problem 1: Evaluate the various ways in which network logic can be developed.
problem 2: Describe the factors which should be considered when estimating activity durations.
problem 3: Describe the concept of float, by using an illustration to support your answer.
problem 4: Compare and contrast the three classes of project resource.
problem 5: Events which lie outside the control of the project manager can affect or completely wreck attempts at project planning. Illustrate.
problem 6: When is it more suitable to draw a network diagram from right to left instead of left to right?
problem 7: Describe how cash flow can be scheduled in a project.
problem 8: describe the different types of charts that a project manager will be able to use in managing a project. Describe the charts which you refer to.