Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Engineering Mathematics Expert

A mathematical programming system named SilverScreener uses a 0-1 integer programming model to help theater managers decide which movies to show on a weekly basis in a multiple-screen theater (Interfaces, May/June 2001). Suppose that management of Valley Cinemas would like to investigate the potential of using a similar scheduling system for their chain of multiple-screen theaters. Valley selected a small two-screen movie theater for the pilot testing and would like to develop an integer programming model to help schedule movies for the next four weeks. Six movies are available. The first week each movie is available, the last week each movie can be shown, and the maximum number of weeks that each movie can run is shown here.

Movie

First Week Available

Last Week Available

Max. Run (weeks)

1

1

2

2

2

1

3

2

3

1

1

2

4

2

4

2

5

3

6

3

6

3

5

3

The overall viewing schedule for the theater is composed of the individual schedules for each of the six movies. For each movie a schedule must be developed that specifies the week the movie starts and the number of consecutive weeks it will run. For instance, one possible schedule for movie 2 is for it to start in week 1 and run for two weeks. Theater policy requires that once a movie is started it must be shown in consecutive weeks. It can not be stopped and restarted again. To represent the schedule possibilities for each movie, the following decision variables were developed:

Xijw = 1 if movie i is scheduled to start in week j and run for w weeks; 0 otherwise

For example, x532 = 1 means that the schedule selected for movie 5 is to begin in week 3 and run for two weeks. For each movie, a separate variable is given for each possible schedule.

a. Three schedules are assigned with movie 1. Define the variables that represent these schedules.

b. Develop a constraint requiring that only one schedule be selected for movie 1.

c. Develop a constraint requiring that only one schedule be selected for movie 5.

d. Develop a constraint that restricts the number of movies selected for viewing in week 1.

e. Develop a constraint that restricts the number of movies selected for viewing in week 3.

Engineering Mathematics, Engineering

  • Category:- Engineering Mathematics
  • Reference No.:- M91630883
  • Price:- $25

Priced at Now at $25, Verified Solution

Have any Question?


Related Questions in Engineering Mathematics

Q undirected vs directed connectivitya prove that in any

Q: Undirected vs. directed connectivity. (a) Prove that in any connected undirected graph G = (V, E) there is a vertex v ? V whose removal leaves G connected. (Hint: Consider the DFS search tree for G.) (b) Give an examp ...

1 this problem concerns of the proof of the np-completeness

(1) This problem concerns of the proof of the NP-completeness of 300L a) Convert the formula F into a 300L graph b) Find a solution for the 300L instance of F and verify that it is a solution for F F = (Z 1 V Z 2 ) ^ (z ...

Problem -consider a closed convex set x sub rd a function h

Problem - Consider a closed convex set X ⊂ R d , a function H : X x Ξ ι→ R d , and a deterministic nonnegative sequence {α n } such that n=0 ∑ ∞ α n = ∞ and n=0 ∑ ∞ (α n ) 2 = ∞. Consider an inner product (·, ·) on R d , ...

Question a suppose that you are given an instance of the

Question : (a) Suppose that you are given an instance of the MST problem on a graph G, with edge weights that are all positive and distinct. Let T be the minimum spanning tree for G returned by Kruskal's algorithm. Now s ...

Analytical methods for engineers assignment - calculusthis

ANALYTICAL METHODS FOR ENGINEERS ASSIGNMENT - CALCULUS This assignment assesses Outcome - Analyse and model engineering situations and solve problems using calculus. Questions - Q1. Differentiate the following functions ...

Question 1 - many spas many componentsconsider 4 types of

Question 1 - Many spas, many components Consider 4 types of spa tub: Aqua-Spa (or FirstSpa, or P1), Hydro-Lux (or SecondSpa, or P2), ThirdSpa (or P3) and FourthSpa (or P4), with the production of products P1, ..., P4 in ...

Question a signal starts at point x as it travels to point

Question : A signal starts at point X. As it travels to point Y, it loses 8 dB. At point Y, the signal is boosted by 10 bB. As the signal travels to point Z, it loses 7 dB. The dB strength of the signal at point Z is -5 ...

Question what is the signed binary sum of 1011100 and

Question : What is the signed binary sum of 1011100 and 1110101 in decimal? Show all of your work. What is the hexadecimal sum of 9A88 and 4AF6 in hexadecimal and decimal? Show all of your work.

I have these questions for a homework assignment and have

I have these questions for a homework assignment and have to show work. This works with MIPS coding language and is the class Introduction to Computer Architecture. 1. Find the 2's complement representation (in 32-bit he ...

Assignment - lp problemsthe data for all the problems in

Assignment - LP problems The data for all the problems in this HW are included in the LP_problems_xlsx spreadsheet Problem 1: Cash Planning A startup investment project needs money to cover its cash flow needs. At the en ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As