Ask Project Management Expert

This assignment consists of two (2) sections: a Work Breakdown Structure (WBS) and a summary document. You must submit the two (2) sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for.

Overview:

As the IT Project Manager, you have been assigned a project to deploy ten (10) wireless access points in your company's warehouse and break room within the next ninety (90) days. You are free to make assumptions that satisfy the scope of the project such as training, wiring, consulting efforts, etc.

Your submission will also be graded on the accuracy of your work package assumptions and duration estimates.

Section 1: Work Breakdown Structure (WBS)

Required Format (MS Project File)

  1. Use Microsoft Project or Open Project (.mpp format) to create a WBS in which you:
  2. Create 15 or more decomposed work packages into 4 levels that are assigned to 5 or more main tasks (75 line items).
  3. Ensure the main WBS tasks headings are the 5 PMBOK® process areas.
  4. Create a Work Breakdown Structure Code for each task.
  5. Determine an overall project duration and duration estimates for each of the tasks. The duration is not to exceed 90 days.
  6. Create accurate work package assumptions and duration estimates.

Section 1 of your assignment must follow these formatting requirements:

Microsoft Project or its open source alternative in .mpp format.

Section 2: Summary Document

Required Format (MS Word File)

  • Use Microsoft Word to write a one (1) page summary in which you:
  • Summarize how this activity improves the chances of your future IT project being a success.
  • Use at least one (1) quality resource in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources.

Section 2 of your assignment must follow these formatting requirements:

  • Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.
  • Include a cover page containing the title of the assignment, the student's name, the professor's name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.

The specific course learning outcomes associated with this assignment are:

  1. Identify how project management improves the success of information technology projects.
  2. Explain the relationship of the scope of a project to the work breakdown structure.
  3. Use technology and information resources to research issues in IT project management.
  4. Write clearly and concisely about issues in IT project management using proper writing mechanics and technical style conventions.

Project Management, Management Studies

  • Category:- Project Management
  • Reference No.:- M9778620

Have any Question?


Related Questions in Project Management

Presentation and written assessment -the argumentative

Presentation and Written Assessment - The argumentative essay must be 1500 words in length. The presentation is about 10-15 minutes long depending on the size of the group. Task Description: The objective of this assignm ...

Topic - identifying the ways to overcome the communication

Topic - Identifying the ways to overcome the communication barriers of international project management students at central Queensland University. Literature review (1000 words) References would be needed in this section ...

Case study continuous improvementintroductionprecision

Case study: Continuous Improvement Introduction Precision Engineering Works Private Limited (PEW) is an original equipment manufacturer specialising in plastic moulding parts for the telecommunication industry. They have ...

Advanced project risk managementaimthe aim of this

Advanced Project Risk Management Aim: The aim of this assignment is to: demonstrate the understanding of Decision Tree/Expected Monetary Value and the use of the software Precision Tree schedule a project using Oracle Pr ...

Critical analysis reportthis is a group assessment for face

Critical Analysis Report This is a group assessment for face to face students and individual assessment for distance students The primary purpose of this assessment is to help you to develop and demonstrate your skills i ...

Project managment1explain what is meant by the following

Project managment 1. Explain what is meant by the following: "The project scope statement should not be built in isolation." 2. Discuss project management related problems created due to "scope creep." Each question shou ...

Project management for business assignment -enabling a

Project Management for Business Assignment - Enabling a Customer-Centric Experience through Project Management (Case Study Adapted from Project Management Institutes) Organization: Du Telecom and Huawei Technologies Co. ...

Principles of project management minor case study

Principles of Project Management Minor Case Study Assignment - Assignment objective - You are required to investigate a Project Management scenario, using information given to develop a written report and presentation to ...

Project management assessment - research studypurpose of

Project Management Assessment - Research Study Purpose of the assessment - Develop skills in Project communication planning. Communication is Key to Successful Project Management. The cases illustrate different approache ...

Assessmentthis assignment involves the portfolio of

Assessment This assignment involves the Portfolio of Materials and Team Charter 1. Description and justification of the innovation process used. A 1-page plan/outline that explains how social media will be used A short b ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As