Ask Computer Engineering Expert

Architecture Assignment

1. Consider two programs running on a computer.

a. The first program's instructions can be broken into the following classes of instruction with associated percentages of the program:

 

Type A

Type B

Type C

Type D

CPI:

2

2

3

1

Percentage of Instructions:

21%

14%

34%

30%

Percentage of Instructions: 21% 14% 34% 30%

Calculate the average CPI for the first program.

b. Assume the second program has an average CPI of 2.21 and IC = 22 x 103 and the CPU clock rate is 3.0 GHz. What is the run time of the program expressed in microseconds?

2. Assume we have a reference program P1 with 45,323,900 instructions that runs on a Motorola chip with an average CPI of 5. 6 and a clock rate of 3.8 GHz.

a. What is the execution time of P1 on the Motorola chip?

b. If a second program P2 runs 1.3 times faster on the Motorola chip with a clock rate of 4.0 GHz and the same instruction count, what is the CPI for P2?

3. Consider a program comprising 25% arithmetic instructions, 32% load instruction, 13% store instructions, and 30% branch instructions. Assume the CPI for arithmetic instructions is 1, for load and store instructions it is 4, and branches have a CPI of 2. The CPU clock rate is 3.4 GHz. We have a reference program with 1,102,000 instructions.

a. What is the run time of the program given?

b. Consider running the program on a machine with a large graphics card. When we run the program on this machine, the arithmetic instructions only can be run in parallel on the card, everything else is run sequentially. As the number of stream processors on the GPU goes toward infinity, what is the maximum speedup obtainable on this program?

c. Consider running the program on a version of the CPU with a clock rate of 2.4 GHz, but which has a CPI of 3 for load and store instructions (all other's CPIs remain the same). Which CPU performs better on the program and by how much?

4. An architecture runs a program of interest in 46 seconds on a particular computer chip constructed on a 90nm fab. Six years later a newer version of the chip requires only 11.5 seconds to run the same program.

a. Assuming the improvement comes primarily from clock rate, and the original chip ran at 1.2 GHz, what is the approximate new clock rate?

b. If the improvement in clock rate is due to Dennard scaling, what should be the approximate fabrication size, 14nm, 22nm, 32nm, or 45nm and why?

c. What Law accounts for the improved performance of this chip over time?

Computer Engineering, Engineering

  • Category:- Computer Engineering
  • Reference No.:- M92581209
  • Price:- $35

Priced at Now at $35, Verified Solution

Have any Question?


Related Questions in Computer Engineering

Does bmw have a guided missile corporate culture and

Does BMW have a guided missile corporate culture, and incubator corporate culture, a family corporate culture, or an Eiffel tower corporate culture?

Rebecca borrows 10000 at 18 compounded annually she pays

Rebecca borrows $10,000 at 18% compounded annually. She pays off the loan over a 5-year period with annual payments, starting at year 1. Each successive payment is $700 greater than the previous payment. (a) How much was ...

Jeff decides to start saving some money from this upcoming

Jeff decides to start saving some money from this upcoming month onwards. He decides to save only $500 at first, but each month he will increase the amount invested by $100. He will do it for 60 months (including the fir ...

Suppose you make 30 annual investments in a fund that pays

Suppose you make 30 annual investments in a fund that pays 6% compounded annually. If your first deposit is $7,500 and each successive deposit is 6% greater than the preceding deposit, how much will be in the fund immedi ...

Question -under what circumstances is it ethical if ever to

Question :- Under what circumstances is it ethical, if ever, to use consumer information in marketing research? Explain why you consider it ethical or unethical.

What are the differences between four types of economics

What are the differences between four types of economics evaluations and their differences with other two (budget impact analysis (BIA) and cost of illness (COI) studies)?

What type of economic system does norway have explain some

What type of economic system does Norway have? Explain some of the benefits of this system to the country and some of the drawbacks,

Among the who imf and wto which of these governmental

Among the WHO, IMF, and WTO, which of these governmental institutions do you feel has most profoundly shaped healthcare outcomes in low-income countries and why? Please support your reasons with examples and research/doc ...

A real estate developer will build two different types of

A real estate developer will build two different types of apartments in a residential area: one- bedroom apartments and two-bedroom apartments. In addition, the developer will build either a swimming pool or a tennis cou ...

Question what some of the reasons that evolutionary models

Question : What some of the reasons that evolutionary models are considered by many to be the best approach to software development. The response must be typed, single spaced, must be in times new roman font (size 12) an ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As