1. Consider the following linear program.

Max 7x1 + 5x2

Subject to

3x1 + 4x2 ≤ 240

2x1 + x2 ≤ 100

x1 ≤ 45

x2 ≥ 10

x1, x2 ≥ 0

1.a) Write Dual problem.

1. b) The following is the solution for the primal problem.

(x1, x2, s1, s2, s3, s4) = (32, 36, 0, 0, 13, 26), the objective value, z = 404.

Based on this information, solve the dual problem and find the dual prices.

2. A company produces three products (x1, x2, x3) using three materials (A, B and C). The following shows the LP model and its solution. Show all your works how you get the solution for the following questions.

Max 7x1 + 5x2 + 3x3

Subject to
x1 + x2 + 2x3 ≤ 200 //material A

15x1 + 6x2 - 5x3 ≤ 500 //material B

x1 + 3x2 + 5x3 ≤ 300 //material C

x1, x2, x3 ≥ 0

Lindo Output)

LP OPTIMUM FOUND AT STEP 1

OBJECTIVE FUNCTION VALUE: 500.0000

VARIABLE

VALUE

REDUCED COST

X1

50.000000

0.000000

X2

0.000000

0.400000

X3

50.000000

0.000000

ROW SLACK OR SURPLUS DUAL PRICES 
2) 50 0
3) 0 0.4
4) 0 1

NO. ITERATIONS= 1

RANGES IN WHICH THE BASIS IS UNCHANGED:

VARIABLE

 

CURRENT

OBJ COEFFICIENT RANGES ALLOWABLE

 

ALLOWABLE

 

X1

COEF 7.000000

INCREASE INFINITY

DECREASE 0.711111

X2

5.000000

0.400000

INFINITY

X3

3.000000

32.000000

0.820513

 

ROW

 

CURRENT

RIGHTHAND SIDE RANGES ALLOWABLE

 

ALLOWABLE

 

2

RHS 200.000000

INCREASE INFINITY

DECREASE 50.000000

3

500.000000

1333.333252

800.000000

4

300.000000

114.285713

266.666656

2. a) Write Dual problem.

2. b) Calculate the marginal cost and the marginal revenue for the product x2. Hint) Use the coefficients of x2 in constraints and dual prices.

2. c) For the objective coefficient for x3, find ranges in which the basic variables are unchanged.

2. d) For the RHS value of material C, find ranges in which the basic variables are unchanged.

2. e) The material C is currently 300 units available. Some supplier wants to sell the material C with $2 / unit. What do you want to do? Why? (answer with the given output)

3. Truck Loading Problem

Mr. Steven Goodman owned Goodman Shipping Company in Orlando, FL. One of his trucks, with a weight capacity of 15,000 pounds and a volume capacity of 1,300 cubic feet, is about to be loaded. Awaiting shipment are the items shown in the following table. Each of these six items has an associated dollar value, available weight, and volume per pound that the item occupies.

Item

Value per Pound

Available Weight (Pounds)

Volume (Cu. Ft. per Pound)

1

$3.10

5000

0.125

2

$3.20

4500

0.064

3

$3.45

3000

0.144

4

$4.15

3500

0.448

5

$3.25

4000

0.048

6

$2.75

3500

0.018

The objective is to maximize the total value of the items loaded onto the truck without exceeding the truck's weight and volume capacities.

3. a) Formulate this problem as a linear program.

3. b) Solve this problem using LINDO or EXCEL Solver and explain your decision. Attach the output.

Hint: The decision variables are the number of pounds of each item that should be loaded on the truck. Define the decision variables first then write objective function and constraints.

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M91565279
  • Price:- $50

Priced at Now at $50, Verified Solution

Have any Question?


Related Questions in Other Engineering

Register design a cpu register is simply a row of

Register design A CPU register is simply a row of flip-flops (i.e. SR, JK, T, etc) put side by side in an array to make the size of register required. For example, an 8 bit register has 8 flip-flops side by side for stor ...

A detailed review of spatial modulation and simulation

A Detailed Review of Spatial Modulation and Simulation Learning Outcomes a. Learn how to model mobile communication channels d. Discern knowledge development and directions on the recent advances in 4G to the research pr ...

Mine safety amp environmental engineering assignment -part

Mine Safety & Environmental Engineering Assignment - Part 1 - Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the fo ...

Projectflow processing of liquor in a mineral refining

Project Flow Processing of Liquor in a Mineral Refining Plant The aim of this project is to design a flow processing system of liquor (slurry) in a mineral (aluminum) refining plant. Aluminum is manufactured in two phase ...

Learning outcomes evaluate multiuser communication and

Learning Outcomes Evaluate multiuser communication and resource sharing techniques; Apply the techniques of, and report on, digital communication applications using Matlab and hardware devices. Assignment Description The ...

Operations engineering assignment -please select only one

Operations Engineering Assignment - Please select only one of the following case studies for your assignment: CASE A. Tesla Motors Tesla is an innovative manufacturer that designs, assemble and sells fully electric vehic ...

Select a risk problem from the list below and prepare a

Select a risk problem from the list below and prepare a risk management plan in accordance with AS/NZS ISO 31000:2009. Please ensure that: - Establish the context clearly, in accordance with the Standard; - Define your s ...

Engineering materials term paper assignment -conduct a

ENGINEERING MATERIALS TERM PAPER ASSIGNMENT - Conduct a thorough literature search and write a 15-20 page technical review paper on the evolution of the engineering materials used in the manufacturing of any one of the f ...

Task 1using the lab kit design a circuit for the processor

Task 1: Using the lab kit, design a circuit for the processor to control the output of a connected 7-segment LED display device. You will be provided with a standard common anode 7-segment display of the type FND-507 (or ...

Control theory - lab reportsfor experiments 1 to 4 you must

Control Theory - Lab Reports For experiments 1 to 4 you must undertake the following: a) At the start of each section (including the pre-lab activities) there are a number learning outcomes. That is, what students should ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As