Ask Engineering Mathematics Expert

Assignemnt

Question 1
In a linear programming problem, all model parameters are assumed to be known with certainty.

True
False

Question 2
Graphical solutions to linear programming problems have an infinite number of possible objective function lines.

True
False

Question 3
In minimization LP problems the feasible region is always below the resource constraints.

True
False

Question 4
Surplus variables are only associated with minimization problems.

True
False

Question 5
If the objective function is parallel to a constraint, the constraint is infeasible.

True
False

Question 6
A linear programming model consists of only decision variables and constraints.

True
False

Question 7
A feasible solution violates at least one of the constraints.

True
False

Question 8
The following is a graph of a linear programming problem. The feasible solution space is shaded, and the optimal solution is at the point labeledZ*.
(graph did not copy/paste)
Which of the following constraints has a surplus greater than 0?

BF
CG
DH
AJ

Question 9
Cully furniture buys 2 products for resale: big shelves (B) and medium shelves (M). Each big shelf costs $500 and requires 100 cubic feet of storage space, and each medium shelf costs $300 and requires 90 cubic feet of storage space. The company has $75000 to invest in shelves this week, and the warehouse has 18000 cubic feet available for storage. Profit for each big shelf is $300 and for each medium shelf is $150. What is the maximum profit?

$25000
$35000
$45000
$55000
$65000

Question 10
The following is a graph of a linear programming problem. The feasible solution space is shaded, and the optimal solution is at the point labeledZ*.
graph did not copy/paste
The equation for constraint DH is:

4X + 8Y ≥ 32
8X + 4Y ≥ 32
X + 2Y ≥ 8
2X + Y ≥ 8

Question 11
The production manager for the Coory soft drink company is considering the production of 2 kinds of soft drinks: regular and diet. Two of her limited resources are production time (8 hours = 480 minutes per day) and syrup (1 of her ingredients) limited to 675 gallons per day. To produce a regular case requires 2 minutes and 5 gallons of syrup, while a diet case needs 4 minutes and 3 gallons of syrup. Profits for regular soft drink are $3.00 per case and profits for diet soft drink are $2.00 per case. For the production combination of 135 cases of regular and 0 cases of diet soft drink, which resources will not be completely used?

only time
only syrup
time and syrup
neither time nor syrup

Question 12
In a linear programming problem, the binding constraints for the optimal solution are:
5x1 + 3x2 ≤ 30
2x1 + 5x2 ≤ 20
Which of these objective functions will lead to the same optimal solution?

2x1 + 1x2
7x1 + 8x2
80x1 + 60x2
25x1 + 15x2

Question 13
In a linear programming problem, a valid objective function can be represented as

Max Z = 5xy
Max Z 5x2 + 2y2
Max 3x + 3y + 1/3z
Min (x1 + x2) / x3

Question 14
Cully furniture buys 2 products for resale: big shelves (B) and medium shelves (M). Each big shelf costs $500 and requires 100 cubic feet of storage space, and each medium shelf costs $300 and requires 90 cubic feet of storage space. The company has $75000 to invest in shelves this week, and the warehouse has 18000 cubic feet available for storage. Profit for each big shelf is $300 and for each medium shelf is $150. What is the objective function?

MAX Z = $300B + $100 M
MAX Z = $300M + $150 B
MAX Z = $300B + $150 M
MAX Z = $300B + $500 M

Question 15
A graphical representation of a linear program is shown below. The shaded area represents the feasible region, and the dashed line in the middle is the slope of the objective function.
graph did not copy/paste
If this is a maximization, which extreme point is the optimal solution?

Point B
Point C
Point D
Point E

Question 16
The following is a graph of a linear programming problem. The feasible solution space is shaded, and the optimal solution is at the point labeledZ*.
graph did not copy/paste
This linear programming problem is a:

maximization problem
minimization problem
irregular problem
cannot tell from the information given

Question 17
The production manager for the Coory soft drink company is considering the production of 2 kinds of soft drinks: regular (R) and diet(D). Two of the limited resources are production time (8 hours = 480 minutes per day) and syrup limited to 675 gallons per day. To produce a regular case requires 2 minutes and 5 gallons of syrup, while a diet case needs 4 minutes and 3 gallons of syrup. Profits for regular soft drink are $3.00 per case and profits for diet soft drink are $2.00 per case. What is the time constraint?

2R + 5D ≤ 480
2D + 4R ≤ 480
2R + 3D ≤ 480
2R + 4D ≤ 480

Question 18
Solve the following graphically
Max z = 3x1 +4x2
s.t. x1 + 2x2 ≤ 16
2x1 + 3x2 ≤ 18
x1 ≥ 2
x2 ≤ 10
x1, x2 ≥ 0
Find the optimal solution. What is the value of the objective function at the optimal solution? Note: The will be an integer. Please give your as an integer without any decimal point. For example, 25.0 (twenty five) would be written 25

Question 19
Max Z = $3x + $9y
Subject to: 20x + 32y ≤ 1600
4x + 2y ≤ 240
y ≤ 40
x, y ≥ 0
At the optimal solution, what is the amount of slack associated with the second constraint?

Question 20
Consider the following linear programming problem:
Max Z = $15x + $20y
Subject to: 8x + 5y ≤ 40
0.4x + y ≥ 4
x, y ≥ 0
At the optimal solution, what is the amount of slack associated with the first constraint?

Engineering Mathematics, Engineering

  • Category:- Engineering Mathematics
  • Reference No.:- M92242139
  • Price:- $20

Priced at Now at $20, Verified Solution

Have any Question?


Related Questions in Engineering Mathematics

Q undirected vs directed connectivitya prove that in any

Q: Undirected vs. directed connectivity. (a) Prove that in any connected undirected graph G = (V, E) there is a vertex v ? V whose removal leaves G connected. (Hint: Consider the DFS search tree for G.) (b) Give an examp ...

All these questions should be answered in matlab 1 generate

All these questions should be answered in MATLAB !!! 1. Generate a set of 3 random patterns of dimension 12 where each value is +1 or -1.(3 random 12*12 matrix) 2. Create a 12-unit Hopfield network (a 12x12 matrix) from ...

I have these questions for a homework assignment and have

I have these questions for a homework assignment and have to show work. This works with MIPS coding language and is the class Introduction to Computer Architecture. 1. Find the 2's complement representation (in 32-bit he ...

Question 1 - many spas many componentsconsider 4 types of

Question 1 - Many spas, many components Consider 4 types of spa tub: Aqua-Spa (or FirstSpa, or P1), Hydro-Lux (or SecondSpa, or P2), ThirdSpa (or P3) and FourthSpa (or P4), with the production of products P1, ..., P4 in ...

Analytical methods for engineers assignment - calculusthis

ANALYTICAL METHODS FOR ENGINEERS ASSIGNMENT - CALCULUS This assignment assesses Outcome - Analyse and model engineering situations and solve problems using calculus. Questions - Q1. Differentiate the following functions ...

Clculus assignment -q1 find the total differential of w

CALCULUS ASSIGNMENT - Q1. Find the total differential of w = x 3 yz + xy + z + 3 at (x, y, z) = (1, 2, 3). Q2. Find the value of the double integral ∫∫ R (6x + 2y 2 )dA where R = {(x, y)| - 2 ≤ y ≤ 1, y 2 ≤ x ≤ 2 - y. Q3 ...

Numerical analysis assignment -q1 define the following

Numerical Analysis Assignment - Q1. Define the following terms: (i) Truncation error (ii) Round-off error Q2. Show that if f(x) = logx, then the condition number, c(x) = |1/logx|. Hence show that log x is ill-conditioned ...

Question what is the signed binary sum of 1011100 and

Question : What is the signed binary sum of 1011100 and 1110101 in decimal? Show all of your work. What is the hexadecimal sum of 9A88 and 4AF6 in hexadecimal and decimal? Show all of your work.

Question a signal starts at point x as it travels to point

Question : A signal starts at point X. As it travels to point Y, it loses 8 dB. At point Y, the signal is boosted by 10 bB. As the signal travels to point Z, it loses 7 dB. The dB strength of the signal at point Z is -5 ...

Show all your work not just the answerswhen you multiply 21

(SHOW ALL YOUR WORK, not just the answers) When you multiply: 21 x 68 you most likely do: 8x1 + 8x20 + 60x1 + 60x20 = 1, 428 So, there are 4 multiplications and then 3 additions. How long would it take a computer to do t ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As