Ask Other Engineering Expert

1. Estimate the cycle time and production of a Caterpillar 777D flat floor off highway truck operating on a level haul road of 4000m length. The road is a rutted dirt roadway with no maintenance and no stabilisation, tyre penetration is 2.5 cm. The following can be assumed;
- Loading time 1.4 min
- Manoeuvre and dump time 0.8 min
- Truck hauls 80 tonnes of ore each trip
- Job efficiency of 0.8

2009_Figure.jpg

715_Figure1.jpg

534_Figure2.jpg

2. For the situation in question 1, determine the cycle time if road conditions were improved to a rolling resistance of 20 kg/tonne.

3. For the problem in question 1 and 2 the engineer at the site is considering the use of a shorter, 2,200m, haul road that has a slope of 6% adverse. If all other factors remain the same which haul route should be selected on the basis of shortest cycle times? What are the cycle times and hourly productions?

4. An off highway truck weighs 23 t empty and carts a payload of 35 t up a 4% grade. The RR factor is 40 kg/tonne. Calculate:
a) The total resistance (kg)
b) The effective grade (%)

5. A rubber tyred scraper unit weighing 50 t is towed by a crawler tractor weighing 40t up a 6% grade. The RR factor is 40kg/t. Calculate:
a) The rolling resistance (kg)
b) The grade resistance (kg)
c) The total resistance (kg)

6. A Caterpillar D3OD articulated dump truck has the rim pull curve in the figure below. (Gross weight 21.9 t empty, 49.117 t loaded). If the truck ascends a 5% grade with a rolling resistance of 40kg/t, find the following:
a) Total resistance (kg)
b) The required rim pull (kg) when loaded
c) The maximum speed of the truck when loaded (km/h)

108_Figure3.jpg

7. The average speed of an 18m3 scraper is 37 km/hr and its return speed uphill is 16 km/hr over a 1000 m haul distance and a 1000m return distance. Using a fixed time of 4 minutes, calculate the cycle time (min).

8. What are the advantages and disadvantages of in-pit crushing

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M92074206
  • Price:- $50

Priced at Now at $50, Verified Solution

Have any Question?


Related Questions in Other Engineering

Register design a cpu register is simply a row of

Register design A CPU register is simply a row of flip-flops (i.e. SR, JK, T, etc) put side by side in an array to make the size of register required. For example, an 8 bit register has 8 flip-flops side by side for stor ...

A detailed review of spatial modulation and simulation

A Detailed Review of Spatial Modulation and Simulation Learning Outcomes a. Learn how to model mobile communication channels d. Discern knowledge development and directions on the recent advances in 4G to the research pr ...

Mine safety amp environmental engineering assignment -part

Mine Safety & Environmental Engineering Assignment - Part 1 - Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the fo ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

Learning outcomes evaluate multiuser communication and

Learning Outcomes Evaluate multiuser communication and resource sharing techniques; Apply the techniques of, and report on, digital communication applications using Matlab and hardware devices. Assignment Description The ...

Operations engineering assignment -please select only one

Operations Engineering Assignment - Please select only one of the following case studies for your assignment: CASE A. Tesla Motors Tesla is an innovative manufacturer that designs, assemble and sells fully electric vehic ...

Select a risk problem from the list below and prepare a

Select a risk problem from the list below and prepare a risk management plan in accordance with AS/NZS ISO 31000:2009. Please ensure that: - Establish the context clearly, in accordance with the Standard; - Define your s ...

Engineering materials term paper assignment -conduct a

ENGINEERING MATERIALS TERM PAPER ASSIGNMENT - Conduct a thorough literature search and write a 15-20 page technical review paper on the evolution of the engineering materials used in the manufacturing of any one of the f ...

Task 1using the lab kit design a circuit for the processor

Task 1: Using the lab kit, design a circuit for the processor to control the output of a connected 7-segment LED display device. You will be provided with a standard common anode 7-segment display of the type FND-507 (or ...

Control theory - lab reportsfor experiments 1 to 4 you must

Control Theory - Lab Reports For experiments 1 to 4 you must undertake the following: a) At the start of each section (including the pre-lab activities) there are a number learning outcomes. That is, what students should ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As