Ask Other Engineering Expert

11.Answer the following:

a. Define stripping ratio and give three examples of the units it may be expressed in.

b. Define maximum stripping ratio.

c. Draw a section through an open pit showing the following:

i. Pit slope

ii. Bench slope

 iii. Bench crest

 iv. Pit floor

v. Bench toe

vi. Bench width

 

12.Draw a plan and cross-section of a dragline casting overburden from a new strip to an old strip in a coal mining stripping situation for a single seam and for a two seam operation.

13.Draw sketches to explain:

a. Declining stripping ratio

 b. Increasing stripping ratio

 c. Constant stripping ratio

14.The total cost of ore mining at an open pit is $ 2.60 per tonne and that for waste is $ 1.90 per tonne. If the value of the ore is $ 14.90 per tonne and the company requires a 20% profit margin, what is the maximum stripping ratio?

15.What are the advantages and disadvantages of wheeled loaders? 16.What are the advantages of trolley assist for a truck haulage system?

17.What are the advantages and disadvantages of open pit mining?

18.What are the advantages and disadvantages of open cast mining?

19.Answer the following:

i.  In general, a road consists of several layers. Draw and label different layers and discuss their functionality.

ii.      How is the load from the tyres distributed in the different layers of a road foundation? Discuss.

iii.     Draw a typical stress envelope for dual rear wheel tyres for a truck.

iv.     Point out, on the drawing, the most affected area on the sub-grade.

20.Dragline Output

i.          A dragline with a 1½ cu yd bucket working in wet, sticky clay, with a swell factor of 20%, handles an average loose volume of 1.8 cu yd. It can complete 3 cycles per 2 minutes. Calculate ideal output, based on digging at optimum depth with a 90°angle of swing, and no delays.

ii.   Using the tables provided, calculate the probable output if the angle

of swing is actually 120°and the depth of cut is 10ft.

 

Table 5.2: Ideal Output of Short-boom Draglines in Cubic Yards per Hour Bank Measure

Class of material

 

Size of bucket (cu yd)

 

3/8

 

1/2

 

3/4

 

1

 

 

 

 

2

 

 

Moist loam or light sandy clay

 

5.0

 

5.5

 

6.0

 

6.6

 

7.0

 

7.4

 

7.7

 

8.0

 

8.5

 

 

70

 

95

 

130

 

160

 

195

 

220

 

245

 

265

 

305

 

Sand and gravel

 

5.0

 

5.5

 

6.0

 

6.6

 

7.0

 

7.4

 

7.7

 

8.0

 

8.5

 

 

65

 

90

 

125

 

155

 

185

 

210

 

235

 

255

 

295

 

Good common earth

 

6.0

 

6.7

 

7.4

 

8.0

 

8.5

 

9.0

 

9.5

 

9.9

 

10.5

 

 

 

 

55

 

75

 

105

 

135

 

165

 

190

 

210

 

230

 

265

 

Hard ,tough clay

 

7.3

 

8.0

 

8.7

 

9.3

 

10.0

 

10.7

 

11.3

 

11.8

 

12.3

 

 

35

 

55

 

90

 

110

 

135

 

160

 

150

 

195

 

230

 

Wet, sticky clay

 

7.3

 

8.0

 

8.7

 

9.3

 

10.0

 

10.7

 

11.3

 

11.8

 

12.3

 

 

20

 

30

 

55

 

75

 

95

 

110

 

130

 

145

 

175

 

 

 

Table 5.3:The Effect of the Depth of Cut and Angle of Swing on the Output of Draglines

Per cent of optimum depth

 

Angle of swing (deg.)

 

30

 

45

 

60

 

75

 

90

 

120

 

150

 

180

 

20

 

1.06

 

0.99

 

0.94

 

0.90

 

0.87

 

0.81

 

0.75

 

0.70

 

40

 

1.17

 

1.08

 

1.02

 

0.97

 

0.93

 

0.85

 

0.78

 

0.72

 

60

 

1.24

 

1.13

 

1.06

 

1.01

 

0.97

 

0.88

 

0.80

 

0.74

 

80

 

1.29

 

1.17

 

1.09

 

1.04

 

0.99

 

0.90

 

0.82

 

0.76

 

100

 

1.32

 

1.19

 

1.11

 

1.05

 

1.00

 

0.91

 

0.83

 

0.77

 

120

 

1.29

 

1.17

 

1.09

 

1.03

 

0.985

 

0.90

 

0.82

 

0.76

 

140

 

1.25

 

1.14

 

1.06

 

1.00

 

0.96

 

0.88

 

0.81

 

0.75

 

160

 

1.20

 

1.10

 

1.02

 

0.97

 

0.93

 

0.85

 

0.79

 

0.73

 

180

 

1.15

 

1.05

 

0.98

 

0.94

 

0.90

 

0.82

 

0.76

 

0.71

 

200

 

1.10

 

1.00

 

0.94

 

0.90

 

0.87

 

0.79

 

0.73

 

0.69

 

 

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M91312107
  • Price:- $60

Priced at Now at $60, Verified Solution

Have any Question?


Related Questions in Other Engineering

Register design a cpu register is simply a row of

Register design A CPU register is simply a row of flip-flops (i.e. SR, JK, T, etc) put side by side in an array to make the size of register required. For example, an 8 bit register has 8 flip-flops side by side for stor ...

A detailed review of spatial modulation and simulation

A Detailed Review of Spatial Modulation and Simulation Learning Outcomes a. Learn how to model mobile communication channels d. Discern knowledge development and directions on the recent advances in 4G to the research pr ...

Mine safety amp environmental engineering assignment -part

Mine Safety & Environmental Engineering Assignment - Part 1 - Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the fo ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

Learning outcomes evaluate multiuser communication and

Learning Outcomes Evaluate multiuser communication and resource sharing techniques; Apply the techniques of, and report on, digital communication applications using Matlab and hardware devices. Assignment Description The ...

Operations engineering assignment -please select only one

Operations Engineering Assignment - Please select only one of the following case studies for your assignment: CASE A. Tesla Motors Tesla is an innovative manufacturer that designs, assemble and sells fully electric vehic ...

Select a risk problem from the list below and prepare a

Select a risk problem from the list below and prepare a risk management plan in accordance with AS/NZS ISO 31000:2009. Please ensure that: - Establish the context clearly, in accordance with the Standard; - Define your s ...

Engineering materials term paper assignment -conduct a

ENGINEERING MATERIALS TERM PAPER ASSIGNMENT - Conduct a thorough literature search and write a 15-20 page technical review paper on the evolution of the engineering materials used in the manufacturing of any one of the f ...

Task 1using the lab kit design a circuit for the processor

Task 1: Using the lab kit, design a circuit for the processor to control the output of a connected 7-segment LED display device. You will be provided with a standard common anode 7-segment display of the type FND-507 (or ...

Control theory - lab reportsfor experiments 1 to 4 you must

Control Theory - Lab Reports For experiments 1 to 4 you must undertake the following: a) At the start of each section (including the pre-lab activities) there are a number learning outcomes. That is, what students should ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As