Assessment Task - High Level Project Cost EstimateProject: Construction of Carbon Revolution Building

1. BACKGROUND Introduction

You are members of the Capital Projects Team of Facility Services Department at Deakin University who are assigned to undertake work encompassing a high level estimate of building cost of the Structural Works for the Carbon Revolution Building 2, located in the Waurn Ponds campus of Deakin University.

2. THE DESIGN BRIEF & SCOPE

The work for this project is to be advertised for tender in the near future. To date, some of the design drawings have been completed. For this stage, a high level cost estimate is required for the owner estimate of the cost of the project. The following scope of work has been assigned for the high level project cost estimate.

- The site location is as indicated (Appendix A)
- The design drawings are provided (Appendix B)
- Additional drawings may be released during the design progress
- The cost estimate is only for foundation and structure of the building
- The Bill of Quantities is to be completed (Appendix C)
- The cost of work is to be estimated based on published construction rates (e.g.
Rawlinsons Construction Handbook, Cordell Building Cost Guide, Aust. Institute of Quantity Surveyors, etc.)
- Any assumptions, notes or disclaimers regarding your cost estimate should be documented in your Assessment 1 report submission and in your Journal Diary

You may insert additional rows under ‘D. MISCELLANEOUS' section for other costs you can identify from the drawings, as well as providing some brief details on each of these additional items.

3. CONDUCT OF WORK
The Deakin University rules and regulations apply to this work.

4. SITE INSPECTIONS
At this stage, site inspections are not required. Employees may use satellite image to acquaint themselves with the site where any work is to be undertaken. Refer to Appendix A.

5. EXTENT OF WORK
A. The overall works to be undertaken includes:
- Undertaking high-level (rough) estimate of works quantity based on provided design drawings of the project
- Undertaking research on the unit rates (unit price) to conduct construction works for the project
- Provision of completed Bill of Quantities with prices
- Clearly specifying the source of data and additional information about justification as required, conditions, inclusions or limitation of the rates
B. This Assessment should be submitted as a group report.
C. A table indicating group members' contribution to the works should be submitted with the report.
D. Only 1 report per group is to be submitted via CloudDeakin.
E. Groups will be allocated in Week 1 Seminars or via CloudDeakin for off-campus students.

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M91898800
  • Price:- $110

Guranteed 48 Hours Delivery, In Price:- $110

Have any Question?


Related Questions in Other Engineering

Mine safety amp environmental engineeringpart 1 questions1

Mine Safety & Environmental Engineering Part 1. Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the following terms ...

Conceptual design of forced-free-mixed convection

Conceptual Design of Forced-Free-Mixed Convection Experiment This assessment is to be completed individually. 1. Learning Outcomes: - Develop a basic ability to conceptually design an experimental apparatus - Use theory ...

Q 1a discontinuity is found fully developed from the toe to

Q. 1 A discontinuity is found fully developed from the toe to the bench surface on a 15 m high slope, slope angle 65°. The discontinuity (frictional angle 32° and cohesion 20 kN/m2) is planar and its strike is parallel t ...

Select a risk problem from the list below and prepare a

Select a risk problem from the list below and prepare a risk management plan in accordance with AS/NZS ISO 31000:2009. Please ensure that: - Establish the context clearly, in accordance with the Standard; - Define your s ...

Mine safety amp environmental engineeringpart 1 questions1

Mine Safety & Environmental Engineering Part 1. Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the following terms ...

Question 1 define rock mechanics discuss the main

Question 1 . Define rock mechanics. Discuss the main objectives of the application of rock mechanics in mining. Question 2. Define stress. Draw a diagram and define the normal and shear stress by resolving the resultant ...

Introduction to engineering design assignment -

Introduction to Engineering Design Assignment - Drafting Question 1 - Field notes and traverse drawing may be an outdated form of keeping and presenting information on the position of features on a site. Modern electroni ...

Engineering materials term paper assignment -conduct a

ENGINEERING MATERIALS TERM PAPER ASSIGNMENT - Conduct a thorough literature search and write a 15-20 page technical review paper on the evolution of the engineering materials used in the manufacturing of any one of the f ...

Homework - risk and decision management1 you are working

Homework - Risk and Decision Management 1) You are working program X. The total budget allocated to the program is $100 M and it is to be completed in 24 mo. range (R) and passenger capacity (C) are two key performance p ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As