1. When it was originally developed, PERT used certain (deterministic) methods to estimate activity duration.

2. AON and AOA networks can both be used to depict any project network.

3. The shortest time to complete a network is equal to the duration of the longest path through the network.

4. Critical path tasks always have zero slack.

5. To manage a project successfully, the project manager need only pay close attention to tasks on the critical path.

6. "Merger" is a term used to describe the situation in which two or more paths in a network join together.

7. If task duration estimates are carefully made, the project manager needs to only examine the critical path when conducting a risk analysis.

8. The actual project duration will be known with certainty after the project is completed.

9. Milestones cannot be identified on a Gantt Chart.

10. It is easiest to see lead and lag time in a project task on a PERT/CPM networks.

11. A start-to-finish linkage is the most common way of linking to successive task.

12. The formula for the expected time of an activity in a network assumes that the optimistic, pessimistic, and most likely time estimates have a Beta distribution.

13. A project schedule is a project action plan converted into a timetable.

14. A Gantt chart can NOT depict a critical path, only a PERT/CPM chart can.

15. The difference between the LST and EST is called slack.

16. A disadvantage of Gantt charts is that they are hard to draw.

17. The difference between LST and LFT is called slack.

18. Standard Pert/CPM networks can be use to resolve probabilistic concerns

19. Technical dependencies are often harder to see on a Gantt chart than on a PERT/CPM network.

20. The difference between EST and LFT is called slack.

21. The difference between LFT and EFT is called slack.

22. A big advantage of AON networks is that they are easier to draw.

 

23. The tasks of project planning, project budgeting, and project scheduling are largely separable from one another.

24. An event is a series of connected activities.

25. A disadvantage of using beta distribution to approximate activity times is that it is generally less flexible than the normal distribution.

26. The simulation approach is generally preferred over the statistical method.

27. Technical dependencies are generally easier to see on a Gantt chart than on PERT/CPM networks.

28. The start-to-finish linkage is used in situations where is it desirable for two or more activities to finish at the same time.

29. Milestones are not depended upon the predecessor activities in the project plan.

30. Another name for total slack is free slack.

31. What is it a milestone?

32. What is project slack?

33. For which purpose is simulation NOT used with regard to project scheduling?

34. Technical dependencies on a project plan are easiest to see on a:

35. PERT was originally used for what type of project?

36. Which of the following is NOT an element of the Gantt chart?

37. Which of the following is typically used as the best estimate of task duration?

38. Which of the following terms is most closely associated with a task required by the project?

39. What is the expected time to complete a task with an optimistic, most likely, and pessimistic times of 3, 4, and 7 days respectively?

40. What is the standard deviation of a task with optimistic, most likely, and pessimistic times of 3, 4, and 7 days respectively assuming the estimates were made at the 99% plus level?

41. The amount of time a noncritical task can be delayed without delaying the project is called?

42. Slack is calculated as?

43. Which of the following linkages is used to start two or more activities at the same time?

44. A Term NOT used in the discussion of PERT/CPM analysis is

45. An identifiable state resulting from the completion of one or more activities is called?

46. Define the term Critical Path.

47. What is activity slack?

48. What is a Gantt chart?

49. What are the four methods of linking steps in a project using precedence diagramming?

50. Contrast "total slack" and "free slack"

51. Contrast the traditional statistical approach to calculating the probability of completing a project by a specified time with the simulation approach.

52. Why should we only draw the Gantt chart after we have draw the network for the project?

53. What assumptions are made about the probabilities of the optimistic and pessimistic times in the standard formula for calculating the variance of a particular activity? Explain how the formula can be modified to accommodate different assumptions.

54. Explain why the term "critical path" has less meaning in cases where the activity times are not known with certainty.

55. What is a merger and what problems do mergers create?

Why is it necessary for the PM to be aware and to manage the slack in the project?

Computer Engineering, Engineering

  • Category:- Computer Engineering
  • Reference No.:- M91622173
  • Price:- $20

Priced at Now at $20, Verified Solution

Have any Question?


Related Questions in Computer Engineering

Does bmw have a guided missile corporate culture and

Does BMW have a guided missile corporate culture, and incubator corporate culture, a family corporate culture, or an Eiffel tower corporate culture?

Rebecca borrows 10000 at 18 compounded annually she pays

Rebecca borrows $10,000 at 18% compounded annually. She pays off the loan over a 5-year period with annual payments, starting at year 1. Each successive payment is $700 greater than the previous payment. (a) How much was ...

Jeff decides to start saving some money from this upcoming

Jeff decides to start saving some money from this upcoming month onwards. He decides to save only $500 at first, but each month he will increase the amount invested by $100. He will do it for 60 months (including the fir ...

Suppose you make 30 annual investments in a fund that pays

Suppose you make 30 annual investments in a fund that pays 6% compounded annually. If your first deposit is $7,500 and each successive deposit is 6% greater than the preceding deposit, how much will be in the fund immedi ...

Question -under what circumstances is it ethical if ever to

Question :- Under what circumstances is it ethical, if ever, to use consumer information in marketing research? Explain why you consider it ethical or unethical.

What are the differences between four types of economics

What are the differences between four types of economics evaluations and their differences with other two (budget impact analysis (BIA) and cost of illness (COI) studies)?

What type of economic system does norway have explain some

What type of economic system does Norway have? Explain some of the benefits of this system to the country and some of the drawbacks,

Among the who imf and wto which of these governmental

Among the WHO, IMF, and WTO, which of these governmental institutions do you feel has most profoundly shaped healthcare outcomes in low-income countries and why? Please support your reasons with examples and research/doc ...

A real estate developer will build two different types of

A real estate developer will build two different types of apartments in a residential area: one- bedroom apartments and two-bedroom apartments. In addition, the developer will build either a swimming pool or a tennis cou ...

Question what some of the reasons that evolutionary models

Question : What some of the reasons that evolutionary models are considered by many to be the best approach to software development. The response must be typed, single spaced, must be in times new roman font (size 12) an ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As