Problem: BOEING 787 DREAMLINER

The first Boeing 787 Dreamliner was delivered to Japan's ANA in the third quarter of 2011, more than three years after the initial planned delivery date. Its complicated, unique design (including a one-piece fuselage that eliminated the need for 1,500 aluminum sheets and 50,000 fasteners and reduced the resulting weight of the plane proportionally), promise of 20% increase in fuel economy and reduction in ‘out of service' maintenance time, and problems with early testing of the new design all contributed to the giant project's troubles. Delivery of Boeing's 787 Dreamliner project was delayed, in part, because of their global supply chain network, which was touted to reduce cost and development time. In reality, this turned out to be a major cause for problems. Boeing decided to change the rules of the way large passenger aircraft were developed through its Dreamliner program; rather than simply relying on technological know-how, it decided to use collaboration as a competitive tool embedded into a new global supply chain process. With the Dreamliner project, Boeing not only attempted to create a new aircraft through the innovative design and new material, but it also radically changed the production process. It built an incredibly complex supply chain involving over fifty partners scattered in 103 locations all over the world.

The goal was to reduce the financial risks involved in a $10 billion-plus project for designing and developing a new aircraft and reduce the new product development cycle time. It tapped expertise of various firms in different areas such as composite materials, aerodynamics, and IT infrastructure to create a network in which partners' skills complement each other. This changed the basis of competition to skill set rather than the traditional basis of low cost. In addition, this was the first time Boeing had outsourced the production on the two most critical parts of the plane- the wings and the fuselage. The first sign of problems showed up just six months into the trial production. Engineers discovered unexpected bubbles in the skin of the fuselage during baking of the composite material. This delayed the project a month. Boeing officials insisted that they made up the time and all things were under control. But next to fail was the test version of the nose section. This time a problem was found in the software programs, which were designed by various manufacturers. They failed to communicate with each other, leading to a breakdown in the integrated supply chain.

Then problems popped up in the integration of electronics. The Dreamliner program entered the danger zone when Boeing declared that it was having trouble getting enough permanent titanium fasteners to hold together various parts of the aircraft. The global supply network did not integrate well for Boeing and left it highly dependent on a few suppliers. This case clearly underscores the hazards in relying on an extensive supply chain in which information exchange problems may create extended problems and seriously compromise a company's ability to carry out business as planned. Creating a radically different process can mean encountering unexpected problems. In some cases, it would put a company so far behind their competition that they were doomed to fail. However, in this case, the major competitor to the Dreamliner, the Airbus 380 program, was also using a global supply-chain model, and its program was delayed by a couple of years. The result for Boeing was a much-anticipated plane with fuel economy and outstanding design that made the wait worth it, but the resulting design, a plane that holds up to 250 passengers, compared to the A380, which has a seating capacity between 525 and 853, was a major compromise.

Discussion Questions

1. Why did Boeing adopt the radical change approach for designing and developing the 787 Dreamliner? What were the risks? In your opinion, was it a good move? Defend your choice.

2. Using the Silo Perspective versus Business Process Perspective, analyze the Dreamliner program.

3. What are your conclusions about the design of the integrated supply chain? Give some specific ideas about what could have been done to integrate it better.

4. If you were the program manager, what would you have done differently to avoid the problems faced by the Dreamliner program?

Management Theories, Management Studies

  • Category:- Management Theories
  • Reference No.:- M92710362

Have any Question?


Related Questions in Management Theories

Read the case study why arent they listening answer the

Read the Case Study, "Why Aren't They Listening?" Answer the four questions at the end of the case study (SLII Figure). Directions: Write a three-part essay (i.e., an essay that includes an introduction paragraph, the es ...

What is the difference between a linear quadratic and cubic

What is the difference between a linear, quadratic, and cubic regression analysis? Please provide a reference.

Tasks1select any four of the following fundamental

Tasks: 1. Select any four of the following fundamental theories: o The Ten Commandments o The Justification of Human Rights o Utilitarianism o Aristotelian Ethics o International Ethics Standards for Business o Distribut ...

Chapter- gravity modela manufacturer of cat towers wishes

Chapter- Gravity Model A manufacturer of cat towers wishes to locate a super assembly facility to meet their cat tower assembly needs for the next millennium. Currently, carpet, cylinders, yarn and fasteners are purchase ...

A surgical technique is performed on nine patients you are

A surgical technique is performed on nine patients. You are told there is 70% chance of success. Find the probability that the surgery is successful for exactly 6 patients.

Case study assignment -case description liang global

Case Study Assignment - Case Description: Liang Global Solutions (LGS) operates in the six New England states. LGS faced an important decision: selecting network software that would maximize functionality, manageability, ...

Archetypes in actionsenge ross smith roberts amp kleiner

Archetypes in Action Senge, Ross, Smith, Roberts, & Kleiner (1994) noted: At its broadest level, systems thinking encompasses a large and fairly amorphous body of methods, tools, and principles, all oriented to looking a ...

Firm a has been dealing in baby food products for the past

Firm A has been dealing in baby food products for the past 10 years and enjoys a good market share. Suppose a new firm enters the market to capitalize on the increasing demand for such products. However, the products of ...

Think about one effective and one ineffective leader who

Think about one effective and one ineffective leader who you have encountered. Determine how each leader was effective or ineffective in his or her leadership styles and explain your reasoning with support from sources a ...

Questionwrite a paper of 1000-1500 words that addresses the

Question: Write a paper of 1,000-1,500 words that addresses the following: 1. Discuss two or three of the major shifts that have occurred in managerial theories and concepts pertaining to the evolution of human resources ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As