Assessment Task - High Level Project Cost EstimateProject: Construction of Carbon Revolution Building

1. BACKGROUND Introduction

You are members of the Capital Projects Team of Facility Services Department at Deakin University who are assigned to undertake work encompassing a high level estimate of building cost of the Structural Works for the Carbon Revolution Building 2, located in the Waurn Ponds campus of Deakin University.

2. THE DESIGN BRIEF & SCOPE

The work for this project is to be advertised for tender in the near future. To date, some of the design drawings have been completed. For this stage, a high level cost estimate is required for the owner estimate of the cost of the project. The following scope of work has been assigned for the high level project cost estimate.

- The site location is as indicated (Appendix A)
- The design drawings are provided (Appendix B)
- Additional drawings may be released during the design progress
- The cost estimate is only for foundation and structure of the building
- The Bill of Quantities is to be completed (Appendix C)
- The cost of work is to be estimated based on published construction rates (e.g.
Rawlinsons Construction Handbook, Cordell Building Cost Guide, Aust. Institute of Quantity Surveyors, etc.)
- Any assumptions, notes or disclaimers regarding your cost estimate should be documented in your Assessment 1 report submission and in your Journal Diary

You may insert additional rows under ‘D. MISCELLANEOUS' section for other costs you can identify from the drawings, as well as providing some brief details on each of these additional items.

3. CONDUCT OF WORK
The Deakin University rules and regulations apply to this work.

4. SITE INSPECTIONS
At this stage, site inspections are not required. Employees may use satellite image to acquaint themselves with the site where any work is to be undertaken. Refer to Appendix A.

5. EXTENT OF WORK
A. The overall works to be undertaken includes:
- Undertaking high-level (rough) estimate of works quantity based on provided design drawings of the project
- Undertaking research on the unit rates (unit price) to conduct construction works for the project
- Provision of completed Bill of Quantities with prices
- Clearly specifying the source of data and additional information about justification as required, conditions, inclusions or limitation of the rates
B. This Assessment should be submitted as a group report.
C. A table indicating group members' contribution to the works should be submitted with the report.
D. Only 1 report per group is to be submitted via CloudDeakin.
E. Groups will be allocated in Week 1 Seminars or via CloudDeakin for off-campus students.

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M91898800
  • Price:- $110

Guranteed 48 Hours Delivery, In Price:- $110

Have any Question?


Related Questions in Other Engineering

Register design a cpu register is simply a row of

Register design A CPU register is simply a row of flip-flops (i.e. SR, JK, T, etc) put side by side in an array to make the size of register required. For example, an 8 bit register has 8 flip-flops side by side for stor ...

A detailed review of spatial modulation and simulation

A Detailed Review of Spatial Modulation and Simulation Learning Outcomes a. Learn how to model mobile communication channels d. Discern knowledge development and directions on the recent advances in 4G to the research pr ...

Mine safety amp environmental engineering assignment -part

Mine Safety & Environmental Engineering Assignment - Part 1 - Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the fo ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

Learning outcomes evaluate multiuser communication and

Learning Outcomes Evaluate multiuser communication and resource sharing techniques; Apply the techniques of, and report on, digital communication applications using Matlab and hardware devices. Assignment Description The ...

Operations engineering assignment -please select only one

Operations Engineering Assignment - Please select only one of the following case studies for your assignment: CASE A. Tesla Motors Tesla is an innovative manufacturer that designs, assemble and sells fully electric vehic ...

Select a risk problem from the list below and prepare a

Select a risk problem from the list below and prepare a risk management plan in accordance with AS/NZS ISO 31000:2009. Please ensure that: - Establish the context clearly, in accordance with the Standard; - Define your s ...

Engineering materials term paper assignment -conduct a

ENGINEERING MATERIALS TERM PAPER ASSIGNMENT - Conduct a thorough literature search and write a 15-20 page technical review paper on the evolution of the engineering materials used in the manufacturing of any one of the f ...

Task 1using the lab kit design a circuit for the processor

Task 1: Using the lab kit, design a circuit for the processor to control the output of a connected 7-segment LED display device. You will be provided with a standard common anode 7-segment display of the type FND-507 (or ...

Control theory - lab reportsfor experiments 1 to 4 you must

Control Theory - Lab Reports For experiments 1 to 4 you must undertake the following: a) At the start of each section (including the pre-lab activities) there are a number learning outcomes. That is, what students should ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As