1. a. A pit with a straight ramp of 800m, with a gradient of 10%, supplies a ROM pad 1500m away via a level haul road all of loose gravel. Mining of a dipping ore body, with a specific weight of 2.5 t/m3, is required to be carried out at a rate of 10,000 tonnes/8 hour shift to feed the mill. Since truck speed is restricted to 50kmph, assume the average speed of a truck during a round trip is 45kmph, including reversing to load. Waste material of specific weight = 1.85 t/m3 is also to be mined, and deposited on a waste dump 200m from the pit. The waste dump already has a height of 10m, and an area of 100m x 60m from pre-stripped overburden. Excluding the overburden, the strip ratio is 1:4.5.

Other factors that are working assumptions are:
Availability of excavator 83%,
Swell factor of 30%
Bucket fill factor of 88%
Excavator cycle time 45 seconds
Rolling Resistance Factor (RRF) = 15 kg/t
Coefficient of Friction, µ = 0.25
Grade Resistance Factor = 20 kg/t

(i) Calculate required output by a single excavator appropriate to this production and select an appropriate machine.

(ii) Calculate cycle times for trucks.

(iii) Calculate number and size of trucks.

(iv) Ensure trucks are capable of carrying out this mining safely.

List and justify your assumptions.

Working Bench.

Consider a mining sequence on a working bench.

a. Define the width of a working bench with a neat sketch.

b. Design a working bench when a single shovel of 6.8m3 capacity details of which are supplied in the notes with single spotting is used:

Given:

design bench height =15m
shovel will move along one line parallel to the bench face
bench face angle 65°
parallel cut will be used with turn and back
single spotting
haulage by 50 tonne capacity truck
truck width = 5.5m
truck tyre rolling radius = 1.2 m
a safety berm is required

A Caterpillar 631 E tractor scraper has the following characteristics:
Maximum heaped volume = 19.6 Bm3
Maximum payload = 34,000 kg
The material hauled is earth with a density of 1825 kg/Bm3

Rolling resistance is 40 kg/t and operating conditions are average with a job efficiency of 45 min/hour.
The haul route comprises of the following sections:
Section 1 (200m) level-loading zone
Section 2 (1000m) 5% down grade
Section 3 (150m) level dumping zone
Section 4 (1000m) 5% up grade
Section 5 (50m) level turnaround area.

Estimate the machines production under these conditions using the travel time curves given in the Caterpillar Performance handbook.

4.

Design a spiral haul road system for the following surface mine:

pit consists of 8 benches
bench height is taken as 15m=H
crest-to-crest distance is 25m
bench face angle is 50°

a haul road having a width of 30m and 7% (=G%) gradient will be added to the outside of the pit wall

Answer the following:

a. Define stripping ratio and give three examples of the units it may be expressed in.

b. Define maximum stripping ratio.

c. Draw a section through an open pit showing the following:

i. Pit slope
ii. Bench slope
iii. Bench crest
iv. Pit floor
v. Bench toe
vi. Bench width

Draw a plan and cross-section of a dragline casting overburden from a new strip to an old strip in a coal mining stripping situation for a single seam and for a two seam operation

45) The average speed of an 18m3 scraper is 40 km/hr and its return speed uphill is 22 km/hr over a 400 m haul distance and a 450m return distance. Using a fixed time of 4 minutes, calculate the cycle time (min).

Other Engineering, Engineering

  • Category:- Other Engineering
  • Reference No.:- M91377024
  • Price:- $30

Guranteed 24 Hours Delivery, In Price:- $30

Have any Question?


Related Questions in Other Engineering

Task 1using the lab kit design a circuit for the processor

Task 1: Using the lab kit, design a circuit for the processor to control the output of a connected 7-segment LED display device. You will be provided with a standard common anode 7-segment display of the type FND-507 (or ...

Learning outcomes evaluate multiuser communication and

Learning Outcomes Evaluate multiuser communication and resource sharing techniques; Apply the techniques of, and report on, digital communication applications using Matlab and hardware devices. Assignment Description The ...

Mine safety amp environmental engineeringpart 1 questions1

Mine Safety & Environmental Engineering Part 1. Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the following terms ...

Assignment -problem 1 - given is the lcc difference

Assignment - Problem 1 - Given is the LCC difference equation that represents some LTI system: y(n) - ¾y(n-1) - ¼y(n-2) = x(n) + x(n-1)   a) Find the impulse response of the system (solve the LCCDE). b) Draw a block diag ...

Introduction to engineering design assignment -

Introduction to Engineering Design Assignment - Drafting Question 1 - Field notes and traverse drawing may be an outdated form of keeping and presenting information on the position of features on a site. Modern electroni ...

Mine safety amp environmental engineeringpart 1 questions1

Mine Safety & Environmental Engineering Part 1. Questions 1. Occupational health and safety is the primary factor that needs to be considered in the mining industry. Discuss this statement. 2. Define the following terms ...

A detailed review of spatial modulation and simulation

A Detailed Review of Spatial Modulation and Simulation Learning Outcomes a. Learn how to model mobile communication channels d. Discern knowledge development and directions on the recent advances in 4G to the research pr ...

Select a risk problem from the list below and prepare a

Select a risk problem from the list below and prepare a risk management plan in accordance with AS/NZS ISO 31000:2009. Please ensure that: - Establish the context clearly, in accordance with the Standard; - Define your s ...

Homework - risk and decision management1 you are working

Homework - Risk and Decision Management 1) You are working program X. The total budget allocated to the program is $100 M and it is to be completed in 24 mo. range (R) and passenger capacity (C) are two key performance p ...

Operations engineering assignment -please select only one

Operations Engineering Assignment - Please select only one of the following case studies for your assignment: CASE A. Tesla Motors Tesla is an innovative manufacturer that designs, assemble and sells fully electric vehic ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year