Abstract- We report on a cost effective, portable urban air pollution monitoring device, Envirobat, based on commercially available gas sensors. In order to carry out air pollution monitoring over an extensively large area, the device integrates inexpensive solid state sensors, along with GSM Module which transmits measured data at multiple ground sites to a centralized server through GPRS. This device facilitates rapid dissemination of information on pollution levels at multiple ground sites simultaneously. The device has the capability to sense location, atmospheric pressure, temperature, humidity, CO2, CO, SO2, NO2, and O3. The device is validated through
calibration and deployment for indoor and outdoor sensing applications.

Microcontroller: The controller board is based on TI's MSP430F5435A microcontroller. It controls timings fo switching on/off of all sensors used in the device, processes the sensor output data and sends the sensor data to a server through a communication module (GSM). The board consists of the µController, powe management unit, sensor signal conditioning circuitry and provision for connecting sensor and communication boards. Fig.2a given below shows the Microcontrolle board design implemented on a PCB.

B. Calibration Methodology

General procedure followed for calibrating a gas sensor:

• Place the sensor under test in a closed chamber which will be filled by the gas to be detected.

• Set the concentration of the gas to a known value and fill the closed chamber with the gas.

• Record the output of the sensor continuously for "sometime" (depends on the flow rate of the gas and the chamber size) for uniform distribution of the gas in the chamber.

• Repeat the procedure for a different concentration of the gas.

• Plot the output of the sensor versus gas concentration.

• Obtain the relationship between sensor output and gas concentration.

• Compare it with the sensor's datasheet relation and obtain the offset between the datasheet's values and practical values.

• The gas concentration level is calculated from the measured EMF values at sensor electrodes for CO2 sensor. The actual EMF value decreases with increasing concentration of CO2.

Envirobat device is designed with easy user interface with display and keyboard for setting up various parameters during measurement. Also SD card interface makes the data available to user immediately. The user has option of creating his customized setting for transmitting data at appropriate intervals. This version of Envirobat demonstrates monitoring urban air pollutants and logging the acquired data for online access. There is a great flexibility for user to access the data from the device. The online GUI provides better user experience by visualizing the graphs.

The future version of Envirobat would include a touch screen to give user a better experience. A Zigbee module which will enable the networking between the devices so that devices can talk among themselves and there could be a single master device that communicates with server through TCP/IP protocol. The device settings of measurement periodicity, data upload periodicity could be controlled remotely from a computer terminal remotely. A Bluetooth module to facilitate the wireless data communication with hand held mobile devices is being worked on. A dedicated RTOS would be implemented on the device. The Envirobat module could be customized to suite various applications in air quality monitoring, locating the sources of pollution, personalized exposure to air pollution levels for health tracking etc.

Project Management, Management Studies

  • Category:- Project Management
  • Reference No.:- M91272257
  • Price:- $85

Priced at Now at $85, Verified Solution

Have any Question?


Related Questions in Project Management

Presentation and written assessment -the argumentative

Presentation and Written Assessment - The argumentative essay must be 1500 words in length. The presentation is about 10-15 minutes long depending on the size of the group. Task Description: The objective of this assignm ...

Topic - identifying the ways to overcome the communication

Topic - Identifying the ways to overcome the communication barriers of international project management students at central Queensland University. Literature review (1000 words) References would be needed in this section ...

Case study continuous improvementintroductionprecision

Case study: Continuous Improvement Introduction Precision Engineering Works Private Limited (PEW) is an original equipment manufacturer specialising in plastic moulding parts for the telecommunication industry. They have ...

Advanced project risk managementaimthe aim of this

Advanced Project Risk Management Aim: The aim of this assignment is to: demonstrate the understanding of Decision Tree/Expected Monetary Value and the use of the software Precision Tree schedule a project using Oracle Pr ...

Critical analysis reportthis is a group assessment for face

Critical Analysis Report This is a group assessment for face to face students and individual assessment for distance students The primary purpose of this assessment is to help you to develop and demonstrate your skills i ...

Project managment1explain what is meant by the following

Project managment 1. Explain what is meant by the following: "The project scope statement should not be built in isolation." 2. Discuss project management related problems created due to "scope creep." Each question shou ...

Project management for business assignment -enabling a

Project Management for Business Assignment - Enabling a Customer-Centric Experience through Project Management (Case Study Adapted from Project Management Institutes) Organization: Du Telecom and Huawei Technologies Co. ...

Principles of project management minor case study

Principles of Project Management Minor Case Study Assignment - Assignment objective - You are required to investigate a Project Management scenario, using information given to develop a written report and presentation to ...

Project management assessment - research studypurpose of

Project Management Assessment - Research Study Purpose of the assessment - Develop skills in Project communication planning. Communication is Key to Successful Project Management. The cases illustrate different approache ...

Assessmentthis assignment involves the portfolio of

Assessment This assignment involves the Portfolio of Materials and Team Charter 1. Description and justification of the innovation process used. A 1-page plan/outline that explains how social media will be used A short b ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year

Compute the present value of an annuity of $ 699 per year for 19 years, given a discount rate of 6 percent per annum. As