Ask Engineering Mathematics Expert

1. (a) Briefly describe the important parts of each step needed to make a decision using decision sciences models.

(b) What are the different methods to solve a system of linear equations? Briefly describe the steps needed in each method.

(c) What is an unbounded linear programming problem? How do we find if a given linear programming problem has unbounded optimal solution? Give a real world example of a linear programming problem where unbounded optimal solution may occur.

(d) Describe the important aspects of, and give a real world example for, the deterministic models.  Describe the important aspects of, and give a real world example for, the stochastic models. What are the differences between the deterministic models and the stochastic models?

2. Given the following linear programming problem

Maximize 40x + 30y

Subject to

      x + y < 80

    3x + 2y < 180

    2x + y > 20

         x, y > 0

(a)  Graph the constraints.

(b)  Find the coordinates of each corner point of the feasible region

(c)  Determine the optimal solution.

3. Given that the optimal solution of the following linear programming problem is x = 15 and y = 10, state the problem in standard form and do a constraint analysis for the optimal solution.

Maximize   10x + 8y

Subject to

      2x + 3y ≤ 60

      6x + 5y ≥ 100

                x ≤ 15

                y ≤ 12

            x, y > 0

4. A company produces two products, A and B, which have profits of $80 and $70, respectively. Each unit of product must be processed on three assembly lines, where the required production times are as follows:

 

 

Hours/Unit

 

 

Line  1

        Line 2

     Line 3

Product A

11

4

       6

Product B

         5

          8.5

       4.8

Total Hours Available

     600

400

       380

The company wants to produce at least 30 units of product A and at least 30 units of Product B.

Formulate a linear programming model for the above situation by determining

(a) The decision variables.

(b) Determine the objective function. What does it represent?

(c) Determine all the constraints. Briefly describe what each constraint represents.

Note: Do NOT solve the problem after formulating.

5. The Charm City Aluminum Company produces three grades (high, medium, and low) of aluminum at two mills. Each mill has a different production capacity (in tons per day) for each grade, as follows:

 

Mill 1

        Mill 2

High Grade

5.8

2.2

Medium Grade

       2.4

          4.1

Low Grade

       3.8

8.6

The company has contracted with a manufacturing firm to supply at least 10 tons of high-grade aluminum, 8 tons of medium-grade aluminum, and 6 tons of low-grade aluminum. It costs the company $6,500 per day to operate mill 1 and $7,400 per day to operate mill 2. The company wants to know the number of days to operate each mill in order to meet the contract at the minimum cost.

Formulate a linear programming model for the above situation by determining

(a) The decision variables.

(b) Determine the objective function. What does it represent?

(c) Determine all the constraints. Briefly describe what each constraint represents.

Note: Do NOT solve the problem after formulating.

6. Determine whether the following linear programming problem is infeasible, unbounded, or has multiple optimal solutions. Draw a graph to find the feasible region (if it exists) and explain your conclusion.

Maximize 100x + 200y

Subject to: 

          x + 2y > 40

                  x < 16

                  y > 15       

              x, y > 0

Engineering Mathematics, Engineering

  • Category:- Engineering Mathematics
  • Reference No.:- M91676587
  • Price:- $80

Guranteed 48 Hours Delivery, In Price:- $80

Have any Question?


Related Questions in Engineering Mathematics

Q undirected vs directed connectivitya prove that in any

Q: Undirected vs. directed connectivity. (a) Prove that in any connected undirected graph G = (V, E) there is a vertex v ? V whose removal leaves G connected. (Hint: Consider the DFS search tree for G.) (b) Give an examp ...

All these questions should be answered in matlab 1 generate

All these questions should be answered in MATLAB !!! 1. Generate a set of 3 random patterns of dimension 12 where each value is +1 or -1.(3 random 12*12 matrix) 2. Create a 12-unit Hopfield network (a 12x12 matrix) from ...

I have these questions for a homework assignment and have

I have these questions for a homework assignment and have to show work. This works with MIPS coding language and is the class Introduction to Computer Architecture. 1. Find the 2's complement representation (in 32-bit he ...

Question 1 - many spas many componentsconsider 4 types of

Question 1 - Many spas, many components Consider 4 types of spa tub: Aqua-Spa (or FirstSpa, or P1), Hydro-Lux (or SecondSpa, or P2), ThirdSpa (or P3) and FourthSpa (or P4), with the production of products P1, ..., P4 in ...

Analytical methods for engineers assignment - calculusthis

ANALYTICAL METHODS FOR ENGINEERS ASSIGNMENT - CALCULUS This assignment assesses Outcome - Analyse and model engineering situations and solve problems using calculus. Questions - Q1. Differentiate the following functions ...

Clculus assignment -q1 find the total differential of w

CALCULUS ASSIGNMENT - Q1. Find the total differential of w = x 3 yz + xy + z + 3 at (x, y, z) = (1, 2, 3). Q2. Find the value of the double integral ∫∫ R (6x + 2y 2 )dA where R = {(x, y)| - 2 ≤ y ≤ 1, y 2 ≤ x ≤ 2 - y. Q3 ...

Numerical analysis assignment -q1 define the following

Numerical Analysis Assignment - Q1. Define the following terms: (i) Truncation error (ii) Round-off error Q2. Show that if f(x) = logx, then the condition number, c(x) = |1/logx|. Hence show that log x is ill-conditioned ...

Question what is the signed binary sum of 1011100 and

Question : What is the signed binary sum of 1011100 and 1110101 in decimal? Show all of your work. What is the hexadecimal sum of 9A88 and 4AF6 in hexadecimal and decimal? Show all of your work.

Question a signal starts at point x as it travels to point

Question : A signal starts at point X. As it travels to point Y, it loses 8 dB. At point Y, the signal is boosted by 10 bB. As the signal travels to point Z, it loses 7 dB. The dB strength of the signal at point Z is -5 ...

Show all your work not just the answerswhen you multiply 21

(SHOW ALL YOUR WORK, not just the answers) When you multiply: 21 x 68 you most likely do: 8x1 + 8x20 + 60x1 + 60x20 = 1, 428 So, there are 4 multiplications and then 3 additions. How long would it take a computer to do t ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As