Ask Question, Ask an Expert

+61-413 786 465

info@mywordsolution.com

Ask Other Engineering Expert

1. A current radio advertisement states that the average American household has an average credit card debt of $25,000. Based on an APR (Annual Percentage Rate) of 18% (common for credit cards) and a minimum monthly payment of $200.00, how many years will it take to pay off this debt if no further purchases are made? How much interest would you pay?

2. You have just taken out a $220,000 loan for your house at an APR of 7.5% and a 30-year term. Payments are to be made monthly. Two years from now, you refinance at an APR of 5.5% and a 28-year term. What are your monthly payments for the new, 5.5% loan (to the nearest penny)? (Hint: The principle for the new loan is the payoff of the original loan.)

3. Given the following Present Value Plot for Projects A and B, which are mutually exclusive projects, answer the following questions:

1093_mutually exclusive projects.jpg

(i) What is the DCFROR for Project A? for Project A, Project B?

(ii) If your company has an average reinvestment opportunity rate of 30%, which project will you choose to do (Project A, Project B, or neither)? Why?

4. Production data has been fit to a Fetkovich type curve. Given the following information, answer the questions:

Date of first production plotted for the Fetkovich type curve match is 1/1/95.
Value for Di from Fetkovich type curve match is 0.35 per year.
Value for Qi from Fetkovich type curve match is 1,500 BOPD.
Cumulative production through 12/2001 is 250,000 BO.
Estimated value of "b" is 0.30 from the Fetkovich type curve.

  • If the economic limit is 20 BOPD, estimate the ERR.
  • When will the economic limit be reached
  • What is the EUR for this well?

5. The following NPV's have been calculated to determine if a compressor installation should be accelerated from Year 3 to Year 7. The compressor cost is $1,500,000.

568_compressor installation.jpg

a. Calculate the incremental NPV's for this project using the tabled data.

b. If capital is limited and your average reinvestment opportunity rate is 15%, what is your recommendation regarding acceleration of the project?

6. The figure below is historical production data from the Kuparuk River field. The OOIP is 5,332,979 Mstb and cumulative recovery through 12/31/2004 is 1,971,200,654 stb.

A. Estimate the decline parameters, b, qi, and D.

B. If the field economic rate is 25,000 stb/day, determine

(i) the time to reach the economic limit

(ii) the ERR

(iii) the EUR

(iii) the recovery factor at the economic limit

208_field economic rate.jpg

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M91529403
  • Price:- $90

Priced at Now at $90, Verified Solution

Have any Question?


Related Questions in Other Engineering

Engineering analysis homework -for every problem provide

Engineering Analysis Homework - For every problem, provide The MATLAB script/function files that solve the problems. Problem 1: Write a script that solves the problem. For (c), show results of the evaluation of every ind ...

A detailed review of spatial modulation and simulation

A Detailed Review of Spatial Modulation and Simulation Learning Outcomes a. Learn how to model mobile communication channels d. Discern knowledge development and directions on the recent advances in 4G to the research pr ...

Introduction to engineering design assignment -

Introduction to Engineering Design Assignment - Drafting Question 1 - Field notes and traverse drawing may be an outdated form of keeping and presenting information on the position of features on a site. Modern electroni ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

Task 1using the lab kit design a circuit for the processor

Task 1: Using the lab kit, design a circuit for the processor to control the output of a connected 7-segment LED display device. You will be provided with a standard common anode 7-segment display of the type FND-507 (or ...

Select a risk problem from the list below and prepare a

Select a risk problem from the list below and prepare a risk management plan in accordance with AS/NZS ISO 31000:2009. Please ensure that: - Establish the context clearly, in accordance with the Standard; - Define your s ...

Load fault level analysis amp protection design of a remote

LOAD, FAULT LEVEL ANALYSIS & PROTECTION DESIGN OF A REMOTE AREA MICROGRID Assignment Please undertake the following analyses: 1. Calculate the 3-phase fault levels on Bus 2, Bus 3 and Bus 4 with the main supply connected ...

Operations engineering assignment -please select only one

Operations Engineering Assignment - Please select only one of the following case studies for your assignment: CASE A. Tesla Motors Tesla is an innovative manufacturer that designs, assemble and sells fully electric vehic ...

Conceptual design of forced-free-mixed convection

Conceptual Design of Forced-Free-Mixed Convection Experiment This assessment is to be completed individually. 1. Learning Outcomes: - Develop a basic ability to conceptually design an experimental apparatus - Use theory ...

Assignment 11 what is the purpose of ore reserve and

ASSIGNMENT 1 1. What is the purpose of ore reserve and resource estimation? Why are resource and reserve estimates important to the mining industry? 2. What is meant by ore? What is meant by the term waste? How is the di ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As