integral ∫∫ R (6x + 2y 2 )dA where R = {(x, y)| - 2 ≤ y ≤ 1, y 2 ≤ x ≤ 2 - y. Q3 ...

Numerical analysis assignment -q1 define the following

Numerical Analysis Assignment - Q1. Define the following terms: (i) Truncation error (ii) Round-off error Q2. Show that if f(x) = logx, then the condition number, c(x) = |1/logx|. Hence show that log x is ill-conditioned ...

Question what is the signed binary sum of 1011100 and

Question : What is the signed binary sum of 1011100 and 1110101 in decimal? Show all of your work. What is the hexadecimal sum of 9A88 and 4AF6 in hexadecimal and decimal? Show all of your work.

Question a signal starts at point x as it travels to point

Question : A signal starts at point X. As it travels to point Y, it loses 8 dB. At point Y, the signal is boosted by 10 bB. As the signal travels to point Z, it loses 7 dB. The dB strength of the signal at point Z is -5 ...

Show all your work not just the answerswhen you multiply 21

(SHOW ALL YOUR WORK, not just the answers) When you multiply: 21 x 68 you most likely do: 8x1 + 8x20 + 60x1 + 60x20 = 1, 428 So, there are 4 multiplications and then 3 additions. How long would it take a computer to do t ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As