Ask Strategic Management Expert

Topic - Knowledge

Project delays in construction - Difficult to have previous records related to staff and construction waste from the industries.

Understanding of the issue

Is the topic already extensively investigated?

Likely problems/ Research Limitations

Topic: Flexural and shear behavior of RC beams retrofitted with externally bonded GFRP fabrics.

Aim: To study the flexural and shear in beam using Glass fiber reinforced plastic.

Objective(s):
- To understand the effect of using GFRP in strength and stiffness of the beam.
- To study of the behavior of understrength concrete beams retrofitted withGFRP.
- To enhance the flexural and shear behavior and load carrying capacities of RC beam externally bonded with GFRP fabrics.
- To find the flexural and shear behavior of GFRP fabrics.
- To develop the long lasting and cost effective method of enhancement in retrofitting technology using GFRP fabrics.

Methodology:

1. Summarizing the literature review.
2. Preparing the design mix.
3. Casting of under reinforced RC beam .
4. Appling the GFRP fabrics by the bonding material Epoxy Resin .
5. Testing the understrength beam using two point method.
6. Measuring the strength, stiffness, ductility and the associated failure mode.
7. Interpretation of results.
8. Preparation of the report.

PAPER

Section 1. Abstract (read the abstract and answer the following questions)
1. What is the objective of the paper?

2. What are the contributions from the authors?

3. What are the main results mentioned in the abstract?

4. Does the abstract serve as a summary of the paper, presenting the objective, scope and results?

Section 2: Introduction (read this section and answers the following questions)

1. What ‘research problem' is discussed in the paper?
2. What rationale is given by the authors, attributing importance to the research problem?
3. How many earlier works are cited by the authors and what are the perceived drawbacks of these earlier works?
4. How and why the authors claim to have a better technique or approach?

Section 3: Methodology

1. What methodology is used by the authors to address the research problem?
2. In what way the methodology used by the authors is relevant to the methodology you proposed to adopt?

Section 4: Results and Conclusions

1. List the results obtained by the authors.
2. What are the conclusions drawn by the authors from the study.

Write a critical analysis of the paper (about 200 words)

Research Activities

Activity 1: A technical paper related to the area of the student's topic (masking the details which will reveal the identification of the paper) will be given to the student by his/her RM Supervisor and the student will be required to write a Critical Analysis and an Abstract based on the scientific information available in the paper.

Critical Analysis

With the introduction to the topic, students are expected to critically analyze the literature part that contains key findings of previous authors, methodology adopted in given paper and parameters used for analysis and analyze the results obtained (from graphs / tables) and important conclusions derived based on the result. Each topic has to be presented separately in the form of paragraphs and the word count for this part shall be 500 to 750.

Abstract

The Abstract must contain description of the topic, important applications of the topic, brief description about previous literature presented in the paper, methodology adopted by the author, important results obtained and conclusions derived from the results. The word count is limited to 250.

Activity 2: Visit the Library & Resource Centre, e-brary and Internet sites and look for the literature like books, e-books, journal/conference papers, reports, articles, videos etc., (preferably) related to the project topic or area. For this literature found, write the in-text citation and prepare the reference in CCE-Harvard referencing style.

There must be: 2 Library books or E-library books, 5 Journal or Conference Papers/Reports or Magazine Articles etc., 2 Web based resource like websites, electronic report, videos etc. and 1 Image in Book

Study Report

RMl Study Report should contain various chapters including Abstract, Introduction, Literature review and Methodology of the selected project title as given below. There is no limitation for the references to be added in the literature review. The students can refer text book, website and more technical papers which they found relevant to their project topic.

- Title Page: As per specified format (Obtain from Blackboard)
- Acknowledgement: The acknowledgement by the student for those from whom he/she received support for successfully carrying out the project work

- Abstract: It is the condensed version of the proposed project, which contains aim, objectives and methodology in a paragraph form. The write up should be self-contained and list of references need not be mentioned here. The abstract should occupy maximum one page. The bottom line should contain key words.
- Contents The content shall follow the abstract and indicate the page numbers of the chapters, sections, sub-sections, appendices and references. The number and titles of all the items must be clearly entered with page numbers against them.
- Nomenclature: Nomenclature will follow the' contents'. Its purpose will be to define all the symbols, abbreviations, Greek or Latin letters, superscripts etc.

1. Characterization of Glass Fibre Reinforced Polymer Composite Prepared by Hand Layup Method by Abdullah Al Mahmood, Abdul Mobin, Rezwon Morshed, Tasmia Zaman

2. GLASS FIBER REINFORCED POLYMER BARS AS TOP MAT REINFORCEMENT FOR BRIDGE DECKS by J. M. DeFreese and C.L. Roberts-Wollmann

Strategic Management, Management Studies

  • Category:- Strategic Management
  • Reference No.:- M92579980
  • Price:- $85

Priced at Now at $85, Verified Solution

Have any Question?


Related Questions in Strategic Management

Question - the discussion thread is centered on the

Question - The discussion thread is centered on the resource-based view of the firm as espoused by Jay Barney. In the section on Human Resources in your text, Barney's focus on the correlation between superior financial ...

Please use enterprise rent a car for organizationcreate the

Please use ENTERPRISE RENT A CAR for organization Create the Final Strategic Plan. The Final Strategic Plan contains the elements of all the previous weeks' components and incorporates instructor feedback. The strategic ...

Strategic management assignment - authentic research

Strategic Management Assignment - Authentic Research Portfolio This assignment focuses on your understanding and appreciation of Strategic Management Inputs. You are required to identify a corporation in the Agribusiness ...

Business strategy assignment - business strategy

Business Strategy Assignment - Business Strategy: Telecommunication Sector (UK) Purpose of this assignment - This assignment is designed to develop students' awareness of the different kinds of strategy which could be us ...

Assignment -case - real-world cases wipro and

Assignment - CASE - Real-World Cases: Wipro and MBH Self-service is a very valuable tool. HR departments can use an integrated ERP self-service design to provide employees and consumers with a user-friendly interface for ...

Assessment - blog and learning reflectionsassessment

Assessment - Blog and Learning Reflections Assessment Criteria - Demonstrate regular use of the weekly blog by providing clear cross-referencing between report and at least 8 time-stamped meaningful blog entries THROUGHO ...

Complete a value chain analysis of an organization from ksa

Complete a value chain analysis of an organization from KSA. For this assignment, complete the following: - Explain the concept of value chain. Identify and discuss value chain strategies in your present organization or ...

What is related diversification what is unrelated

What is related diversification? What is unrelated diversification? Provide examples of each and compare and contrast the two types.

Question choose an organization according to the

Question: Choose an organization according to the following: • Current employer • Most recent or former employer • Place of business that you have patronized or have been familiar with over a long period of time. - Avoid ...

Question a rental company owns a building from which it

Question: A rental company owns a building from which it leases out multiple offices. During the year it received the following advance rental payments for one-year leases from separate tenants: $24,000 in June, $36,000 ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As