Ask Engineering Mathematics Expert

1. Write the math program for the following bids in the lane procurement auction. Clearly define the variables, constraint and objective function

LANES   SUPPLIER I          SUPPLIER II         NUMBER OF TRUCKLOAD

X -> Y     570                         525                         10

Y -> Z     621                         610                         10

X -> Z     475                         500                         10

Include the additional constraints:

1) A minimum of 20% of volume for both the suppliers

2) The following capacity constraints:

LANES           SUPPLIER I          SUPPLIER II        

X -> Y             2                              100                        

Y -> Z             100                         4                             

X -> Z             100                         2

3) Each supplier should get atleast 25% of the business (dollar value)

Solve the three model including the three constraints. Write the math program along with the constraints. Attach the Excel output and the answers (best value for variables and total cost).

2. Which of the following lanes can be combined in a combinatorial auction? Why?
X -> Y
Y -> Z
X -> Z

3. Who should win the bids for the following lanes in a combinatorial auction? Why? Which will be the winning bids?

LANES

__________________________________________________

X -> Y                               1                                              1            1

Y -> Z                                                1                              1

Y -> X                                                                1                           1

_________________________________________________

BID SUPPLIER I                  280         276         350         412         508

BID SUPPLIER II                 255         301         327         401         525

1. Find the approximate minimum cost flow for the following network using the math program discussed in class.

1315_Figure1.jpg

The distribution cost per ton for the arcs are as follows

1-4  = $ 280          1-5 = $ 325           4-6 = $ 75             4-7 = $ 220

2-4 = $ 175           2-5 = $ 175           5-6 = $ 150           5-7 = $ 100

3-4 = $ 250           3-5 = $ 225

The capacity of the warehouses are 400 units.

The minimum cost flow from suppliers to customers must use the warehouses. Hence ignore all the direct arcs from suppliers to customers. The supplier capacity and customer demands are listed in the figure.

Write the math program along with the constraints. Attach the Excel output and the answers (best value for variables and total cost).

Engineering Mathematics, Engineering

  • Category:- Engineering Mathematics
  • Reference No.:- M92070952

Have any Question?


Related Questions in Engineering Mathematics

Q undirected vs directed connectivitya prove that in any

Q: Undirected vs. directed connectivity. (a) Prove that in any connected undirected graph G = (V, E) there is a vertex v ? V whose removal leaves G connected. (Hint: Consider the DFS search tree for G.) (b) Give an examp ...

All these questions should be answered in matlab 1 generate

All these questions should be answered in MATLAB !!! 1. Generate a set of 3 random patterns of dimension 12 where each value is +1 or -1.(3 random 12*12 matrix) 2. Create a 12-unit Hopfield network (a 12x12 matrix) from ...

I have these questions for a homework assignment and have

I have these questions for a homework assignment and have to show work. This works with MIPS coding language and is the class Introduction to Computer Architecture. 1. Find the 2's complement representation (in 32-bit he ...

Question 1 - many spas many componentsconsider 4 types of

Question 1 - Many spas, many components Consider 4 types of spa tub: Aqua-Spa (or FirstSpa, or P1), Hydro-Lux (or SecondSpa, or P2), ThirdSpa (or P3) and FourthSpa (or P4), with the production of products P1, ..., P4 in ...

Analytical methods for engineers assignment - calculusthis

ANALYTICAL METHODS FOR ENGINEERS ASSIGNMENT - CALCULUS This assignment assesses Outcome - Analyse and model engineering situations and solve problems using calculus. Questions - Q1. Differentiate the following functions ...

Clculus assignment -q1 find the total differential of w

CALCULUS ASSIGNMENT - Q1. Find the total differential of w = x 3 yz + xy + z + 3 at (x, y, z) = (1, 2, 3). Q2. Find the value of the double integral ∫∫ R (6x + 2y 2 )dA where R = {(x, y)| - 2 ≤ y ≤ 1, y 2 ≤ x ≤ 2 - y. Q3 ...

Numerical analysis assignment -q1 define the following

Numerical Analysis Assignment - Q1. Define the following terms: (i) Truncation error (ii) Round-off error Q2. Show that if f(x) = logx, then the condition number, c(x) = |1/logx|. Hence show that log x is ill-conditioned ...

Question what is the signed binary sum of 1011100 and

Question : What is the signed binary sum of 1011100 and 1110101 in decimal? Show all of your work. What is the hexadecimal sum of 9A88 and 4AF6 in hexadecimal and decimal? Show all of your work.

Question a signal starts at point x as it travels to point

Question : A signal starts at point X. As it travels to point Y, it loses 8 dB. At point Y, the signal is boosted by 10 bB. As the signal travels to point Z, it loses 7 dB. The dB strength of the signal at point Z is -5 ...

Show all your work not just the answerswhen you multiply 21

(SHOW ALL YOUR WORK, not just the answers) When you multiply: 21 x 68 you most likely do: 8x1 + 8x20 + 60x1 + 60x20 = 1, 428 So, there are 4 multiplications and then 3 additions. How long would it take a computer to do t ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As