Ask Project Management Expert

The purpose of this project is to perform a finite element analysis on a mechanical system in ANSYS and communicate the results clearly in a standard report format.

You are encouraged to find your own project. The project can be a finite element analysis of a mechanical system that is related to your research or other courses. As this class is focused on FEA method and static structure analysis, choose a static structure problem for your project and conduct a detailed analysis.  Here are some suggestions:

1. Your own project (must include background information, preliminary analysis, parametric study or optimization, mesh convergence study and results analysis)

2. Expand the homework problems in the textbook  (must include background information, preliminary analysis, parametric study or optimization, mesh convergence study and results analysis)

3.  Find project idea from journal papers and internet. Below are some links for good projects:

  • Google and you will find ideas for design and FEA analysis of a robot arm, bracket, spur gear, crankshaft, connection rod, solar panel, solar panel tracking system, etc
  • http://www.centaureng.com/finite_element_analysis_fea_fem.php
  • http://www.zabaras.com/Courses/MAE4700/CornellFEMSymposium.htm
  • http://www.keydesigneng.com/page72.html#FEAExamples
  • http://inside.mines.edu/~apetrell/ENME442/ (FEA Project)
  • http://urbana.mie.uc.edu/yliu/Showcase_FEA/showcase_fea.htm

You can form a team of two members and divide or work together on a project. The maximum number of members in a team is 2. You need to identify each team member's contributions to the project and the final report.

After forming a team and choosing a project.  You need to present your project proposal on 4/13/15. It will include background information of your project, project objectives, and project plan. Each team will have 6 minutes with 4 minutes for presentation and 2 minutes for questions and answers. Both team members are required to present. Please submit you PowerPoint file through the Project Proposal link.

The final project presentation is on 5/4/15. Each team will have 10 minutes with 6 minutes for presentation and 4 minutes for questions and answers. Both team members are required to present.

Write a report to present your project and simulation results. Follow the standard format of a journal paper or design report to prepare your report. A report template (Project template.docx) for a general structural finite element analysis is given for your reference. The report in Word will be due in Canvas on 5/6/15.

The project will be evaluated both on your report (May 6) and oral presentation (May 4).

Requirements

You must conduct a thorough analysis of the system you choose to model and prepare a report highlighting your work. You do not need to submit your model files, but they should be kept available for inspection if requested by your instructor. Your report should provide sufficient detail so another engineer with strong FEA skills could reproduce your results. Some general guidelines for your report:

1. Make sure to explain the mechanical behavior of the real physical system you are modeling.

2. Comment on the underlying theory that is important to include in your model in order to reproduce the correct physics.

3. Explain how you developed the mesh for your model. What features of the ANSYS mesh generator did you use to get good results? You are expected to seek mesh convergence, but this could be done manually or automatically. Show error plots or element quality metrics if appropriate.

4. You must make some attempt at model validation. This may be done with simple hand calculations to estimate the range of results you expect to see from your FE model, or you may refer to experimental measurements if you have access to some.

5. In order to get full credit for your project you must use the FE model you create to obtain some insights about the system you are modeling. For example, you may investigate a design question such as, what must be the dimensions of certain features to avoid failure. You may study how changing a certain feature or dimension effects performance (however it is defined for your system). Some other options could include a sensitivity analysis, an optimization, or a Monte Carlo simulation. You only need to choose one of the above suggestions that is appropriate for your project.

Project Management, Management Studies

  • Category:- Project Management
  • Reference No.:- M91529846
  • Price:- $45

Priced at Now at $45, Verified Solution

Have any Question?


Related Questions in Project Management

Presentation and written assessment -the argumentative

Presentation and Written Assessment - The argumentative essay must be 1500 words in length. The presentation is about 10-15 minutes long depending on the size of the group. Task Description: The objective of this assignm ...

Topic - identifying the ways to overcome the communication

Topic - Identifying the ways to overcome the communication barriers of international project management students at central Queensland University. Literature review (1000 words) References would be needed in this section ...

Case study continuous improvementintroductionprecision

Case study: Continuous Improvement Introduction Precision Engineering Works Private Limited (PEW) is an original equipment manufacturer specialising in plastic moulding parts for the telecommunication industry. They have ...

Advanced project risk managementaimthe aim of this

Advanced Project Risk Management Aim: The aim of this assignment is to: demonstrate the understanding of Decision Tree/Expected Monetary Value and the use of the software Precision Tree schedule a project using Oracle Pr ...

Critical analysis reportthis is a group assessment for face

Critical Analysis Report This is a group assessment for face to face students and individual assessment for distance students The primary purpose of this assessment is to help you to develop and demonstrate your skills i ...

Project managment1explain what is meant by the following

Project managment 1. Explain what is meant by the following: "The project scope statement should not be built in isolation." 2. Discuss project management related problems created due to "scope creep." Each question shou ...

Project management for business assignment -enabling a

Project Management for Business Assignment - Enabling a Customer-Centric Experience through Project Management (Case Study Adapted from Project Management Institutes) Organization: Du Telecom and Huawei Technologies Co. ...

Principles of project management minor case study

Principles of Project Management Minor Case Study Assignment - Assignment objective - You are required to investigate a Project Management scenario, using information given to develop a written report and presentation to ...

Project management assessment - research studypurpose of

Project Management Assessment - Research Study Purpose of the assessment - Develop skills in Project communication planning. Communication is Key to Successful Project Management. The cases illustrate different approache ...

Assessmentthis assignment involves the portfolio of

Assessment This assignment involves the Portfolio of Materials and Team Charter 1. Description and justification of the innovation process used. A 1-page plan/outline that explains how social media will be used A short b ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As