Ask Computer Engineering Expert

1. Code to assembly #1

Write the assembly code for the following:

if (x < y)

y=x;

else

Assume:

y= y*32;

i. ‘x' and ‘y' addresses are stored in %ecx and %edx.

ii. Use registers %eax and %ebx to store ‘x' and ‘y' during computations.

iii. Use immediate for any constants.

2. Code to assembly #2

Write the assembly level program for the following:

if (a[1] == 0)
    a[2]++;

else

     if (a[2]!= 0)
          a[2+i] += a[i+1];

Assume:
1. Base address of integer array a is stored in %esp
2. The value of i is available in %ecx

3. Computing assembly code output. Computing condition codes.

Given the following state of the registers and memory:

Address

Value

 

Register

Value

0x309

0xFF

%al

0x99

0x30A

0x1

%ebx

0x30C

0x30B

0x2

%ecx

0xFFFFFFFF

0x30C

0x20

%dl

0xFF

 

 

%esp

0x1

The following instructions are executed sequentially:

cmpb %dl, %al jge L1
cmovl $EC, %al subb %dl, %al js L2
L1:
subb $3, %ebx L2:
addb (%ebx), %dl

Fill up the below table as follows:

• Cross out the instructions that are not executed (if any).
• After every instruction is executed, write the status of the condition codes and changes to any register or memory location in the adjacent columns.
• What are the final hexadecimal values of the registers %al, %ebx %ecx and %dl?

Instruction

CF

ZF

SF

OF

Your calculations to determine output of move, compare and arithmetic operations & changes to register/memory (if any)

cmpb %dl, %al

 

 

 

 

 

jge L2

 

 

 

 

 

cmovl $EC, %al

 

 

 

 

 

subb %al, %dl

 

 

 

 

 

js L1

 

 

 

 

 

L1:

subb $3, %ebx

 

 

 

 

 

L2:

addb (%ebx), %dl

 

 

 

 

 

 

4. Stack creation

Each time a new procedure is called, a new stack frame is created for that procedure. Assume that a procedure P calls procedure Q and a new stack frame has been created.

You are given the following information:

1. Q has two arguments:
   a. Argument 1 of type Integer
   b. Argument 2 of type Character
2. The stack frame for P begins at memory address 0x200.
3. The memory address of Argument 1 is 0x100

Questions:

1. Draw a stack frame structure to show the caller frame P and the called frame Q. Draw the following in this frame structure:
   a. The "top" and "bottom" of procedure P's stack
   b. The location and memory address of Arguments 1 & 2.
   c. The first value stored in the new stack frame (In hex). What does this value represent?
   d. The value in %ebp after Q's stack is created
2. Which register stores Q's frame pointer after the stack frame for Q is created?
3. What is the value stored in this register before the stack for Q was created?

Computer Engineering, Engineering

  • Category:- Computer Engineering
  • Reference No.:- M91579616
  • Price:- $120

Guranteed 48 Hours Delivery, In Price:- $120

Have any Question?


Related Questions in Computer Engineering

Does bmw have a guided missile corporate culture and

Does BMW have a guided missile corporate culture, and incubator corporate culture, a family corporate culture, or an Eiffel tower corporate culture?

Rebecca borrows 10000 at 18 compounded annually she pays

Rebecca borrows $10,000 at 18% compounded annually. She pays off the loan over a 5-year period with annual payments, starting at year 1. Each successive payment is $700 greater than the previous payment. (a) How much was ...

Jeff decides to start saving some money from this upcoming

Jeff decides to start saving some money from this upcoming month onwards. He decides to save only $500 at first, but each month he will increase the amount invested by $100. He will do it for 60 months (including the fir ...

Suppose you make 30 annual investments in a fund that pays

Suppose you make 30 annual investments in a fund that pays 6% compounded annually. If your first deposit is $7,500 and each successive deposit is 6% greater than the preceding deposit, how much will be in the fund immedi ...

Question -under what circumstances is it ethical if ever to

Question :- Under what circumstances is it ethical, if ever, to use consumer information in marketing research? Explain why you consider it ethical or unethical.

What are the differences between four types of economics

What are the differences between four types of economics evaluations and their differences with other two (budget impact analysis (BIA) and cost of illness (COI) studies)?

What type of economic system does norway have explain some

What type of economic system does Norway have? Explain some of the benefits of this system to the country and some of the drawbacks,

Among the who imf and wto which of these governmental

Among the WHO, IMF, and WTO, which of these governmental institutions do you feel has most profoundly shaped healthcare outcomes in low-income countries and why? Please support your reasons with examples and research/doc ...

A real estate developer will build two different types of

A real estate developer will build two different types of apartments in a residential area: one- bedroom apartments and two-bedroom apartments. In addition, the developer will build either a swimming pool or a tennis cou ...

Question what some of the reasons that evolutionary models

Question : What some of the reasons that evolutionary models are considered by many to be the best approach to software development. The response must be typed, single spaced, must be in times new roman font (size 12) an ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As