Resource planning/allocation: How many service technicians does it take?

Assumptions/factors:

- Available working hours: 8AM - 5PM Monday - Friday, with one hour off for lunch (time not fixed), and two 15-minute breaks (times not fixed).

- Scope of work includes receiving a dispatch (ticket), contacting and visiting user, verifying/clarifying issue, troubleshooting to isolate problem area/cause, repairing or replacing defective items as most appropriate.

- They must successfully resolve 90% of all events within 4 business hours, which can span two business days (example: 1 hour Monday, 3 hours Tuesday). The 4 hours is measured between receipt of dispatch (ticket) and problem/event resolution.

- Historically average (mean) event working time duration: 1.42 hours, with a range of 0.5 hours to 4.0 (or more) hours. Typically less than 2% (assume 2%) require more than 4 business hours to resolve. Assume normal distribution of event durations.

- Assume all times stated above include logistics/comms/prep/cleanup, etc. - no additional tasks remain. Assume no travel or related issues (already at same site as event).

- Average (mean) number of events per month: 3204. Average (mean) number of working days per month: 20.9. Average (mean) number of events per day = 153.3.

- Assume equal competency, skills, and tools by all technicians - no other know variables.

Request:

A formula that accurately predicts minimum number of technicians needed to staff to guarantee 90% of all resolutions will occur within the 4-hour business hour window, and how to account for the following changes:

a. Average event working time (example: increases from 1.42 to 2.5 hours per event)

b. Changes in service level (the 90% or the time window) affect the calculation. For example, if the service level changed from 90% to 95%, or the resolution time requirement changed from 4 hours to 8 hours, how should I account for those changes when recomputing staffing requirements?

c. Changes in available working hours; for example, if work hours change from 8AM - 5PM to 9AM to 5PM, how do I account for that in the staffing model?

Management Information System, Management Studies

  • Category:- Management Information System
  • Reference No.:- M9728258

Have any Question?


Related Questions in Management Information System

Please answer all 5 questions instructor will use

Please answer all 5 questions. Instructor will use turnitin. NOTE: Answers should generally be about 1½- 3 double spaced pages for each number. Of course, questions with multiple parts will be longer as will more complex ...

Designing a network topologyplease respond to the

"Designing a Network Topology" Please respond to the following: Present real-world examples that describe the significance of designing modular, redundant, and secure network architectures. Defend your answer from a tech ...

Search the csu library the internet or any specific

Search the CSU library, the Internet, or any specific websites, and scan IT industry magazines to find an example of an IT project that had problems due to organizational issues. Write a paper summarizing the key stakeho ...

Part 11 what are the practical implications in the

Part 1 1) What are the practical implications in the theoretical framework? 2) What are the complexities seen in the organization? Write 300 Words. Include in-text citations and references in APA style formatting. Must h ...

Question in roughly 200 words - explain what social

Question : In roughly 200 words - Explain what social engineering is, and discuss how organizations can recognize social engineering and reduce the risks associated with it. The response must be typed, single spaced, mus ...

Answer the following question 1describe why projects need

Answer the following Question : 1. Describe why projects need to be planned and typical planning problems. 2. Discuss Schedule planning in detail 3. Why is Estimating difficult? What are good estimating practices? 4. Dis ...

Do you agree or disagree and whyenterprise risk management

Do you agree or disagree and WHY? Enterprise risk management is is the process a business or individual undertakes to plan, organize, control and lead the activities that affect a company's or individual's capital and ea ...

Assignmentyour team will pick a business sector and then

Assignment Your team will pick a business sector and then visualize a type of business. You are not researching a real business, you are creating a fictional business. A. Choose one of these business sectors: 1. Healthca ...

A register is the fastest data storage element within a

A register is the fastest data storage element within a processor. A 32-bit register consists of a set of flip-flops to store 32 bits of information. Design a 4-bit register by using flip-flops and answer the following q ...

Question a boeing 787 dreamliner if you were the program

Question : a) Boeing 787 Dreamliner. If you were the program manager, what would you have done differentlyto avoid the problems faced by the Dreamliner program? b) Enterprise Architecture at American Express. Why was it ...

  • 4,153,160 Questions Asked
  • 13,132 Experts
  • 2,558,936 Questions Answered

Ask Experts for help!!

Looking for Assignment Help?

Start excelling in your Courses, Get help with Assignment

Write us your full requirement for evaluation and you will receive response within 20 minutes turnaround time.

Ask Now Help with Problems, Get a Best Answer

Why might a bank avoid the use of interest rate swaps even

Why might a bank avoid the use of interest rate swaps, even when the institution is exposed to significant interest rate

Describe the difference between zero coupon bonds and

Describe the difference between zero coupon bonds and coupon bonds. Under what conditions will a coupon bond sell at a p

Compute the present value of an annuity of 880 per year

Compute the present value of an annuity of $ 880 per year for 16 years, given a discount rate of 6 percent per annum. As

Compute the present value of an 1150 payment made in ten

Compute the present value of an $1,150 payment made in ten years when the discount rate is 12 percent. (Do not round int

Compute the present value of an annuity of 699 per year