Control of contracts

The contract control process commences right at the beginning stage of bid document preparation inviting contractors to bid, and proceeds through the contract negotiation, contractor selection, monitoring and controlling of the contractor?s work and terminating the contract..

For effective control of the contracts in a project, the following areas need attention:

  • Core competence of the project manager: The project manager must have experience in planning and management of similar projects. While he should be ready to refer to the individual specialists, he should be as knowledgeable as anyone about the economic and regulatory environment, engineering technology, project planning, scheduling and cost accounting, as well as construction.

His focus throughout the project implementation should be on the key criteria of scope, time, and cost and client satisfaction. He achieves this by interpreting the requirements to the specialists and directing their efforts to achieve the best combination of these four key criteria. His core competences will be to resolve conflicts which invariably arise between these four criteria. His objectives on the project are identical to that of the client; however, he should be able and willing to argue a point with the client when he feels it is necessary.

  • Requirements of the working system: For a competent project manager to be effective, the following components of the working system are necessary:
    • The project manager must have the necessary managerial authority to ensure response to his requirements from his team.
    • All major technical, cost, schedule, or performance decisions should be made only with the project manager's participation.
    • He must be identified as the authoritative and single formal contact in dealing with outside parties.
    • The project manager should have a say in the assembly of the project team, and personnel assigned to the project must be competent.
    • The project manager should have the authority to control the commitment of funds within the prescribed limits of the project, for which he liaises constantly with the owner?s representative.
    • Senior management must clearly demonstrate support for this concept.
  • Use of Work Breakdown Structure (WBS): A complex project is made manageable by breaking it down to smaller group to define task that can be achieved independently of other tasks. A formalised WBS is essential for effective control of contracts. A contract to be awarded on the project is identified after deciding the work package units. Consultants and contractors should confirm their agreement to the work package units for which they are responsible. Thumb rules for finalising and controlling work package units are:
  1. It should not  be necessary for the project management team to incorporate into the network schedule, information which is more detailed than the work package level. Progress should be monitored at this level and variances can be investigated through field reports.
  2. Work  packages  should  be  identified  2  to  6  months  prior  to performing the work, and can only be revised with the approval of the project manager and normally as a consequence of a change order.
  3. A project should not be broken down to such an extent, or contain work packages so small, that unnecessary administrative effort is incurred in maintaining the information flow. For example on projects up to, say, Rs.100 crores, a minimum work package value of, say,
  4. 0.1% is a good rule of thumb.
  5. For  schedule  control,  an  integrated network  should  be  drawn  to monitor and forecast progress. This schedule should not be changed unless:
  • A formal reprogramming of the entire project or major part takes place.
  • The target schedule and the current schedule become so far apart that recovery is impossible and target objectives become meaningless.
  • Such    changes    are     recognised     and    approved    by    top management.
  • Recognising the limitations with flexibility: While the D-B-B mode of contracting enables flexibility to make scope and design changes, it must be constantly ensured that the detailed designs with reference to a contract get substantially finalised prior to award of the contract.

Management Theories, Management Studies

  • Category:- Management Theories
  • Reference No.:- M9509344

Have any Question?


Related Questions in Management Theories

54 of public high school students are provided a computer

54% of public high school students are provided a computer by their school district. 40 students are selected at random. The random variable represents the number of students who have been provided a computer by their sc ...

What is the difference between a linear quadratic and cubic

What is the difference between a linear, quadratic, and cubic regression analysis? Please provide a reference.

Questionthere are several types of networks while the

Question: There are several types of networks; while the concepts are the same, only the names of the elements change. A network is a set of nodes connected by links, for example. However, some of the academic literature ...

Healthcare information technology overview the current

Healthcare Information Technology Overview: The current healthcare industry utilizes a plethora of healthcare information technology (HIT) systems. HIT systems are designed to enhance quality outcomes, prevent adverse ev ...

The following are amounts of time minutes spent on hygiene

The following are amounts of time (minutes) spent on hygiene and grooming in the morning by survey respondents (based on data from an SCA survey). 15, 16, 18, 25, 26, 30, 32, 41, 45, 55, 63. Does the number 63 appear unu ...

Tasks1select any four of the following fundamental

Tasks: 1. Select any four of the following fundamental theories: o The Ten Commandments o The Justification of Human Rights o Utilitarianism o Aristotelian Ethics o International Ethics Standards for Business o Distribut ...

Strategic information systems assignment - literature

STRATEGIC INFORMATION SYSTEMS ASSIGNMENT - Literature Review Write a literature review of NOT more than 2000 words. The review should demonstrate that the student has thoroughly researched their topic. Students should us ...

Show your work i already have my own answer and am trying

Show your work! I already have my own answer, and am trying to compare for accuracy. Graph needs to be included. Most graduate schools of business require applicants for admission to take the GMAT, the Graduate Managemen ...

Business research assignments -assessment 1 - literature

Business Research Assignments - Assessment 1 - Literature Review (2000 to 2500 words) For this assessment, students are expected to demonstrate their understanding of the extant, academic literature related to an approve ...

Df or computer forensics cf laboratory and what actually

(DF) or computer forensics (CF) laboratory and what actually one would find in a lab. Trust me, there are many different artifacts surrounding the DF/CF lab. After you find the article, you are to write a short 1-2 repor ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As