1. List the main sources of heat and humidity in mines.

2. Briefly describe the methods that can be used to control heat and humidity in an underground mining situation.

3. The conditions at the entrance to a crosscut are temperatures, 28°C wet bulb and 35°C dry bulb and barometric pressure 110 kPa. At the exit of the crosscut the temperatures are 31°C wet bulb and 32°C dry bulb and the barometric pressure 110 kPa. The volume flow at the entrance is 55 m3/s. Determine;

• the water picked up in litres per day ,
• the heat picked up by the air in kW ,
• the increase in relative humidity .

4. What are the primary sources of dust in underground mining operations? Detail the methods of dust control available.

5. What is methane layering and how can it be controlled in a mine ventilation system.

6. Describe the construction of an explosion proof seal.

7. What indicators can be used to determine if an underground fire is developing and how do these indicators change as the fire develops.

8. Define the following:
• Antitropal Ventilation
• Homotropal Ventilation
• Ascentional Ventilation
• Descentional Ventilation

What are the objectives of a mine ventilation system?

9. List the main ventilation contaminants.

What systems are available for the ventilation of dead end drivages? For each system, sketch the system and detail particular advantages and disadvantages of the system.

What are the advantages of siting main mine fans on surface?

10. Detail the main parameters involved in the metabolic heat balance of a human being and define the main factors, which influence a human's ability to work in a hot environment. Briefly describe the following heat stress indices, comment on any short comings and give limiting good practice values for each which can be employed for heat stress management and design purposes;

• Wet bulb temperature
• Effective temperature
• Air Cooling Power.

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M9898046
  • Price:- $20

Priced at Now at $20, Verified Solution

Have any Question?


Related Questions in Other Engineering

Assignment 11 what is the purpose of ore reserve and

ASSIGNMENT 1 1. What is the purpose of ore reserve and resource estimation? Why are resource and reserve estimates important to the mining industry? 2. What is meant by ore? What is meant by the term waste? How is the di ...

Select a risk problem from the list below and prepare a

Select a risk problem from the list below and prepare a risk management plan in accordance with AS/NZS ISO 31000:2009. Please ensure that: - Establish the context clearly, in accordance with the Standard; - Define your s ...

Assignment 11 what is the purpose of ore reserve and

ASSIGNMENT 1 1. What is the purpose of ore reserve and resource estimation? Why are resource and reserve estimates important to the mining industry? 2. What is meant by ore? What is meant by the term waste? How is the di ...

Mine safety amp environmental engineeringpart 1 questions1

Mine Safety & Environmental Engineering Part 1. Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the following terms ...

Register design a cpu register is simply a row of

Register design A CPU register is simply a row of flip-flops (i.e. SR, JK, T, etc) put side by side in an array to make the size of register required. For example, an 8 bit register has 8 flip-flops side by side for stor ...

Q 1a discontinuity is found fully developed from the toe to

Q. 1 A discontinuity is found fully developed from the toe to the bench surface on a 15 m high slope, slope angle 65°. The discontinuity (frictional angle 32° and cohesion 20 kN/m2) is planar and its strike is parallel t ...

Engineering materials term paper assignment -conduct a

ENGINEERING MATERIALS TERM PAPER ASSIGNMENT - Conduct a thorough literature search and write a 15-20 page technical review paper on the evolution of the engineering materials used in the manufacturing of any one of the f ...

Part 1configure verify and troubleshoot wan links and ip

Part 1 Configure, verify and troubleshoot WAN links and IP services Answer to all questions below: 1. What is the name of the Safe Work Australia code of practise that provides guidance on how to manage the risks of elec ...

Conceptual design of forced-free-mixed convection

Conceptual Design of Forced-Free-Mixed Convection Experiment This assessment is to be completed individually. 1. Learning Outcomes: - Develop a basic ability to conceptually design an experimental apparatus - Use theory ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As