problem 1: Asset Management Strategic Planning

Background:
 
You are an asset manager for a medium sized company, the primary purpose of which is to provide services or products to industrial and/or domestic consumers. Some exs of such an organisation include, but are not limited to:

  • Water supply authority
  • Sewerage authority
  • Road network owner
  • Electricity supply company
  • Gas supply company
  • Telecommunications provider
  • Systems network provider
  • Power station owner
  • Product manufacturer.

Your organisation owns a network of assets that enable it to deliver its services. The assets in the network are of various types, sizes, ages and condition. Because of financial constraints over the past several years, the assets in the network have not been replaced except when absolutely necessary. Maintenance equipment is also not in a generally good condition. Inspection is mainly by visual means, supplemented where required by more detailed investigation.
 
While a basic asset management system program is in place, few minor assets are recorded on it. Most assets are still located by traditional methods such as links of key reference points (for ex, bends, pits, poles, equipment) to property boundaries and centreline distances, building locations, or similar types of reference points.  Other asset information is minimal, and is mainly limited to information that is absolutely necessary for maintenance purposes.
 
There is concern that your organisation’s assets are not always located as per your organisation’s records. The situation has been exacerbated by poor record keeping in the past, and by not recording changes when there have been changes to property boundaries, ground levels, and the assets themselves.  
 
This poor state of records makes it difficult for other service providers to have sufficient confidence in the information you supply about your assets for their design, construction and maintenance. 
 
Over the past several years, there have been a steadily increasing number of complaints by users of your products as a result of numerous breakdowns in service and failures. Were it not for the fact that there are a number of barriers of entry to the business in which your organisation is engaged (for ex, cost, government licences, technology), and the fact that the charges your organisation has levied for usage of its services are cheap compared with similar services elsewhere, your organisation might by now be in considerable difficulty.
 
With changes in technology and lessening government controls, there are a number of potential competitors entering the market. The rapid technological changes in the assets under your organisation’s control, in asset management processes and methods, and in the types of products delivered by your organisation, are increasingly placing competitors in a position to challenge your organisation to perform.
 
In search for an answer to what are clearly a number of looming concerns, your organisation has recently appointed you to develop an asset management strategy that meets the board’s targets of best industry practice for your particular type of asset network within five years, and a national leadership position within ten years.   
 
Funds – but not unlimited funds - have been made available for this purpose. Your organisation is expecting that the vastly improved standard of service brought by your management skills will bring contented customers who will pay the additional price required for a modern and reliable service. 
 
New technologies are available are expected to assist you to minimise the cost of upgrading your asset, select the best type of maintenance and rehabilitation, and enable your organisation to take a leading position in the asset management field. Other new technologies are likely to enable you to increase the choices available to the consumer and greatly improve the quality of service provided.
 
Your Task:
 
prepare a submission to your chief executive officer of your organisation describing a strategy to review and improve your organisation’s assets, their management, and the standard of service which they provide, to achieve the board’s goals.  
 
You will need to select the organisation, type of assets and asset network you are managing.  
 
While a real organisation is preferred, you may prepare your answer for a hypothetical organisation. You should indicate whether the organisation about which you are writing is real or hypothetical. 
 
Your submission should be between 3000 and 4000 words in length and will have, in addition to the body of the report, an abstract, table of contents, background, introduction, conclusion and list of references. Background information should be as brief as possible and include a brief description of your organisation, its asset network, services provided by that asset network, and current state of the network.   
 
At a minimum, your report should address the following specific points:
 
A) Background information about the asset network and the assets in it (this should be sufficient to set the scene for the reader).
B) The asset life cycle.
C) Stakeholder expectations.
D) The outcomes you want to achieve at the end of the five and ten year periods.
E) Performance and serviceability requirements and indicators.
F) Development of a reliable asset inventory.
G) Deterioration and condition monitoring.
H) How to achieve optimum performance from the asset network.
I) Current and future technologies.
J) Development of a corporate asset management plan.
K) Use of appropriate asset management systems.
L) Likely benefits and costs.
M) Conclusion.
N) Recommendations.

problem 2: An asset under your management, with an estimated life of 20 years, costs $3,500,000 to purchase and install. It has a revenue stream of $800,000 per year. 
 
Costs of operation and maintenance of the asset are as follows:
 
Years 1 to 15:      $200,000 per year for each year
Year 16:              $250,000
Year 17:              $300,000
Year 18:              $350,000
Year 19:              $400,000
Year 20:              $500,000
 
This asset is currently 18 years old and is hence nearing the end of its design life. It therefore should be replaced or rehabilitated. As lead times for ordering equipment and arranging contracts can be quite long, a decision has to be made quickly with respect to the best decision.  
 
There are two options to consider at the end of the 20 year life of the asset:
 
1) Replacement with a similar asset.
2) Rehabilitation, which will extend its service life by 10 years (i.e., to 30 years in total).
 
Funds are available for whatever option is selected. There is a lead time of twelve months for ordering and installing a new asset, or undertaking rehabilitation, and therefore a decision on the most suitable option for replacement or rehabilitation is required as soon as possible.
 
Replacement:
 
If the asset is replaced at the end of its 20 year design life, its residual value then will be $400,000. It will cost $200,000 to remove the asset from service when it is replaced.
  
The replacement is expected to be completed in about three to six months after the end of the design life of the asset.
 
During the period of replacement, there will be no disruption to service of the asset. Hence the normal revenue stream will be maintained. Costs of operation and maintenance for the year in which the asset is replaced are expected to be $350,000, as there will be a period during this year in which the old asset, which has relatively high operation and maintenance costs, will still be functioning. 
 
Under the terms of the replacement contract, all payment for replacing the asset is made after the asset
has been successfully replaced.
 
Rehabilitation:
 
The asset may be rehabilitated after the end of 20 years of service at a cost of $1,200,000. This process will extend its service life by 10 years (i.e., to 30 years in total).  

The rehabilitation process will take up to one (1) year, immediately after completion of the design life of the asset. During the year in which rehabilitation is undertaken, overall costs of operation and maintenance will be $400,000. For each of the remaining nine (9) years of service of the asset following rehabilitation, costs of operation and maintenance of the asset will be $300,000 per year. 
 
During the period of rehabilitation, the asset will continue operating, but at a reduced capacity. Revenue received during the year in which rehabilitation is undertaken will be $500,000. The normal revenue stream will be resumed in the following year. 
 
At the end of the period of operation of the rehabilitated asset, it must be replaced. Its scrap value then will be $100,000, and there will be a cost of $250,000 to remove it. Other costs will be the same as those listed above for replacing the asset.
 
Under the terms of the rehabilitation contract, all payment for rehabilitation of the asset is made after completion of a successful rehabilitation.
 
Your Task:
  
Part A: Using the net present value method, assess the best option with respect to either rehabilitating or replacing this asset at the end of its life. You should use a spreadsheet, with any necessary explanations, for your calculation.   
 
Money costs 7% per annum.  Assume zero inflation.  Assume also that for the purposes of analysis, all revenue received and costs incurred in a given year occur at the end of that year. 
 
Assume that once an option for rehabilitation or replacement has been selected that it will be repeated for the second and subsequent asset life cycles following the action taken. For ex, if the decision is to rehabilitate at the end of 20 years, then the next life cycle (commencing at an asset age of 30 years) will consist of replacement followed by rehabilitation.  
 
Part B: Repeat your analysis using at least five (5) additional discount rates to the 7% per annum that you used for Part A. The range of these discount rates should be from 3% per annum to 13% per annum.
 
At what discount rate, if any, would the owner of the asset be indifferent with respect to selecting rehabilitation or replacement as the preferred option at the end of the design life of the asset? Briefly discuss your answer.
 
In what situations might you use:

  • a lower discount rate than the prevailing market discount rate;
  • a higher discount rate than the prevailing market discount rate. 

 Give exs.
  
Part C: Finally, consider (in no more than 400 words) how your answer would be influenced if issues other than economic cost were considered. For ex, if the asset was rehabilitated at the end of its useful life, would the reduced capacity of the asset during the rehabilitation process result in the permanent loss of a number of customers, and hence reduced revenue? How would you consider the availability of modern materials with a higher sustainability rating than materials used in the original asset were available? What if one option (rehabilitation or replacement) better contributed to the community than another? What other issues might be relevant?

Strategic Management, Management Studies

  • Category:- Strategic Management
  • Reference No.:- M9840

Have any Question? 


Related Questions in Strategic Management

Assignmentpart 1strategic managementcase study 6-ikea case

Assignment Part 1 Strategic Management Case Study #6-IKEA (Case Study Info at bottom of the document) Research and prepare a 7- to 8-page report in a Microsoft Word document concerning the following situation: The IKEA c ...

Strategic management process in terms of your career

Strategic Management Process in Terms of Your Career Development Plan Need an essay to read in video presentation, presentation that explains the strategic management process in terms of your career development plan. The ...

Strategy choice and implementation reporttaskit is often

Strategy Choice and Implementation Report Task It is often noted that implementation is the most difficult aspect of strategic management. With reference to your organisation, how might this be the case? Report should co ...

1 identify the major components of strategic planning and

1. Identify the major components of strategic planning, and explain how they are interrelated. 2. What are the two major parts of a marketing strategy? 3. What are some issues to consider in analyzing a firm's resources ...

Discuss what if any programs or policies pertaining to

Discuss what, if any, programs or policies pertaining to corporate social responsibility (CSR) exist at your assigned company. Mine is Keurig Green Mountain Inc. How do a firm's leaders' views on CSR affect strategic pla ...

Strategic managementwritten case analysisthis project

Strategic Management Written Case Analysis This project culminates what you have learned in the class and requires you to perform a CONCISE, CHART DRIVEN strategic analysis for a company of your own choosing. This analys ...

Using a web search engine find five examples of values

Using a Web search engine, find five examples of values, vision, and mission statements as well as public declarations of organizational strategy. Do these examples express concern for the security of corporate informati ...

Assignment strategy analysis and selectionpurpose this

Assignment: Strategy Analysis and Selection Purpose: This assignment is the second of three assignments. Students will use the tools and concepts learned in the course and in previous business courses to develop an under ...

Imagine that you are the ceo of a successful domestic

Imagine that you are the CEO of a successful domestic company. In the last 6 months, many potential clients in foreign countries have expressed a desire to conduct business with you. You know that in order for your compa ...

Strategic planning amp marketing in health care

Strategic Planning & Marketing in Health Care Assignment SWOT Analysis This week's assignment will allow you to generate content that you will incorporate into the Market Analysis section of your Final Project. To prepar ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Section onea in an atwood machine suppose two objects of

SECTION ONE (a) In an Atwood Machine, suppose two objects of unequal mass are hung vertically over a frictionless

Part 1you work in hr for a company that operates a factory

Part 1: You work in HR for a company that operates a factory manufacturing fiberglass. There are several hundred empl

Details on advanced accounting paperthis paper is intended

DETAILS ON ADVANCED ACCOUNTING PAPER This paper is intended for students to apply the theoretical knowledge around ac

Create a provider database and related reports and queries

Create a provider database and related reports and queries to capture contact information for potential PC component pro

Describe what you learned about the impact of economic

Describe what you learned about the impact of economic, social, and demographic trends affecting the US labor environmen