Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Computer Engineering Expert

Architecture Assignment

1. Consider two programs running on a computer.

a. The first program's instructions can be broken into the following classes of instruction with associated percentages of the program:

 

Type A

Type B

Type C

Type D

CPI:

2

2

3

1

Percentage of Instructions:

21%

14%

34%

30%

Percentage of Instructions: 21% 14% 34% 30%

Calculate the average CPI for the first program.

b. Assume the second program has an average CPI of 2.21 and IC = 22 x 103 and the CPU clock rate is 3.0 GHz. What is the run time of the program expressed in microseconds?

2. Assume we have a reference program P1 with 45,323,900 instructions that runs on a Motorola chip with an average CPI of 5. 6 and a clock rate of 3.8 GHz.

a. What is the execution time of P1 on the Motorola chip?

b. If a second program P2 runs 1.3 times faster on the Motorola chip with a clock rate of 4.0 GHz and the same instruction count, what is the CPI for P2?

3. Consider a program comprising 25% arithmetic instructions, 32% load instruction, 13% store instructions, and 30% branch instructions. Assume the CPI for arithmetic instructions is 1, for load and store instructions it is 4, and branches have a CPI of 2. The CPU clock rate is 3.4 GHz. We have a reference program with 1,102,000 instructions.

a. What is the run time of the program given?

b. Consider running the program on a machine with a large graphics card. When we run the program on this machine, the arithmetic instructions only can be run in parallel on the card, everything else is run sequentially. As the number of stream processors on the GPU goes toward infinity, what is the maximum speedup obtainable on this program?

c. Consider running the program on a version of the CPU with a clock rate of 2.4 GHz, but which has a CPI of 3 for load and store instructions (all other's CPIs remain the same). Which CPU performs better on the program and by how much?

4. An architecture runs a program of interest in 46 seconds on a particular computer chip constructed on a 90nm fab. Six years later a newer version of the chip requires only 11.5 seconds to run the same program.

a. Assuming the improvement comes primarily from clock rate, and the original chip ran at 1.2 GHz, what is the approximate new clock rate?

b. If the improvement in clock rate is due to Dennard scaling, what should be the approximate fabrication size, 14nm, 22nm, 32nm, or 45nm and why?

c. What Law accounts for the improved performance of this chip over time?

Computer Engineering, Engineering

  • Category:- Computer Engineering
  • Reference No.:- M92581209
  • Price:- $35

Priced at Now at $35, Verified Solution

Have any Question?


Related Questions in Computer Engineering

Systems analysis project personal trainer inc owns and

Systems analysis project Personal Trainer, Inc. owns and operates fitness centers in a dozen Midwestern cities. The centers have done well, and the company is planning an international expansion by opening a new "superce ...

A compute the sumnbsps1nbsp 1 2 3 nbsp nbsp 9999 the sum

(a) Compute the sum S1 = 1 + 2 + 3 + . . . + 9999 (the sum of all integers from 1 to 9999). Do not use a program. (b) Compute the sum S2 = 1+3+5+...+9999 (the sum of all odd integers from 1 to 9999). Do not use a program ...

Question you must use the following outline for your paper

Question: You MUST use the following outline for your paper. All direct and indirect quotes should be properly cited using APA formatting. All sections should be labeled. This week's paper is a final draft. All spelling, ...

If you want to answer a research question regarding whether

If you want to answer a research question regarding whether a particular group of subjects experiences any significant changes in behavior as they age but you do not have the time or money for a traditional longitudinal ...

Reading the biographybook where the body meets memory by

Reading the Biography Book : "Where the Body Meets Memory" by David Mura Questions: INFERENCE AND ANALYSIS QUESTION - Mura is particularly interested in using italics and different font types to represent different peopl ...

Why do the chemically similar alkali metal chlorides nacl

Why do the chemically similar alkali metal chlorides NaCl and CsCl have different structures, whereas the chemically different NaCl and MnS have the same structure?

Configuring name resolutionas the administrator of the

Configuring Name Resolution As the administrator of the Contoso Corporation, you manage an internal website that is often used by most users with the company. You try to connect to an internal website but cannot open the ...

Systems analysis projectpersonal trainer inc owns and

Systems analysis project Personal Trainer, Inc. owns and operates fitness centers in a dozen Midwestern cities. The centers have done well, and the company is planning an international expansion by opening a new "superce ...

Show how someone who is on the no-fly list can manage to

Show how someone who is on the no-fly list can manage to fly provided that boarding passes could be generated online (as an HTML page) and then printed. Please provide a step-by-step description of the attack. Which addi ...

Show a schedule with two transactions that share a single

Show a schedule with two transactions that share a single data item (A in block BA) and that is not serializable, but that is equivalent to a serial schedule of the two transactions for certain initial values of A. Indic ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As