Ask Engineering Mathematics Expert

1. The Lakeside Boatworks is planning to manafacture three types of molded fiber glass recreational boats-a fishing (bass) boat, a ski boat, and a small speedboat. The estimated selling price and variable cost for each type of boat are summarized in the following table.

Boat Variable Cost Selling Price
Bass $ 12,500 $23,000
Ski $ 8,500 $18,000
Speed $ 13,700 $26,000

The company has incurred fixed costs of $2,800,000 to set up its manufacturing operation and begin production. Lakeside has also entered into agreement with several boat dealers in the region to provide a minimum of 70 bass boats, 50 ski boats, and 50 speed boats. Alternatively, the company is unsure of what actual demand will be, so it has decided to limit production to no more than 120 of any one boat. The company wants to determine the number of boats that it must sell to break even while minimizing its total variable cost.

A. Formulate a linear programming model for this problem.

B. Solve the model using the computer.

2. The Mill Mountain Coffee Shop blends coffee on the premises for its customers. It sells three basic blends in 1-pound bags, Special Mountain Dark, and Mill Regular. It uses four different types of coffee to produce the blends - Brazilian, mocha, Columbian, and mild. The shop used the following blend recipe requirements.

Blend Mix Requirements Selling Price/lb($)
Special At least 40% Columbian, at least 30% mocha 6.50
Dark At least 60% Brazilian, no more than 10% mild 5.25
Regular No more than 60% mild, at least 30% Brazilian 3.75

The cost of Brazilian coffee is $2.00 per, the pound, the cost of mocha is $2.75 per pound, the cost of Columbian is $2.90 per pound, and the cost of mild is $1.70 per pound. The shop has 110 pounds of Brazilian coffee, 70 pounds of mocha, 80 pounds of Columbian, and 150 pounds of mild coffee available per week. The shop wants to know the amount of each blend it should prepare each week to maximize profit.

A. Formulate a Linear programming model for this problem.

B. Solve this model using the computer.

3. Joe Henderson runs a small metal part shop. The shop contains three machines- a drill press, a lathe, and a grinder. Joe has three operators, each certified to work on all three machines. However each operator performs better on some machines than on other. The shop has contracted to do a big job that requires all three machines. The times required by the various operators to perform the required operations on each machine are summarized as follows.

Operator Drill Press (min) Lathe (min) Grinder (min)
1 22 18 35
2 41 30 28
3 25 36 18

Joe Henderson wants to assign one operator to each machine so that the total operating time for all three operators in minimized.

A. Formulate a linear programming model for this problem

B. Solve the model using the computer

C. Joe's brother, Fred, has asked him to hire his wife, Kelly, who is a machine operator. Kelly can perform each of the three required machine operations in 20 minutes. Should Joe hire his sister-in-law?

Engineering Mathematics, Engineering

  • Category:- Engineering Mathematics
  • Reference No.:- M91630819
  • Price:- $30

Priced at Now at $30, Verified Solution

Have any Question?


Related Questions in Engineering Mathematics

Q undirected vs directed connectivitya prove that in any

Q: Undirected vs. directed connectivity. (a) Prove that in any connected undirected graph G = (V, E) there is a vertex v ? V whose removal leaves G connected. (Hint: Consider the DFS search tree for G.) (b) Give an examp ...

All these questions should be answered in matlab 1 generate

All these questions should be answered in MATLAB !!! 1. Generate a set of 3 random patterns of dimension 12 where each value is +1 or -1.(3 random 12*12 matrix) 2. Create a 12-unit Hopfield network (a 12x12 matrix) from ...

I have these questions for a homework assignment and have

I have these questions for a homework assignment and have to show work. This works with MIPS coding language and is the class Introduction to Computer Architecture. 1. Find the 2's complement representation (in 32-bit he ...

Question 1 - many spas many componentsconsider 4 types of

Question 1 - Many spas, many components Consider 4 types of spa tub: Aqua-Spa (or FirstSpa, or P1), Hydro-Lux (or SecondSpa, or P2), ThirdSpa (or P3) and FourthSpa (or P4), with the production of products P1, ..., P4 in ...

Analytical methods for engineers assignment - calculusthis

ANALYTICAL METHODS FOR ENGINEERS ASSIGNMENT - CALCULUS This assignment assesses Outcome - Analyse and model engineering situations and solve problems using calculus. Questions - Q1. Differentiate the following functions ...

Clculus assignment -q1 find the total differential of w

CALCULUS ASSIGNMENT - Q1. Find the total differential of w = x 3 yz + xy + z + 3 at (x, y, z) = (1, 2, 3). Q2. Find the value of the double integral ∫∫ R (6x + 2y 2 )dA where R = {(x, y)| - 2 ≤ y ≤ 1, y 2 ≤ x ≤ 2 - y. Q3 ...

Numerical analysis assignment -q1 define the following

Numerical Analysis Assignment - Q1. Define the following terms: (i) Truncation error (ii) Round-off error Q2. Show that if f(x) = logx, then the condition number, c(x) = |1/logx|. Hence show that log x is ill-conditioned ...

Question what is the signed binary sum of 1011100 and

Question : What is the signed binary sum of 1011100 and 1110101 in decimal? Show all of your work. What is the hexadecimal sum of 9A88 and 4AF6 in hexadecimal and decimal? Show all of your work.

Question a signal starts at point x as it travels to point

Question : A signal starts at point X. As it travels to point Y, it loses 8 dB. At point Y, the signal is boosted by 10 bB. As the signal travels to point Z, it loses 7 dB. The dB strength of the signal at point Z is -5 ...

Show all your work not just the answerswhen you multiply 21

(SHOW ALL YOUR WORK, not just the answers) When you multiply: 21 x 68 you most likely do: 8x1 + 8x20 + 60x1 + 60x20 = 1, 428 So, there are 4 multiplications and then 3 additions. How long would it take a computer to do t ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As